Prevailing wage rates · New Jersey · Wage determination
Prevailing wage rates: Warren County, New Jersey
Building construction · NJ20260045 modification 2, published August 13, 2026
The short answer
This sheet sets 37 classifications for building work in Warren County, New Jersey. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $38.68 an hour (painter: brush and roller) to $113.99 (electrician: cable splicer). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0032-010 · Asbestos Workers and Heat & Frost Insulators agreement, September 19, 2024 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (WARREN COUNTY (TOWNSHIPS OF ALLAMUCHY, BLAIRSTOWN AND FRELINGHUYSEN; TOWN OF HACKETTSTOWN; TOWNSHIPS OF HOPE, INDEPENDENCE, KNOWLTON, LIBERTY AND MANSFIELD)) | $51.74 | $46.20 | $97.94 | Agreement |
| ASBE0089-009 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (WARREN COUNTY (TOWNSHIPS OF FRANKLIN, GREENWICH, HARMONY, LOPATCONG, OXFORD, POHATCONG, WASHINGTON AND WHITE)) PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 HRS. PAY | $55.80 | $40.80 | $96.60 | Agreement |
| BRNJ0002-014 · Bricklayers agreement, May 1, 2025 | ||||
BRICKLAYER: INCLUDING CAULKING…Full textBRICKLAYER: INCLUDING CAULKING, CLEANING AND POINTING (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL.) | $49.60 | $37.96 | $87.56 | Agreement |
| BRNJ0002-016 · Bricklayers agreement, May 1, 2025 | ||||
| MASON - STONE (WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL) | $49.60 | $37.96 | $87.56 | Agreement |
| BRNJ0004-001 · Bricklayers agreement, May 1, 2025 | ||||
| CEMENT MASON | $49.60 | $37.96 | $87.56 | Agreement |
| BRNJ0007-022 · Bricklayers agreement, June 2, 2025 | ||||
| TILE SETTER | $64.90 | $37.28 | $102.18 | Agreement |
| TILE FINISHER (WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY.) | $50.05 | $33.90 | $83.95 | Agreement |
| CARP0006-009 · Carpenters agreement, May 1, 2025 | ||||
CARPENTER: SCAFFOLD BUILDER…Full textCARPENTER: SCAFFOLD BUILDER (THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | $57.42 | $34.17 | $91.59 | Agreement |
| CARP0006-010 · Carpenters agreement, May 1, 2025 | ||||
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | $57.42 | $34.17 | $91.59 | Agreement |
| CARP0029-008 · Carpenters agreement, May 1, 2025 | ||||
| SOFT FLOOR LAYER | $57.42 | $34.17 | $91.59 | Agreement |
| CARP0715-007 · Carpenters agreement, May 1, 2025 | ||||
MILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS…Full textMILLWRIGHT (WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER.) | $58.84 | $35.06 | $93.90 | Agreement |
| ELEC0102-023 · Electrical Workers (IBEW) agreement, June 2, 2025 | ||||
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING…Full textELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE.) | $65.43 | $42.86 | $108.29 | Agreement |
ELECTRICIAN: CABLE SPLICER…Full textELECTRICIAN: CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) (WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING (DOES NOT APPLY TO POLE WORK, OR TO USE OF A MANLIFT OR HIGH REACH-TYPE LIFT): 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES THE JOURNEYMAN RATE.) | $69.72 | $44.27 | $113.99 | Agreement |
| ELEV0084-006 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR MECHANIC (PAID HOLIDAYS…Full textELEVATOR MECHANIC (PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY.) (VACATION PAY CREDIT: A WORKER WITH 6 MONTHS BUT LESS THAN 5 YEARS OF SERVICE RECEIVES TWO WEEKS VACATION; A WORKER WITH 5 YEARS OR MORE OF SERVICE RECEIVES THREE WEEKS VACATION.) | $61.41 | $38.44 | $99.85 | Agreement |
| ENGI0825-020 · Operating Engineers agreement, July 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: GROUP 5…Full textPOWER EQUIPMENT OPERATOR: GROUP 5 OILER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $52.88 | $37.50 | $90.38 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $56.59 | $37.50 | $94.09 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.)(PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $58.22 | $37.50 | $95.72 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $60.13 | $37.50 | $97.63 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.) (PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY.) | $61.72 | $37.50 | $99.22 | Agreement |
| IRON0011-016 · Ironworkers agreement, July 1, 2024 | ||||
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $50.74 | $49.37 | $100.11 | Agreement |
| IRONWORKER: REINFORCING | $48.44 | $49.37 | $97.81 | Agreement |
| LABO0008-001 · Laborers agreement, May 1, 2011 | ||||
LABORER: ASBESTOS REMOVAL…Full textLABORER: ASBESTOS REMOVAL (THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTOS AND/OR TOXIC AND HAZARDOUS WASTE OR MATERIALS WHICH SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO: THE ERECTION, MOVING, SERVICING AND DISMANTLING OF ALL ENCLOSURES, SCAFFOLDING AND BARRICADES; THE OPERATION OF ALL TOOLS AND EQUIPMENT NORMALLY USED IN THE REMOVAL OR ABATEMENT OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; THE LABELING, BAGGING, CARTONING, CRATING, OR OTHER PACKAGING OF MATERIALS FOR DISPOSAL; THE CLEAN-UP OF THE WORKSITE; AND ALL OTHER WORK INCIDENTAL TO THE REMOVAL, ABATEMENT, ENCAPSULATION, ENCLOSURE, AND DECONTAMINATION OF ASBESTOS AND TOXIC OR HAZARDOUS WASTE OR MATERIALS; AND, IN ADDITION, ALL WORK TASKS INVOLVED IN THE MAINTENANCE AND OPERATION OF ENERGY RESOURCE RECOVERY PLANTS (CO-GENERATION PLANTS)) | $28.37 | $21.62 | $49.99 | Agreement |
| LABO0077-002 · Laborers agreement, May 1, 2022 | ||||
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 | Agreement |
| LABO0077-005 · Laborers agreement, May 1, 2022 | ||||
LABORER: ASPHALT SHOVELER…Full textLABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 | Agreement |
| PAIN0711-018 · Painters and Allied Trades agreement, May 1, 2025 | ||||
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 | Agreement |
| PAIN0711-021 · Painters and Allied Trades agreement, May 1, 2025 | ||||
GLAZIER (WORK WELDING OR USING A CUTTING TORCH…Full textGLAZIER (WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL.) (WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL.) | $52.68 | $31.29 | $83.97 | Agreement |
| PAIN0711-022 · Painters and Allied Trades agreement, May 1, 2025 | ||||
| PAINTER: SPRAY | $45.55 | $29.86 | $75.41 | Agreement |
| PLAS0029-003 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
| PLASTERER | $54.64 | $30.95 | $85.59 | Agreement |
| PLUM0024-001 · Plumbers and Pipefitters agreement, May 1, 2025 | ||||
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION | $62.09 | $45.05 | $107.14 | Agreement |
| PLUM0274-009 · Plumbers and Pipefitters agreement, May 1, 2022 | ||||
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (WARREN COUNTY (TOWNSHIP OF ALLAMUCHY; BOROUGH OF ALPHA; TOWNSHIP OF BLAIRSTOWN; TOWNSHIP OF FRANKLIN (DOES NOT INCLUDE THE TOWNS OF ASBURY AND NEW VILLAGE); TOWNSHIP OF FRELINGHUYSEN; TOWN OF HACKETTSTOWN; TOWNSHIPS OF HARDWICK, INDEPENDENCE, KNOWLTON, LIBERTY AND MANSFIELD; TOWNSHIP OF POHATCONG (DOES NOT INCLUDE THE TOWNS OF CARPENTERSVILLE, RIEGELSVILLE AND WARREN GLEN); BOROUGH OF WASHINGTON; TOWNSHIP OF WASHINGTON)) | $57.97 | $40.22 | $98.19 | Agreement |
| PLUM0475-015 · Plumbers and Pipefitters agreement, May 1, 2025 | ||||
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (WARREN COUNTY (TOWN OF BELVIDERE; TOWNSHIP OF FRANKLIN (TOWNS OF ASBURY AND NEW VILLAGE ONLY); TOWNSHIPS OF GREENWICH, HARMONY, HOPE, LOPATCONG AND OXFORD; TOWN OF PHILLIPSBURG; TOWNSHIP OF POHATCONG (TOWNS OF CARPENTERSVILLE, RIEGELSVILLE AND WARREN GLEN ONLY); TOWNSHIP OF WHITE)) | $56.34 | $50.80 | $107.14 | Agreement |
| ROOF0004-007 · Roofers agreement, June 1, 2024 | ||||
| ROOFER: INCLUDES ALL TYPES OF ROOFS | $44.52 | $32.25 | $76.77 | Agreement |
| SFNJ0669-007 · SFNJ, April 1, 2025 | ||||
| SPRINKLER FITTER: FIRE SPRINKLERS | $59.19 | $36.51 | $95.70 | SFNJ |
| SHEE0019-016 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (PAID HOLIDAY: ELECTION DAY.) | $45.02 | $44.09 | $89.11 | Agreement |
| SUNJ2004-021 · Survey of contractors in NJ, January 2, 2009 | ||||
| PAINTER: BRUSH AND ROLLER | $32.91 | $5.77 | $38.68 | Survey |
| TEAM0469-005 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER: OFF THE ROAD TRUCK…Full textTRUCK DRIVER: OFF THE ROAD TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) (VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)) | $48.78 | $42.66 | $91.44 | Agreement |
TRUCK DRIVER: DUMP TRUCK…Full textTRUCK DRIVER: DUMP TRUCK (HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FOR ANY WORKERS OTHER THAN THE TRUCK DRIVER: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE WHERE THE WORKER IS NOT WORKING IN A ZONE REQUIRING LEVEL A, B OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL.) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY.) (VACATION PAY CREDIT: WORKERS WORKING OR RECEIVING PAY FOR 80 DAYS WITHIN A YEAR RECEIVE ONE WEEK PAID VACATION (48 HOURS); 125 DAYS RECEIVE TWO WEEKS PAID VACATION (96 HOURS); 145 DAYS RECEIVE 15 DAYS PAID VACATION (120 HOURS); 15 YEARS SENIORITY AND 145 DAYS RECEIVE 4 WEEKS PAID VACATION (160 HOURS)) | $48.63 | $42.66 | $91.29 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | August 13, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on NJ20260045?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator