CertifiedHours

Prevailing wage rates · North Dakota · Wage determination

Prevailing wage rates: Adams, Barnes, Benson and 50 more counties, North Dakota

Highway construction · ND20260001 modification 5, published October 1, 2026

The short answer

This sheet sets 27 classifications for highway work in Adams, Barnes, Benson and 50 more counties, North Dakota. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $35.70 an hour (laborer: group 3) to $79.90 (electrician: electrician: burliegh, morton, stark). Your contract may lock an earlier modification.

What changed this year

First published January 16, 2026, this sheet is now on modification 5, and its rates have changed in 4 modifications. Of the 16 rates we can follow line by line from the first publication to today, 8 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

October 1, 2026 · modification 5

Classification names reworded; 9 rates raised among the 17 lines we could match

  • Laborer: 3 rates raised by $1.00 an hour
  • Truck driver: 3 rates raised by $2.00 an hour
  • Carpenter: 1 rate raised by $1.50 an hour
  • Cement mason/concrete finisher: 1 rate raised by $1.50 an hour
  • Electrician: 1 rate raised by $5.20 an hour

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (9)
ClassificationWasNowChange
CARPENTER$38.70 + $9.00$39.45 + $9.75+$1.50 (+3.1%)
CEMENT MASON/CONCRETE FINISHER$38.70 + $9.00$39.45 + $9.75+$1.50 (+3.1%)
ELECTRICIAN: CASS COUNTY$37.41 + $16.75$40.00 + $19.36+$5.20 (+9.6%)
LABORER: GROUP 1: GENERAL CONSTRUCTION LABORERS; SACK SHAKER (CEMENT AND MINERAL FILLER)…$30.90 + $3.40$31.40 + $3.90+$1.00 (+2.9%)
LABORER: GROUP 3: CAISSON WORKER; BOTTOM MAN (SANITARY SEWER, STORM SEWER WATER AND GAS…$31.30 + $3.40$31.80 + $3.90+$1.00 (+2.9%)
LABORER: GROUP 4: PIPE LAYERS (SANITARY SEWER, STORM SEWER, WATER AND GAS LINES); DRILL…$32.05 + $3.40$32.55 + $3.90+$1.00 (+2.8%)
TRUCK DRIVER: EUCLID OVER 20 YDS$35.79 + $19.28$37.09 + $19.98+$2.00 (+3.6%)
TRUCK DRIVER: SINGLE AXLE TRUCKS$33.84 + $19.28$35.14 + $19.98+$2.00 (+3.8%)
TRUCK DRIVER: TANDEM TRI/AXLE TRUCK$33.96 + $19.28$35.26 + $19.98+$2.00 (+3.8%)

Earlier modifications

  • August 6, 2026 · modification 4No rate changed (wording or notes only)
  • July 30, 2026 · modification 36 rates raised, 1 rate lowered
    • Power equipment operator: 6 rates raised by $0.65 an hour
    • Line construction: 1 rate lowered by $4.70 an hour
    Every line that changed (7)
    ClassificationWasNowChange
    LINE CONSTRUCTION: GROUNDMAN$31.32 + $19.39$31.32 + $14.69−$4.70 (−9.3%)
    POWER EQUIPMENT OPERATOR GROUP 6: Brakeman or Switchman, Dredge or Tugboat Deckhand, Dri…$33.20 + $22.45$33.20 + $23.10+$0.65 (+1.2%)
    POWER EQUIPMENT OPERATOR GROUP 5: Boom Truck- A- Frame or Hydraulic 2 tons up to and inc…$34.00 + $22.45$34.00 + $23.10+$0.65 (+1.2%)
    POWER EQUIPMENT OPERATOR GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person (Cont…$34.85 + $22.45$34.85 + $23.10+$0.65 (+1.1%)
    POWER EQUIPMENT OPERATOR GROUP 3: Lazer-Screed Operator, Asphalt Paving Machine Operator…$35.00 + $22.45$35.00 + $23.10+$0.65 (+1.1%)
    POWER EQUIPMENT OPERATOR GROUP 2: All Cranes 59 tons and under, Backhoe Operator 3 CY. a…$35.25 + $22.45$35.25 + $23.10+$0.65 (+1.1%)
    POWER EQUIPMENT OPERATOR GROUP 1: All Cranes 60 tons and over, Cranes doing piling, shee…$36.65 + $22.45$36.65 + $23.10+$0.65 (+1.1%)
  • May 18, 2026 · modification 2Classification names reworded; 10 fringe formulas changed among the 27 lines we could match
    • Electrician: 6 fringe formulas changed
    • Line construction: 4 fringe formulas changed

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

    Every line that changed (10)
    ClassificationWasNowChange
    ELECTRICIAN: ELECTRICIAN:: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EMMO…$55.35 + 10.71+25%$55.35 + $24.55changed
    ELECTRICIAN: CABLE SPLICER:: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EM…$55.35 + 10.71+25%$55.35 + $24.55changed
    LINE CONSTRUCTION: LINEMAN::$55.35 + 10.71+25%$55.35 + $24.55changed
    LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR::$47.00 + 10.46+25%$47.00 + $22.21changed
    LINE CONSTRUCTION: GROUNDMAN::$31.32 + 14.69+15%$31.32 + $19.39changed
    LINE CONSTRUCTION: CABLE SPLICER::$55.35 + 10.71+25%$55.35 + $24.55changed
    ELECTRICIAN: ELECTRICIAN:: BURLIEGH, MORTON, STARK:$55.35 + 10.71+25%$55.35 + $24.55changed
    ELECTRICIAN: CABLE SPLICER:: BURLIEGH, MORTON, STARK:$55.35 + 25%+10.71$55.35 + $24.55changed
    ELECTRICIAN: ELECTRICIAN:: BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS,…$55.35 + 25%+10.71$55.35 + $24.55changed
    ELECTRICIAN: CABLE SPLICER:: BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS…$55.35 + 25%+10.71$55.35 + $24.55changed
  • January 30, 2026 · modification 110 fringe formulas changed
    • Electrician cable splicer: 3 fringe formulas changed
    • Electrician electrician: 3 fringe formulas changed
    • Line construction cable splicer: 1 fringe formula changed
    • Line construction groundman: 1 fringe formula changed
    • Line construction line equipment operator: 1 fringe formula changed
    • Line construction lineman: 1 fringe formula changed
    Every line that changed (10)
    ClassificationWasNowChange
    ELECTRICIAN CABLE SPLICER$53.48 + 8.80+29.5%$55.35 + 10.71+25%changed
    ELECTRICIAN ELECTRICIAN$53.48 + 8.80+29.5%$55.35 + 10.71+25%changed
    LINE CONSTRUCTION CABLE SPLICER$53.48 + 8.80+29.5%$55.35 + 10.71+25%changed
    LINE CONSTRUCTION GROUNDMAN$30.26 + 8.80+19.5%$31.32 + 14.69+15%changed
    LINE CONSTRUCTION LINE EQUIPMENT OPERATOR$45.41 + 8.80+29.5%$47.00 + 10.46+25%changed
    LINE CONSTRUCTION LINEMAN$53.48 + 8.80+29.5%$55.35 + 10.71+25%changed
    ELECTRICIAN CABLE SPLICER$53.48 + 29.5%+8.8$55.35 + 25%+10.71changed
    ELECTRICIAN ELECTRICIAN$53.48 + 8.80+29.5%$55.35 + 10.71+25%changed
    ELECTRICIAN CABLE SPLICER$53.48 + 29.5%+8.80$55.35 + 25%+10.71changed
    ELECTRICIAN ELECTRICIAN$53.48 + 29.5%+8.80$55.35 + 25%+10.71changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 5 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 16Source
ELEC0714-018 · Electrical Workers (IBEW) agreement, November 30, 2025
ELECTRICIAN: CABLE SPLICER…
Full text

ELECTRICIAN: CABLE SPLICER: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE, MCLEAN, MERCER, MOUNTRIAL, OLIVER, PIERCE, RENVILLE, ROLLETTE, SHERIDAN, SOIUX, SLOPE, WARD, & WILLIAMS COUNTIES

$55.35$24.55$79.90—Agreement, 2025
ELECTRICIAN: ELECTRICIAN…
Full text

ELECTRICIAN: ELECTRICIAN: ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE, MCLEAN, MERCER, MOUNTRIAL, OLIVER, PIERCE, RENVILLE, ROLLETTE, SHERIDAN, SOIUX, SLOPE, WARD, & WILLIAMS COUNTIES

$55.35$24.55$79.90—Agreement, 2025
ELEC0714-019 · Electrical Workers (IBEW) agreement, November 30, 2025
LINE CONSTRUCTION: CABLE SPLICER$55.35$24.55$79.90changedAgreement, 2025
LINE CONSTRUCTION: GROUNDMAN$31.32$14.69$46.01changedAgreement, 2025
LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR$47.00$22.21$69.21changedAgreement, 2025
LINE CONSTRUCTION: LINEMAN$55.35$24.55$79.90changedAgreement, 2025
ELEC0714-020 · Electrical Workers (IBEW) agreement, November 30, 2025
ELECTRICIAN: CABLE SPLICER: BURLIEGH, MORTON, STARK$55.35$24.55$79.90changedAgreement, 2025
ELECTRICIAN: ELECTRICIAN: BURLIEGH, MORTON, STARK$55.35$24.55$79.90changedAgreement, 2025
ELEC1426-002 · Electrical Workers (IBEW) agreement, November 30, 2025
ELECTRICIAN: CABLE SPLICER…
Full text

ELECTRICIAN: CABLE SPLICER: BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS, GRIGGS, KIDDER, LA MOURE, LOGAN, MCINTOSH, NELSON, PEMBINA, RAMSEY, RANSOM, RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER, TRAILL, WALSH, AND WELLS COUNTIES

$55.35$24.55$79.90changedAgreement, 2025
ELECTRICIAN: ELECTRICIAN…
Full text

ELECTRICIAN: ELECTRICIAN: BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS, GRIGGS, KIDDER, LA MOURE, LOGAN, MCINTOSH, NELSON, PEMBINA, RAMSEY, RANSOM, RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER, TRAILL, WALSH, AND WELLS COUNTIES

$55.35$24.55$79.90changedAgreement, 2025
ENGI0049-021 · Operating Engineers agreement, October 1, 2026
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1: ALL CRANES 60 TONS AND OVER; CRANES DOING PILING, SHEETING, DRAGLINE/CLAM WORK; DERRICK (GUY & STIFF); GENTRY CRANE OPERATOR, HELICOPTER OPERATOR; MOLE OPERATOR OR TUNNEL MUCKING MACHINE; POWER SHOVEL 3-1/2 CUBIC YARDS AND OVER (MACHINE STANDARD MFG. RATING); TRAVELING TOWER CRANE

$38.25$24.05$62.30—Agreement, 2026
POWER EQUIPMENT OPERATOR: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: GROUP 2: ALL CRANES 59 TONS AND UNDER; BACKHOE OPERATOR 3 CUBIC YARDS AND OVER (MACHINE STANDARD MFG. RATING); CRETER CRANE; DREDGE OPERATOR 12� AND OVER; FINISH DOZER; FINISH MOTOR GRADER; FRONT END LOADER OPERATOR 8 CUBIC YARDS AND OVER (MACHINE STANDARD MFG. RATING); MASTER MECHANIC (WHEN SUPERVISING 5 OR MORE MECHANICS); MON-O-RAIL HOIST OPERATOR; POWER SHOVEL UP TO AND INCLUDING 3 CUBIC YARDS (MACHINE STANDARD MFG. RATING); TUGBOAT

$36.85$24.05$60.90—Agreement, 2026
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3: ASPHALT PAVING MACHINE OPERATOR; ASPHALT PLANT OPERATOR; AUTOMATED GRADE TRIMMER; BACKHOE OPERATOR 1 CUBIC YARD UP TO AND INCLUDING 2-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); BOOM TRUCK, HYDRAULIC (8 TONS & OVER); CABLEWAY OPERATOR; CONCRETE BATCH PLANT OPERATOR (ELECTRONIC OR MANUAL); CONCRETE MIXER PAVING MACHINE OPERATOR; CONCRETE PAVER � BRIDGE DECKS; CONCRETE PUMP; CONCRETE SPREADER OPERATOR & BELT PLACER; CRUSHING PLANT OPERATOR; DOZER OPERATOR; DREDGE OPERATOR OR ENGINEER 11'' AND UNDER; DRILL RIGS, HEAVY DUTY ROTARY OR CHUM OR CABLE DRILL; FRONT END LOADER - 3-1/2 CUBIC YARDS UP TO AND INCLUDING 7-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); GRAVEL WASHING & SCREENING PLANT OPERATOR; LAZER-SCREED OPERATOR; LOCOMOTIVE, ALL TYPES; MECHANIC OR WELDER (HEAVY DUTY); MOTOR GRADE OPERATOR; PAVING BREAKER � NON-HYDRO HAMMER TYPE; PIPELINE WRAPPING, CLEANING & BENDING MACHINE OPERATOR; POWER ACTUATED AUGER AND HORIZONTAL BORING MACHINE OPERATOR 6'' AND OVER; REFRIGERATION PLANT ENGINEER; ROTO MILLING MACHINE (SURFACE PLANER) 43'' & OVER; SCRAPER OPERATOR; SLIP FORM CONCRETE PAVING OPERATOR; TANDEM PUSHED QUAD 9 OR SIMILAR; TRACTOR WITH BOOM ATTACHMENT; TRENCHING MACHINE- 100 HP. AND OVER

$36.60$24.05$60.65—Agreement, 2026
POWER EQUIPMENT OPERATOR: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: GROUP 4: ARTICULATED/OFF ROAD HAULER; ASPHALT DUMP PERSON (CONTROLS THE SPREAD OF ASPHALT); ASPHALT PAVING SCREED OPERATOR; BACKHOE � UP TO AND INCLUDING 1/2 CUBIC YARD (MACHINE STANDARD MFG. RATING); BORING MACHINE LOCATOR; CONSOLE BOARD OPERATOR; CURB MACHINE OPERATOR; DISTRIBUTOR OPERATOR (BITUMINOUS); FORKLIFT OPERATOR; FRONT END LOADER- 1-1/2 CUBIC YARDS UP TO AND INCLUDING 3 CUBIC YARDS (MACHINE STANDARD MFG. RATING); FUEL/LUBE TRUCK OPERATOR; GRADE PERSON (RESPONSIBLE FOR ESTABLISHING AND DETERMINING GRADE THROUGH INSTRUMENTATION); GRAVEL SCREENING PLANT OPERATOR (NOT CRUSHING OR WASHING); GREASER; HYDRO VAC AND HYDRO EXCAVATOR SELF-PROPELLED; LONGITUDINAL FLOAT AND SPRAY OPERATOR; MICRO SURFACER MACHINE; MOTOR GRADE OPERATOR � HAUL ROADS; PAVING BREAKER � HYDRO HAMMER TYPE; PUGMILL OPERATOR; PUSH TRACTOR; ROLLER, STEEL & RUBBER ON HOT MIX ASPHALT PAVING; ROTOMILL MACHINE (SURFACE PLANER), UP TO AND INCLUDING 42''; RUMBLE STRIP MACHINE; SAND AND CHIP SPREADER; SELF-PROPELLED SHEEPSFOOT PACKER WITH OR WITHOUT BLADE ATTACHMENT; SELF-PROPELLED TRAVELING SOIL STABILIZER; SHEEPSFOOT PACKER WITH DOZER ATTACHMENT � 100 HP AND OVER; SHOULDERING MACHINE; SLIP FORM, CURB & GUTTER OPERATOR; SLURRY SEAL MACHINE; TAMPING MACHINE OPERATOR; TIE TAMPER AND BALLAST MACHINE; TRENCHING MACHINE OPERATOR � 46 HP UP TO AND INCLUDING 99 HP; TRUCK MECHANIC; WELL POINTS; TUB GRINDER

$36.45$24.05$60.50—Agreement, 2026
POWER EQUIPMENT OPERATOR: GROUP 5…
Full text

POWER EQUIPMENT OPERATOR: GROUP 5: BOOM TRUCK- A- FRAME OR HYDRAULIC, 2 TONS UP TO AND INCLUDING 7 TONS; BROOM � SELF-PROPELLED; CONCRETE SAW (POWER OPERATED); CURE BRIDGE OPERATOR; FRONT END LOADER OPERATOR, LESS THAN 1-1/2 CUBIC YARDS (MACHINE STANDARD MFG. RATING); MOBILE CEMENT MIXER-NON-TRUCK; POWER ACTUATED AUGER & HORIZONTAL BORING MACHINE OPERATOR UP TO AND INCLUDING 5�; ROLLER, ON OTHER THAN HOT MIX ASPHALT PAVING; OILERS; SKID STEER OPERATOR WITH ATTACHMENTS; VIBRATING PACKER OPERATOR (PAD TYPE) SELF-PROPELLED; WATER SPRAYING EQUIPMENT � SELF-PROPELLED

$35.60$24.05$59.65—Agreement, 2026
POWER EQUIPMENT OPERATOR: GROUP 6…
Full text

POWER EQUIPMENT OPERATOR: GROUP 6: BRAKEMAN OR SWITCHMAN; DREDGE OR TUGBOAT DECKHAND; DRILL TRUCK GRAVEL/TESTING OPERATOR; FORM TRENCH DIGGER (POWER); GUNITE OPERATOR GUNALL; PAINT MACHINE STRIPING OPERATOR; PICK-UP SWEEPER, 1 CUBIC YARD & OVER HOPPER CAPACITY; SCISSOR JACK � SELF-PROPELLED PLATFORM LIFT; STRAW MULCHER, BLOWER AND STRAW PRESS; STUMP CHIPPER OPERATOR; TILLAGE EQUIPMENT OPERATOR; TRACTOR PULLING COMPACTION OR AERATING EQUIPMENT AND NO TILL DRILLS; TRENCHING MACHINE OPERATOR � UP TO AND INCLUDING 45 HP

