CertifiedHours

Prevailing wage rates · New Jersey · Wage determination

Prevailing wage rates: Ocean County, New Jersey

Building construction · NJ20260039 modification 1, published May 18, 2026

The short answer

This sheet sets 39 classifications for building work in Ocean County, New Jersey. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $49.99 an hour (asbestos removal laborer the removal) to $110.29 (elevator a. paid vacation). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0089-004 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR…
Full text

ASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT)

PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 HRS. PAY

$55.80$40.80$96.60Agreement
BRNJ0002-013 · Bricklayers agreement, May 1, 2021
BRICKLAYER Work on high stacks: 22% per hour additional.$45.20$33.26$78.46Agreement
BRNJ0007-017 · Bricklayers agreement, June 2, 2025
TILE SETTER$52.31$38.01$90.32Agreement
TILE Work grouting all epoxy: $10.00 additional per day$43.63$32.12$75.75Agreement
CARP0006-011 · Carpenters agreement, May 1, 2025
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK)$57.42$34.17$91.59Agreement
ELEC0400-005 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIAN & CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING)$57.70$45.92$103.62Agreement
ELEV0005-004 · Elevator Constructors agreement, January 1, 2025
ELEVATOR A. PAID VACATION…
Full text

ELEVATOR A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight

Paid Holidays: (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day

$71.85$38.44$110.29Agreement
ENGI0825-020 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS: GROUP 5…
Full text

POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY

$52.88$37.50$90.38Agreement
POWER EQUIPMENT OPERATORS: GROUP 4…
Full text

POWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY

$56.59$37.50$94.09Agreement
POWER EQUIPMENT OPERATORS: GROUP 3…
Full text

POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY

$58.22$37.50$95.72Agreement
POWER EQUIPMENT OPERATORS: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY

$60.13$37.50$97.63Agreement
POWER EQUIPMENT OPERATORS: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY

$61.72$37.50$99.22Agreement
IRON0011-008 · Ironworkers agreement, July 1, 2025
IRONWORKER: STRUCTURAL AND ORNAMENTAL (NORTHERN THIRD OF COUNTY)$52.24$50.32$102.56Agreement
IRONWORKER: REINFORCING (NORTHERN THIRD OF COUNTY)$49.94$50.32$100.26Agreement
IRON0399-012 · Ironworkers agreement, July 1, 2024
IRONWORKER: REINFORCING (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY)$53.24$38.40$91.64Agreement
IRONWORKER: STRUCTURAL AND ORNAMENTAL (MIDDLE THIRD AND SOUTHERN THIRD OF COUNTY)$54.24$38.40$92.64Agreement
LABO0008-001 · Laborers agreement, May 1, 2011
ASBESTOS REMOVAL LABORER The removal…
Full text

ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants)

$28.37$21.62$49.99Agreement
LABO0077-002 · Laborers agreement, May 1, 2022
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE$36.50$30.22$66.72Agreement
LABO0077-005 · Laborers agreement, May 1, 2022
LABORER: ASPHALT SHOVELER…
Full text

LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN

$35.75$30.22$65.97Agreement
PAIN0021-034 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER (OCEAN COUNTY…
Full text

GLAZIER (OCEAN COUNTY (SOUTH OF A LINE DRAWN BETWEEN THESE CITIES: FLORENCE TO BUSTLETON TO COLUMBUS TO JOBSTOWN TO PEMBERTON TO ONGS HAT TO CHATSWORTH TO WHITING TO PINEWALD TO OCEAN GATE TO SEASIDE HEIGHTS)) WORK AT 30 FT. ABOVE THE WORKING SURFACE, OR ON A SWING STAGE: $1.00 PER HOUR ADDITIONAL

$49.96$35.11$85.07Agreement
PAIN0711-016 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER (OCEAN COUNTY…
Full text

GLAZIER (OCEAN COUNTY (NORTH OF A LINE DRAWN BETWEEN THESE CITIES: FLORENCE TO BUSTLETON TO COLUMBUS TO JOBSTOWN TO PEMBERTON TO ONGS HAT TO CHATSWORTH TO WHITING TO PINEWALD TO OCEAN GATE TO SEASIDE HEIGHTS):) WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL

$52.68$31.29$83.97Agreement
PAIN0711-018 · Painters and Allied Trades agreement, May 1, 2025
DRYWALL FINISHER/TAPER$44.87$30.15$75.02Agreement
PAIN0711-019 · Painters and Allied Trades agreement, May 1, 2025
PAINTER (BRUSH & ROLLER)$45.55$29.86$75.41Agreement
PAINTER (SPRAY)$45.55$29.86$75.41Agreement
PLAS0008-007 · Plasterers and Cement Masons agreement, May 1, 2021
PLASTERER$38.37$31.64$70.01Agreement
PLAS0592-036 · Plasterers and Cement Masons agreement, May 1, 2025
CEMENT MASON/CONCRETE FINISHER$53.21$33.42$86.63Agreement
PLUM0009-018 · Plumbers and Pipefitters agreement, July 1, 2025
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION…
Full text

PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE)

$59.57$46.45$106.02Agreement
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION…
Full text

PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE)

$59.57$46.45$106.02Agreement
PIPEFITTER: SERVICE AND REPAIR…
Full text

PIPEFITTER: SERVICE AND REPAIR (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE)

$46.23$29.23$75.46Agreement
PLUMBER: SERVICE AND REPAIR…
Full text

PLUMBER: SERVICE AND REPAIR (OCEAN COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE)

$46.23$29.23$75.46Agreement
PLUM0322-007 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION…
Full text

PLUMBER: EXCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (SOUTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE))

$56.30$50.76$107.06Agreement
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION…
Full text

PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION (OCEAN COUNTY (SOUTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN FOLLOWING A LINE WESTERLY THROUGH THE MIDDLE OF THE BARNEGAT INLET, CONTINUING WEST THROUGH BARNEGAT BAY INTO THE TOWN OF WARETOWN; THEN, CONTINUING ALONG COUNTY ROAD ROUTE 532 UNTIL COUNTY ROAD ROUTE 532 BECOMES STATE HIGHWAY ROUTE 72; THEN, CONTINUING ALONG STATE HIGHWAY ROUTE 72 UNTIL IT REACHES THE BURLINGTON COUNTY LINE))

$56.30$50.76$107.06Agreement
ROOF0030-027 · Roofers agreement, May 1, 2025
ROOFER: SHINGLES MOPPER…
Full text

ROOFER: SHINGLES MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL.

PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY

$35.95$21.85$57.80Agreement
ROOFER: SLATE AND TILE MOPPER…
Full text

ROOFER: SLATE AND TILE MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL.

PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY

$38.95$21.85$60.80Agreement
ROOFER: ALL OTHER WORK MOPPER…
Full text

ROOFER: ALL OTHER WORK MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL.

PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY

$46.03$34.27$80.30Agreement
SFNJ0669-006 · SFNJ, April 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$59.19$36.51$95.70SFNJ
SHEE0027-009 · Sheet Metal Workers agreement, June 1, 2024
SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION)$59.08$47.06$106.14Agreement
TEAM0469-004 · Teamsters agreement, May 1, 2025
TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK…
Full text

TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour

PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours)

$48.78$42.66$91.44Agreement
TRUCK DRIVER: DUMP HAZARDOUS WASTE REMOVAL WORK…
Full text

TRUCK DRIVER: DUMP HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour

PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours)

$48.63$42.66$91.29Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NJ20260039?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator