CertifiedHours

Prevailing wage rates · Mississippi · Wage determination

Prevailing wage rates: Simpson County, Mississippi

Highway construction · MS20260141 modification 1, published May 18, 2026

The short answer

This sheet sets 39 classifications for highway work in Simpson County, Mississippi. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.00 an hour (truck driver: water truck) to $41.74 (traffic signalization (electrician)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ELEC0480-010 · Electrical Workers (IBEW) agreement, January 1, 2025
TRAFFIC SIGNALIZATION (ELECTRICIAN)$30.35$11.39$41.74Agreement
SUMS2010-064 · Survey of contractors in MS, August 4, 2014
TRUCK DRIVER: SEMI/TRAILER TRUCK$14.60$0.00$14.60Survey
TRUCK DRIVER: DUMP TRUCK (ALL TYPES)$11.77$0.00$11.77Survey
TRUCK DRIVER: WATER TRUCK$10.00$0.00$10.00Survey
TRUCK DRIVER: MECHANIC$13.00$0.00$13.00Survey
TRUCK DRIVER: LOWBOY TRUCK$12.08$0.00$12.08Survey
TRUCK DRIVER: FLATBED TRUCK$14.06$0.00$14.06Survey
OPERATOR: TRACTOR$11.22$0.00$11.22Survey
OPERATOR: SCRAPER$12.25$0.00$12.25Survey
OPERATOR: ROLLER (ALL TYPES)$11.54$0.00$11.54Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$11.74$0.00$11.74Survey
OPERATOR: OILER$12.35$0.00$12.35Survey
OPERATOR: MIXER$14.25$0.00$14.25Survey
OPERATOR: MILLING MACHINE$14.68$0.00$14.68Survey
OPERATOR: MECHANIC$16.81$0.00$16.81Survey
OPERATOR: LOADER$13.28$0.00$13.28Survey
OPERATOR: GRINDING/GROOVING MACHINE$15.90$0.00$15.90Survey
OPERATOR: GRADER/BLADE$14.41$0.00$14.41Survey
OPERATOR: DISTRIBUTOR$10.95$0.00$10.95Survey
OPERATOR: CRANE$19.22$0.00$19.22Survey
OPERATOR: CONCRETE SAW$15.50$0.00$15.50Survey
OPERATOR: BULLDOZER$14.25$0.00$14.25Survey
OPERATOR: BROOM/SWEEPER$11.10$0.00$11.10Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$11.64$0.00$11.64Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$14.97$0.00$14.97Survey
OPERATOR: ASPHALT SPREADER$14.71$0.00$14.71Survey
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$10.23$0.00$10.23Survey
LABORER: PIPELAYER$13.44$0.00$13.44Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$11.27$0.00$11.27Survey
LABORER: LUTEMAN$12.88$0.00$12.88Survey
LABORER: FLAGGER$10.22$0.00$10.22Survey
LABORER: COMMON OR GENERAL…
Full text

LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING; AND GRADE CHECKING

$11.50$0.00$11.50Survey
IRONWORKER, REINFORCING$15.47$0.00$15.47Survey
INSTALLER - SIGN$11.99$0.00$11.99Survey
INSTALLER - GUARDRAIL$12.07$0.00$12.07Survey
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)$12.05$0.00$12.05Survey
ELECTRICIAN$24.04$5.87$29.91Survey
CEMENT MASON/CONCRETE FINISHER$13.99$0.00$13.99Survey
CARPENTER (FORM WORK ONLY)$13.28$0.00$13.28Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MS20260141?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Simpson County, Mississippi (Highway) · MS20260141 Mod 1 · CertifiedHours