CertifiedHours

Prevailing wage rates · Mississippi · Wage determination

Prevailing wage rates: Copiah County, Mississippi

Highway construction · MS20260129 modification 1, published May 18, 2026

The short answer

This sheet sets 40 classifications for highway work in Copiah County, Mississippi. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $8.25 an hour (laborer: laborer-cones/ barricades/barrels - setter/mover/sweeper) to $41.74 (traffic signalization (electrician)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ELEC0480-010 · Electrical Workers (IBEW) agreement, January 1, 2025
TRAFFIC SIGNALIZATION (ELECTRICIAN)$30.35$11.39$41.74Agreement
SUMS2010-052 · Survey of contractors in MS, August 4, 2014
TRUCK DRIVER: SEMI/TRAILER TRUCK$14.60$0.00$14.60Survey
TRUCK DRIVER: DUMP TRUCK (ALL TYPES)$12.66$0.00$12.66Survey
TRUCK DRIVER: WATER TRUCK$19.00$0.00$19.00Survey
TRUCK DRIVER: MECHANIC$13.00$0.00$13.00Survey
TRUCK DRIVER: LOWBOY TRUCK$11.96$0.00$11.96Survey
TRUCK DRIVER: FLATBED TRUCK$14.06$0.00$14.06Survey
OPERATOR: TRACTOR$11.22$0.00$11.22Survey
OPERATOR: SCRAPER$12.25$0.00$12.25Survey
OPERATOR: ROLLER (ALL TYPES)$11.29$0.00$11.29Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$11.40$0.00$11.40Survey
OPERATOR: OILER$12.35$0.00$12.35Survey
OPERATOR: MIXER$14.25$0.00$14.25Survey
OPERATOR: MILLING MACHINE$14.68$0.00$14.68Survey
OPERATOR: MECHANIC$19.16$0.00$19.16Survey
OPERATOR: LOADER$16.75$0.00$16.75Survey
OPERATOR: GRINDING/GROOVING MACHINE$16.86$0.00$16.86Survey
OPERATOR: GRADER/BLADE$11.67$0.00$11.67Survey
OPERATOR: DISTRIBUTOR$11.17$0.00$11.17Survey
OPERATOR: CRANE$19.22$0.00$19.22Survey
OPERATOR: CONCRETE SAW$16.50$0.00$16.50Survey
OPERATOR: BULLDOZER$15.25$0.00$15.25Survey
OPERATOR: BROOM/SWEEPER$10.14$0.00$10.14Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$11.64$0.00$11.64Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$14.69$0.00$14.69Survey
OPERATOR: ASPHALT SPREADER$14.71$0.00$14.71Survey
LABORER: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$8.25$0.00$8.25Survey
LABORER: PIPELAYER$13.44$0.00$13.44Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$11.27$0.00$11.27Survey
LABORER: LUTEMAN$12.88$0.00$12.88Survey
LABORER: GRADE CHECKER$9.94$0.00$9.94Survey
LABORER: FLAGGER$10.40$0.00$10.40Survey
LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING$10.06$0.00$10.06Survey
IRONWORKER, REINFORCING$15.47$0.00$15.47Survey
INSTALLER - SIGN$12.38$0.00$12.38Survey
INSTALLER - GUARDRAIL$12.07$0.00$12.07Survey
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK)$12.05$0.00$12.05Survey
ELECTRICIAN$24.04$5.87$29.91Survey
CEMENT MASON/CONCRETE FINISHER$15.01$0.00$15.01Survey
CARPENTER (FORM WORK ONLY)$13.28$0.00$13.28Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MS20260129?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator