Prevailing wage rates: Perry County, Mississippi

Highway construction · MS20260139 modification 1, published May 18, 2026

The short answer

This sheet sets 38 classifications for highway work in Perry County, Mississippi. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.71 an hour (operator: tractor) to $32.91 (electrician). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUMS2010-062 · Survey of contractors in MS, August 4, 2014
TRUCK DRIVER: SEMI/TRAILER TRUCK$14.36$0.00$14.36Survey
TRUCK DRIVER: DUMP TRUCK (ALL TYPES)$13.35$0.00$13.35Survey
TRUCK DRIVER: WATER TRUCK$17.08$0.00$17.08Survey
TRUCK DRIVER: MECHANIC$12.31$0.00$12.31Survey
TRUCK DRIVER: LOWBOY TRUCK$14.07$0.00$14.07Survey
TRUCK DRIVER: FLATBED TRUCK$14.72$0.00$14.72Survey
SURVEYOR (STAKING, MARKING AND BRUSH CLEARING)$11.56$0.00$11.56Survey
OPERATOR: TRACTOR$10.71$0.00$10.71Survey
OPERATOR: SCRAPER$14.00$0.00$14.00Survey
OPERATOR: ROLLER (ALL TYPES)$10.78$0.00$10.78Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$14.20$0.00$14.20Survey
OPERATOR: OILER$12.22$0.00$12.22Survey
OPERATOR: MILLING MACHINE$15.24$0.00$15.24Survey
OPERATOR: MECHANIC$13.00$0.00$13.00Survey
OPERATOR: LOADER$13.99$0.00$13.99Survey
OPERATOR: GRADER/BLADE$15.12$0.00$15.12Survey
OPERATOR: DISTRIBUTOR$11.46$0.00$11.46Survey
OPERATOR: CRANE$14.80$0.00$14.80Survey
OPERATOR: CONCRETE SAW$14.73$0.00$14.73Survey
OPERATOR: BULLDOZER$13.27$0.00$13.27Survey
OPERATOR: BROOM/SWEEPER$10.73$0.00$10.73Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$11.86$0.00$11.86Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$12.57$0.00$12.57Survey
OPERATOR: ASPHALT SPREADER$14.71$0.00$14.71Survey
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$12.08$0.00$12.08Survey
LABORER: PIPELAYER$14.50$0.00$14.50Survey
LABORER: LUTEMAN$12.88$0.00$12.88Survey
LABORER: GUARDRAIL INSTALLATION$12.39$0.00$12.39Survey
LABORER: GRADE CHECKER$14.82$0.00$14.82Survey
LABORER: FLAGGER$11.42$0.00$11.42Survey
LABORER: COMMON OR GENERAL…
Full text

LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING AND SPREADING; AND MASON TENDING CEMENT/CONCRETE

$10.88$0.00$10.88Survey
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$11.10$0.00$11.10Survey
IRONWORKER, REINFORCING$16.44$0.00$16.44Survey
INSTALLER - SIGN$12.19$0.00$12.19Survey
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)$13.52$0.00$13.52Survey
ELECTRICIAN$26.12$6.79$32.91Survey
CEMENT MASON/CONCRETE FINISHER$11.54$1.63$13.17Survey
CARPENTER (FORM WORK ONLY)$12.08$0.00$12.08Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MS20260139?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator