Prevailing wage rates: Dade, Douglas, Henry and 6 more counties, Missouri

Building construction · MO20260032 modification 2, published May 18, 2026

The short answer

This sheet sets 48 classifications for building work in Dade, Douglas, Henry and 6 more counties, Missouri. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.71 an hour (glazier) to $99.13 (elevator mechanic. a. vacation). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0027-008 · Asbestos Workers and Heat & Frost Insulators agreement, October 6, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR (HENRY COUNTY)$45.60$35.47$81.07Agreement
ASBE0063-003 · Asbestos Workers and Heat & Frost Insulators agreement, November 1, 2024
ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING COUNTIES)$31.97$14.00$45.97Agreement
BRMO0003-008 · Bricklayers agreement, June 1, 2023
TILE SETTER (HENRY COUNTY)$40.53$15.99$56.52Agreement
BRMO0015-012 · Bricklayers agreement, April 1, 2023
BRICKLAYER (REMAINING COUNTIES)$33.67$19.48$53.15Agreement
BRMO0015-013 · Bricklayers agreement, April 1, 2016
BRICKLAYER (HENRY COUNTY)$34.35$18.06$52.41Agreement
BRMO0015-022 · Bricklayers agreement, June 1, 2023
TILE SETTER (REMAINING COUNTIES)$26.47$14.89$41.36Agreement
CARP0005-003 · Carpenters agreement, May 1, 2024
CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (HENRY COUNTY)$42.06$22.40$64.46Agreement
CARP0005-013 · Carpenters agreement, May 1, 2024
CARPENTER, INCLUDES DRYWALL HANGING…
Full text

CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (HICKORY, LACLEDE & ST CLAIR COUNTIES)

$39.48$22.40$61.88Agreement
CARP0017-001 · Carpenters agreement, May 1, 2023
CARPENTER, INCLUDES DRYWALL HANGING…
Full text

CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (DADE, DOUGLAS, OZARK, STONE & TANEY COUNTIES)

$29.39$21.25$50.64Agreement
ELEC0095-003 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS…
Full text

ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (DADE & ST. CLAIR COUNTIES)

$32.25$20.81$53.06Agreement
ELEC0124-024 · Electrical Workers (IBEW) agreement, August 26, 2024
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (HENRY COUNTY)$51.01$26.25$77.26Agreement
ELEC0453-002 · Electrical Workers (IBEW) agreement, September 1, 2024
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS…
Full text

ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: STONE AND TANEY COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES)

$28.65$18.34$46.99Agreement
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS…
Full text

ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES)

$32.40$19.11$51.51Agreement
ELEV0012-003 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC. A. VACATION…
Full text

ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY

$60.69$38.44$99.13Agreement
ENGI0101-010 · Operating Engineers agreement, April 1, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: ROLLER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)

$30.91$18.07$48.98Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: LOADER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)

$31.62$18.07$49.69Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: GRADER/BLADE (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)

$31.62$18.07$49.69Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: BULLDOZER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES)

$31.62$18.07$49.69Agreement
ENGI0101-019 · Operating Engineers agreement, April 1, 2025
POWER EQUIPMENT OPERATOR:: ROLLER (HENRY COUNTY)$45.48$22.42$67.90Agreement
POWER EQUIPMENT OPERATOR:: LOADER (HENRY COUNTY)$45.84$22.42$68.26Agreement
POWER EQUIPMENT OPERATOR:: GRADER/BLADE (HENRY COUNTY)$45.48$22.42$67.90Agreement
IRON0010-010 · Ironworkers agreement, April 1, 2025
IRONWORKER, REINFORCING AND STRUCTURAL (HENRY COUNTY)$39.00$34.25$73.25Agreement
IRON0010-021 · Ironworkers agreement, April 1, 2025
IRONWORKER, REINFORCING AND STRUCTURAL (STONE COUNTY)$36.00$34.25$70.25Agreement
IRON0010-028 · Ironworkers agreement, April 1, 2025
IRONWORKER, REINFORCING AND STRUCTURAL (DADE, HICKORY, OZARK, ST. CLAIR, & TANEY COUNTIES)$36.00$34.25$70.25Agreement
IRON0396-015 · Ironworkers agreement, August 5, 2020
IRONWORKER, REINFORCING AND STRUCTURAL (DOUGLAS & LACLEDE COUNTIES)$31.39$29.20$60.59Agreement
LABO0663-003 · Laborers agreement, April 1, 2025
LABORER: COMMON OR GENERAL & LANDSCAPE (HENRY & HICKORY COUNTIES)$26.50$13.18$39.68Agreement
LABORER: BRICK MASON TENDER (HENRY & HICKORY COUNTIES)$28.00$13.18$41.18Agreement
LABO0663-006 · Laborers agreement, April 1, 2025
LABORER: COMMON OR GENERAL & LANDSCAPE…
Full text

LABORER: COMMON OR GENERAL & LANDSCAPE (DADE, DOUGLAS, LACLEDE, OZARK, ST CLAIR, STONE AND TANEY COUNTIES)

$27.05$13.62$40.67Agreement
Group definitions, zones and premiums for LABO0663-006
LABORER: BRICK MASON TENDER (DADE, DOUGLAS, LACLEDE, OZARK, ST CLAIR, STONE AND TANEY COUNTIES).$ 29.23 13.62
PAIN0003-016 · Painters and Allied Trades agreement, April 1, 2019
PAINTER: DRYWALL FINISHING/TAPING ONLY (HENRY COUNTY)$25.39$17.76$43.15Agreement
PAINTER: BRUSH & ROLLER ONLY (HENRY COUNTY)$24.43$17.76$42.19Agreement
PAIN1185-011 · Painters and Allied Trades agreement, April 1, 2025
PAINTER: DRYWALL FINISHING/TAPING ONLY (LACLEDE COUNTY)$34.90$17.21$52.11Agreement
PAINTER: BRUSH & ROLLER ONLY (LACLEDE COUNTY)$33.90$17.21$51.11Agreement
PAINTER (LACLEDE COUNTY)$33.90$17.21$51.11Agreement
PAIN2015-006 · Painters and Allied Trades agreement, April 1, 2012
PAINTER (BRUSH & ROLLER ONLY)$19.75$11.76$31.51Agreement
PLUM0008-012 · Plumbers and Pipefitters agreement, June 1, 2025
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (HENRY & ST. CLAIR COUNTIES)$58.38$25.29$83.67Agreement
PLUM0178-012 · Plumbers and Pipefitters agreement, November 1, 2024
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…
Full text

PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES)

$39.35$15.72$55.07Agreement
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…
Full text

PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES)

$39.35$15.72$55.07Agreement
PLUM0533-009 · Plumbers and Pipefitters agreement, June 1, 2025
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (HENRY & ST. CLAIR COUNTIES)$57.51$28.35$85.86Agreement
ROOF0020-003 · Roofers agreement, February 1, 2025
ROOFER$30.73$14.51$45.24Agreement
SHEE0002-021 · Sheet Metal Workers agreement, July 1, 2023
SHEET METAL WORKER…
Full text

SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (HENRY, HICKORY, & ST CLAIR COUNTIES)

$47.20$26.28$73.48Agreement
SHEE0036-005 · Sheet Metal Workers agreement, July 1, 2025
SHEET METAL WORKER…
Full text

SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (DADE, DOUGLAS, LACLEDE, OZARK, STONE & TANEY COUNTIES)

$34.43$17.86$52.29Agreement
SUMO2010-031 · Survey of contractors in MO, March 8, 2010
TRUCK DRIVER: DUMP TRUCK$28.92$0.00$28.92Survey
PAINTER: SPRAY$18.79$8.12$26.91Survey
OPERATOR: WATER TRUCK$28.37$0.00$28.37Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$24.47$0.00$24.47Survey
OPERATOR: BACKHOE/TRACKHOE$23.55$7.47$31.02Survey
GLAZIER$22.71$0.00$22.71Survey
CEMENT MASON/CONCRETE FINISHER$17.95$6.64$24.59Survey

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MO20260032?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator