This sheet sets 38 classifications for building work in Monmouth County, New Jersey. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $49.99 an hour (asbestos removal laborer the removal) to $111.32 (sprinkler fitter: fire sprinklers (remainder of monmouth county)). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0032-005 · Asbestos Workers and Heat & Frost Insulators agreement, September 19, 2024 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (MONMOUTH COUNTY (Township of Aberdeen; Borough of Allenhurst; City of Asbury Park; Boroughs of Atlantic Highlands, Avon-by-the-sea, Belmar and Bradley Beach; Township of Colts Neck; Boroughs of Deal, Eatontown and Fair Haven; Township of Hazlet; Borough of Highlands; Township of Holmdel; Boroughs of Keansburg, Keyport and Little Silver; Township of Marlboro; Borough of Matawan; Township of Middletown; Borough of Monmouth Beach; Township of Neptune; Boroughs of Neptune City, Oceanport, Red Bank, Sea Bright and Shrewsbury; Township of Shrewsbury; Boroughs of South Belmar, Union Beach and West Long Branch) | $51.74 | $46.20 | $97.94 | Agreement |
| ASBE0089-005 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR: (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (MONMOUTH COUNTY (BOROUGH OF FREEHOLD; TOWNSHIPS OF FREEHOLD, HOWELL, MILLSTONE, UPPER FREEHOLD AND WALL)). PAID HOLIDAYS: THE LAST DAY PRIOR TO THE CHRISTMAS AND NEW YEAR'S DAY OBSERVED HOLIDAY: 4 HRS. PAY | $55.80 | $40.80 | $96.60 | Agreement |
| BRNJ0002-013 · Bricklayers agreement, May 1, 2021 | ||||
| BRICKLAYER Work on high stacks: 22% per hour additional | $45.20 | $33.26 | $78.46 | Agreement |
| BRNJ0007-016 · Bricklayers agreement, June 2, 2025 | ||||
| TILE SETTER (MONMOUTH COUNTY (NORTH OF ROUTE 33)) | $64.90 | $37.28 | $102.18 | Agreement |
TILE FINISHER (MONMOUTH COUNTY…Full textTILE FINISHER (MONMOUTH COUNTY (NORTH OF ROUTE 33)) WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY | $50.05 | $33.90 | $83.95 | Agreement |
| BRNJ0007-019 · Bricklayers agreement, June 2, 2025 | ||||
| TILE SETTER (MONMOUTH COUNTY (SOUTH OF ROUTE 33)) | $64.90 | $37.28 | $102.18 | Agreement |
TILE FINISHER (MONMOUTH COUNTY…Full textTILE FINISHER (MONMOUTH COUNTY (SOUTH OF ROUTE 33)) WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY | $50.05 | $33.90 | $83.95 | Agreement |
| CARP0006-011 · Carpenters agreement, May 1, 2025 | ||||
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING AND FORMWORK) | $57.42 | $34.17 | $91.59 | Agreement |
| ELEC0400-005 · Electrical Workers (IBEW) agreement, June 2, 2025 | ||||
| ELECTRICIAN & CABLE SPLICER (INCLUDING LOW VOLTAGE WIRING) | $57.70 | $45.92 | $103.62 | Agreement |
| ELEV0005-004 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR A. PAID VACATION…Full textELEVATOR A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid Holidays: (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day | $71.85 | $38.44 | $110.29 | Agreement |
| ENGI0825-020 · Operating Engineers agreement, July 1, 2025 | ||||
POWER EQUIPMENT OPERATORS: GROUP 5…Full textPOWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $52.88 | $37.50 | $90.38 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 4…Full textPOWER EQUIPMENT OPERATORS: GROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $56.59 | $37.50 | $94.09 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 3…Full textPOWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $58.22 | $37.50 | $95.72 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $60.13 | $37.50 | $97.63 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER WORKS THREE OF THE PRECEDING FIVE WORK DAYS BEFORE THE HOLIDAY; OR, THE WORK DAY BEFORE THE HOLIDAY AND THE WORK DAY AFTER THE HOLIDAY; AND, 2) THAT THE WORKER WORKS THE WORK DAY BEFORE AND THE WORK DAY AFTER THE HOLIDAY | $61.72 | $37.50 | $99.22 | Agreement |
| IRON0011-007 · Ironworkers agreement, July 1, 2025 | ||||
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 | $102.56 | Agreement |
| IRONWORKER: REINFORCING | $49.94 | $50.32 | $100.26 | Agreement |
| LABO0008-001 · Laborers agreement, May 1, 2011 | ||||
ASBESTOS REMOVAL LABORER The removal…Full textASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontamination of personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materials for disposal; the clean-up of the worksite; and all other work incidental to the removal, abatement, encapsulation, enclosure, and decontamination of asbestos and toxic or hazardous waste or materials; and, in addition, all work tasks involved in the maintenance and operation of energy resource recovery plants (co-generation plants) | $28.37 | $21.62 | $49.99 | Agreement |
| LABO0077-002 · Laborers agreement, May 1, 2022 | ||||
| LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 | $66.72 | Agreement |
| LABO0077-005 · Laborers agreement, May 1, 2022 | ||||
LABORER: ASPHALT SHOVELER…Full textLABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 | $65.97 | Agreement |
| PAIN0711-017 · Painters and Allied Trades agreement, May 1, 2025 | ||||
GLAZIER WORK WELDING OR USING A CUTTING TORCH…Full textGLAZIER WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR ADDITIONAL. WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM IS 30 FT. OR ABOVE; AND ON MOTORIZED LIFTS PROVIDED THAT THE HEIGHT OF THE LIFT PLATFORM IS ABOVE THE SECOND FLOOR OR ABOVE THIRTY FEET: $1.00 PER HOUR ADDITIONAL | $52.68 | $31.29 | $83.97 | Agreement |
| PAIN0711-018 · Painters and Allied Trades agreement, May 1, 2025 | ||||
| DRYWALL FINISHER/TAPER | $44.87 | $30.15 | $75.02 | Agreement |
| PLAS0008-007 · Plasterers and Cement Masons agreement, May 1, 2021 | ||||
| PLASTERER | $38.37 | $31.64 | $70.01 | Agreement |
| PLAS0592-036 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER | $53.21 | $33.42 | $86.63 | Agreement |
| PLUM0009-017 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $59.57 | $46.45 | $106.02 | Agreement |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $59.57 | $46.45 | $106.02 | Agreement |
| PIPEFITTER: SERVICE AND REPAIR | $46.23 | $29.23 | $75.46 | Agreement |
| PLUMBER: SERVICE AND REPAIR | $46.23 | $29.23 | $75.46 | Agreement |
| ROOF0004-009 · Roofers agreement, June 1, 2024 | ||||
ROOFER (MONMOUTH COUNTY…Full textROOFER (MONMOUTH COUNTY (EAST OF ROUTE #571) Mop person: $.30 per hour additional. Work on a job where pitch is being applied: $.50 per hour additional | $44.52 | $32.25 | $76.77 | Agreement |
| ROOF0030-026 · Roofers agreement, May 1, 2025 | ||||
ROOFER, SLATE AND TILE…Full textROOFER, SLATE AND TILE (MONMOUTH COUNTY (WEST OF ROUTE #571)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL. PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY | $38.95 | $21.85 | $60.80 | Agreement |
ROOFER, SHINGLES (MONMOUTH COUNTY…Full textROOFER, SHINGLES (MONMOUTH COUNTY (WEST OF ROUTE #571)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL. PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY | $35.95 | $21.85 | $57.80 | Agreement |
ROOFER, ALL OTHER WORK…Full textROOFER, ALL OTHER WORK (MONMOUTH COUNTY (WEST OF ROUTE #571)) MOPPER, AND OPERATOR OF FELT-LAYING MACHINE: $.50 PER HOUR ADDITIONAL. WORK APPLYING ROOFING MATERIAL, ON ANY NEW CONSTRUCTION JOB, ON THOSE DAYS ON WHICH A FELT-LAYING MACHINE OR SLAG DISPENSING MACHINE IS USED: $.50 PER HOUR ADDITIONAL. PAID HOLIDAY: THE LAST WORKING DAY BEFORE CHRISTMAS, TO BE PAID AT THE RATE OF FOUR HOURS PAY | $46.03 | $34.27 | $80.30 | Agreement |
| SFNJ0669-003 · SFNJ, April 1, 2025 | ||||
| SPRINKLER FITTER: FIRE SPRINKLERS (MERCER COUNTY (DOES NOT INCLUDE THE TOWN OF TRENTON)) | $59.19 | $36.51 | $95.70 | SFNJ |
| SFNJ0669-004 · SFNJ, July 1, 2025 | ||||
| SPRINKLER FITTER: FIRE SPRINKLERS (REMAINDER OF MONMOUTH COUNTY) | $69.97 | $41.35 | $111.32 | SFNJ |
| SFNJ0696-003 · SFNJ, January 1, 2025 | ||||
SPRINKLER FITTER: FIRE SPRINKLERS…Full textSPRINKLER FITTER: FIRE SPRINKLERS (MONMOUTH COUNTY (NORTH OF A LINE DRAWN FROM THE ATLANTIC OCEAN, FOLLOWING ROUTE 36 WEST TO THE GARDEN STATE PARKWAY; THEN, SOUTH ON THE GARDEN STATE PARKWAY TO ROUTE 33; THEN, WEST ON ROUTE 33 TO THE MIDDLESEX COUNTY LINE)) | $67.97 | $39.35 | $107.32 | SFNJ |
| SHEE0027-009 · Sheet Metal Workers agreement, June 1, 2024 | ||||
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $59.08 | $47.06 | $106.14 | Agreement |
| TEAM0469-004 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK…Full textTRUCK DRIVER: OFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours) | $48.78 | $42.66 | $91.44 | Agreement |
TRUCK DRIVER: DUMP HAZARDOUS WASTE REMOVAL WORK…Full textTRUCK DRIVER: DUMP HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the truck driver: $3.00 per hour additional. Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour PAID HOLIDAYS: New Year's Day, President's Day, Decoration Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas VACATION PAY CREDIT: Workers working or receiving pay for 80 days within a year receive one week paid vacation (48 hours); 125 days receive two weeks paid vacation (96 hours); 145 days receive 15 days paid vacation (120 hours); 15 years seniority and 145 days receive 4 weeks paid vacation (160 hours) | $48.63 | $42.66 | $91.29 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on NJ20260037?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator