This sheet sets 47 classifications for highway work in Alexander, Buncombe, Burke and 5 more counties, North Carolina. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.00 an hour (power equipment operator (asphalt broom tractor)) to $21.41 (electrician (electrician)). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification.

Latest change

May 18, 2026 · modification 1

7 fringe formulas changed

  • Power equipment operator: 5 fringe formulas changed
  • Laborer: 2 fringe formulas changed
Every line that changed (7)
ClassificationWasNowChange
POWER EQUIPMENT OPERATOR (TACK TRUCK/DISTRIBUTOR OPERATOR)$14.81 + .02$14.81 + $0.02changed
POWER EQUIPMENT OPERATOR (ROLLER OTHER)$12.51 + .03$12.51 + $0.03changed
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT FINISH)$16.08 + .07$16.08 + $0.07changed
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT BREAKDOWN)$15.00 + .08$15.00 + $0.08changed
POWER EQUIPMENT OPERATOR (PAVER ASPHALT)$17.84 + .08$17.84 + $0.08changed
LABORER (TRAFFIC SIGNAL/LIGHTING INSTALLER)$15.33 + .22$15.33 + $0.22changed
LABORER (ASPHALT SCREED/JACKMAN)$15.38 + .08$15.38 + $0.08changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
SUNC2014-002 · Survey of contractors in NC, November 13, 2014
TRUCK DRIVER (GVWR OF 26,000 OR LESS)$12.48$0.00$12.48no changeSurvey, 2014
TRUCK DRIVER (GVWR OF 26,000 LBS OR GREATER)$13.65$0.00$13.65no changeSurvey, 2014
POWER EQUIPMENT OPERATOR: MILLING MACHINE$15.08$0.00$15.08no changeSurvey, 2014
POWER EQUIPMENT OPERATOR: MECHANIC$17.86$0.00$17.86no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (TACK TRUCK/DISTRIBUTOR OPERATOR)$14.81$0.02$14.83changedSurvey, 2014
POWER EQUIPMENT OPERATOR (SLIP FORM MACHINE)$20.38$0.00$20.38no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (SCRAPER ROUGH)$13.83$0.00$13.83no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (SCRAPER FINISH)$12.86$0.00$12.86no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (ROLLER OTHER)$12.51$0.03$12.54changedSurvey, 2014
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT FINISH)$16.08$0.07$16.15changedSurvey, 2014
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT BREAKDOWN)$15.00$0.08$15.08changedSurvey, 2014
POWER EQUIPMENT OPERATOR (PAVER CONCRETE)$18.20$0.00$18.20no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (PAVER ASPHALT)$17.84$0.08$17.92changedSurvey, 2014
POWER EQUIPMENT OPERATOR (PAVEMENT MARKING EQUIPMENT)$11.99$0.00$11.99no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (OILER/GREASER)$15.05$0.00$15.05no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (OFF-ROAD HAULER/WATER TANKER)$11.95$0.00$11.95no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE (SHUTTLE BUGGY))$15.44$0.00$15.44no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (LOADER GREATER THAN 2 CUBIC YARDS)$17.91$0.00$17.91no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (LOADER 2 CUBIC YARDS OR LESS)$12.38$0.00$12.38no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (GRADER/BLADE ROUGH)$15.12$0.00$15.12no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (GRADER/BLADE FINE)$19.86$0.00$19.86no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (EXCAVATOR ROUGH)$14.67$0.00$14.67no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (EXCAVATOR FINE)$16.02$0.00$16.02no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (DRILL OPERATOR STRUCTURE)$21.07$0.00$21.07no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (DRILL OPERATOR ROCK)$15.00$0.00$15.00no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (CRANE ROUGH/ALL-TERRAIN)$19.19$0.00$19.19no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (CRANE OTHER)$18.69$0.00$18.69no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (CRANE BOOM TRUCKS)$18.19$0.00$18.19no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (CONCRETE GRINDER/GROOVER)$19.20$0.00$19.20no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (BULLDOZER ROUGH)$14.51$0.00$14.51no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (BULLDOZER FINE)$16.28$0.00$16.28no changeSurvey, 2014
POWER EQUIPMENT OPERATOR (ASPHALT BROOM TRACTOR)$10.00$0.00$10.00no changeSurvey, 2014
PAINTER (BRIDGE)$20.67$0.00$20.67no changeSurvey, 2014
LABORER: PIPELAYER$12.87$0.00$12.87no changeSurvey, 2014
LABORER: COMMON OR GENERAL$11.90$0.00$11.90no changeSurvey, 2014
LABORER (TRAFFIC SIGNAL/LIGHTING INSTALLER)$15.33$0.22$15.55changedSurvey, 2014
LABORER (GUARDRAIL/FENCE INSTALLER)$13.09$0.00$13.09no changeSurvey, 2014
LABORER (CEMENT MASON/CONCRETE FINISHER TENDER)$11.04$0.00$11.04no changeSurvey, 2014
LABORER (CARPENTER TENDER)$10.50$0.00$10.50no changeSurvey, 2014
LABORER (ASPHALT SCREED/JACKMAN)$15.38$0.08$15.46changedSurvey, 2014
LABORER (ASPHALT RAKER AND SPREADER)$11.76$0.00$11.76no changeSurvey, 2014
IRONWORKER$12.48$0.00$12.48no changeSurvey, 2014
ELECTRICIAN (TELECOMMUNICATIONS TECHNICIAN)$14.67$1.67$16.34no changeSurvey, 2014
ELECTRICIAN (ELECTRICIAN)$18.79$2.62$21.41no changeSurvey, 2014
CEMENT MASON/CONCRETE FINISHER$14.40$0.00$14.40no changeSurvey, 2014
CARPENTER$13.48$0.00$13.48no changeSurvey, 2014
BLASTER$20.93$0.00$20.93no changeSurvey, 2014

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NC20260087?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and NC20260087 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 47 classifications in 1 rate groups
  • 0 from agreements, 1 from surveys
  • Counties: Alexander, Buncombe, Burke, Caldwell, Catawba, Haywood, Henderson, Madison