$34.80$24.05$58.85—Agreement, 2026
SAND2025-001 · SAND, October 1, 2026
CARPENTER$39.45$9.75$49.20+$1.50 (+3.1%)SAND
CEMENT MASON/CONCRETE FINISHER$39.45$9.75$49.20+$1.50 (+3.1%)SAND
ELECTRICIAN: CASS COUNTY$40.00$19.36$59.36+$5.20 (+9.6%)SAND
LABORER: GROUP 1…
Full text

LABORER: GROUP 1: GENERAL CONSTRUCTION LABORERS; SACK SHAKER (CEMENT AND MINERAL FILLER); PIPE HANDLER; DRILL RUNNER TENDER; SALAMANDER HEATER AND BLOWER TENDER; LIGHT TRUCK; PICKUP DRIVER; FLAGGERS AND PILOT CAR DRIVERS

$31.40$3.90$35.30+$1.00 (+2.9%)SAND
LABORER: GROUP 2…
Full text

LABORER: GROUP 2: SEMI SKILLED LABORER; BULK CEMENT HANDLER; CONDUIT LAYER, TELEPHONE OR ELECTRICAL; FORM SETTER (PAVEMENT); GAS ELECTRIC OR PNEUMATIC TOOL OPERATOR; CHIPPING HAMMER, GRINDERS AND PAVING BRAKERS (TAMPER-DRIT) CONCRETE VIBRATOR OPERATOR; CHAIN SAW OPERATOR; CONCRETE SAW OPERATOR; CONCRETE CURING MAN (NOT WATER); BITUMINOUS WORKER (SHOVELER, DUMPER, RAKER AND FLOATED); KETTLEMAN (BITUMINOUS OR LEAD); CONCRETE BUCKET SIGNALMAN; POWER BUGGY OPERATOR; BRICK AND MASON TENDER; MULTIPLATE PIPELAYER; CULVERT PIPE LAYERS; CARPENTERS TENDERS

$31.65$3.90$35.55—SAND
LABORER: GROUP 3…
Full text

LABORER: GROUP 3: CAISSON WORKER; BOTTOM MAN (SANITARY SEWER, STORM SEWER WATER AND GAS LINERS); CONCRETE MIXER OPERATOR (ONE BAG CAPACITY); MORTAR MIXER

$31.80$3.90$35.70+$1.00 (+2.9%)SAND
LABORER: GROUP 4…
Full text

LABORER: GROUP 4: PIPE LAYERS (SANITARY SEWER, STORM SEWER, WATER AND GAS LINES); DRILL RUNNER (INCLUDES WAGON CHURN OR AIR TRACK) POWDERMAN, GUNITE AND SANDBLAST, NOZZLEMAN, REINFORCING STEEL SETTERS/TIERS, CONCRETE FINISHERS TENDER

$32.55$3.90$36.45+$1.00 (+2.8%)SAND
TEAM0638-004 · Teamsters agreement, October 1, 2026
TRUCK DRIVER: EUCLID OVER 20 YDS$37.09$19.98$57.07+$2.00 (+3.6%)Agreement, 2026
TRUCK DRIVER: SINGLE AXLE TRUCKS$35.14$19.98$55.12+$2.00 (+3.8%)Agreement, 2026
TRUCK DRIVER: TANDEM TRI AXLE SEMI…
Full text

TRUCK DRIVER: TANDEM TRI AXLE SEMI, LOWBOY, AND OFF ROAD HEAVY DUTY END DUMPS 20 YDS & UNDER

$35.57$19.98$55.55—Agreement, 2026
TRUCK DRIVER: TANDEM TRI/AXLE TRUCK$35.26$19.98$55.24—Agreement, 2026

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026
Modification 3July 30, 2026
Modification 4August 6, 2026
Modification 5October 1, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on ND20260001?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 5 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and ND20260001 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 27 classifications in 7 rate groups
  • 6 from agreements, 0 from surveys
  • Counties: Adams, Barnes, Benson, Billings, Bottineau, Bowman, Burke, Burleigh, Cass, Cavalier, Dickey, Divide, Dunn, Eddy, Emmons, Foster, Golden Valley, Grand Forks, Grant, Griggs, Hettinger, Kidder, La Moure, Logan, McHenry, McIntosh, McKenzie, McLean, Mercer, Morton, Mountrail, Nelson, Oliver, Pembina, Pierce, Ramsey, Ransom, Renville, Richland, Rolette, Sargent, Sheridan, Sioux, Slope, Stark, Steele, Stutsman, Towner, Traill, Walsh, Ward, Wells, Williams