Prevailing wage rates · Missouri · Wage determination
Prevailing wage rates: Dade, Douglas, Henry and 6 more counties, Missouri
Building construction · MO20260032 modification 2, published May 18, 2026
The short answer
This sheet sets 49 classifications for building work in Dade, Douglas, Henry and 6 more counties, Missouri. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.71 an hour (glazier) to $85.86 (pipefitter, includes hvac pipe installation (henry & st. clair counties)). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications. Of the 47 rates we can follow line by line from the first publication to today, 1 is higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
May 18, 2026 · modification 2
Classification names reworded; 1 fringe formula changed among the 47 lines we could match
- Elevator mechanic. a. vacation: 1 fringe formula changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (1)
| Classification | Was | Now | Change |
|---|---|---|---|
| ELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION… | $60.69 + 38.435+a+b | $60.69 + $38.44 | changed |
Earlier modifications
January 30, 2026 · modification 11 rate raised
- Asbestos worker/heat & frost insulator: 1 rate raised by $3.95 an hour
Every line that changed (1)
Classification Was Now Change ASBESTOS WORKER/HEAT & FROST INSULATOR $43.60 + $33.52 $45.60 + $35.47 +$3.95 (+5.1%)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| ASBE0027-008 · Asbestos Workers and Heat & Frost Insulators agreement, October 6, 2025 | |||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR (HENRY COUNTY) | $45.60 | $35.47 | $81.07 | +$3.95 (+5.1%) | Agreement, 2025 |
| ASBE0063-003 · Asbestos Workers and Heat & Frost Insulators agreement, November 1, 2024 | |||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING COUNTIES) | $31.97 | $14.00 | $45.97 | no change | Agreement, 2024 |
| BRMO0003-008 · Bricklayers agreement, June 1, 2023 | |||||
| TILE SETTER (HENRY COUNTY) | $40.53 | $15.99 | $56.52 | no change | Agreement, 2023 |
| BRMO0015-012 · Bricklayers agreement, April 1, 2023 | |||||
| BRICKLAYER (REMAINING COUNTIES) | $33.67 | $19.48 | $53.15 | no change | Agreement, 2023 |
| BRMO0015-013 · Bricklayers agreement, April 1, 2016 | |||||
| BRICKLAYER (HENRY COUNTY) | $34.35 | $18.06 | $52.41 | no change | Agreement, 2016 |
| BRMO0015-022 · Bricklayers agreement, June 1, 2023 | |||||
| TILE SETTER (REMAINING COUNTIES) | $26.47 | $14.89 | $41.36 | no change | Agreement, 2023 |
| CARP0005-003 · Carpenters agreement, May 1, 2024 | |||||
| CARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (HENRY COUNTY) | $42.06 | $22.40 | $64.46 | no change | Agreement, 2024 |
| CARP0005-013 · Carpenters agreement, May 1, 2024 | |||||
CARPENTER, INCLUDES DRYWALL HANGING…Full textCARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (HICKORY, LACLEDE & ST CLAIR COUNTIES) | $39.48 | $22.40 | $61.88 | no change | Agreement, 2024 |
| CARP0017-001 · Carpenters agreement, May 1, 2023 | |||||
CARPENTER, INCLUDES DRYWALL HANGING…Full textCARPENTER, INCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION (DADE, DOUGLAS, OZARK, STONE & TANEY COUNTIES) | $29.39 | $21.25 | $50.64 | no change | Agreement, 2023 |
| ELEC0095-003 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS…Full textELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (DADE & ST. CLAIR COUNTIES) | $32.25 | $20.81 | $53.06 | no change | Agreement, 2025 |
| ELEC0124-024 · Electrical Workers (IBEW) agreement, August 26, 2024 | |||||
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (HENRY COUNTY) | $51.01 | $26.25 | $77.26 | no change | Agreement, 2024 |
| ELEC0453-002 · Electrical Workers (IBEW) agreement, September 1, 2024 | |||||
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS…Full textELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: STONE AND TANEY COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $28.65 | $18.34 | $46.99 | no change | Agreement, 2024 |
ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS…Full textELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $32.40 | $19.11 | $51.51 | no change | Agreement, 2024 |
| ELEV0012-003 · Elevator Constructors agreement, January 1, 2025 | |||||
ELEVATOR MECHANIC. A. VACATION…Full textELEVATOR MECHANIC. A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS AND 6% FOR 6 MONTHS TO 5 YEARS AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | $60.69 | $38.44 | $99.13 | changed | Agreement, 2025 |
| ENGI0101-010 · Operating Engineers agreement, April 1, 2025 | |||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: ROLLER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $30.91 | $18.07 | $48.98 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: LOADER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | $18.07 | $49.69 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: GRADER/BLADE (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | $18.07 | $49.69 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BULLDOZER (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, ST CLAIR, STONE & TANEY COUNTIES) | $31.62 | $18.07 | $49.69 | no change | Agreement, 2025 |
| ENGI0101-019 · Operating Engineers agreement, April 1, 2025 | |||||
| POWER EQUIPMENT OPERATOR:: ROLLER (HENRY COUNTY) | $45.48 | $22.42 | $67.90 | no change | Agreement, 2025 |
| POWER EQUIPMENT OPERATOR:: LOADER (HENRY COUNTY) | $45.84 | $22.42 | $68.26 | no change | Agreement, 2025 |
| POWER EQUIPMENT OPERATOR:: GRADER/BLADE (HENRY COUNTY) | $45.48 | $22.42 | $67.90 | no change | Agreement, 2025 |
| IRON0010-010 · Ironworkers agreement, April 1, 2025 | |||||
| IRONWORKER, REINFORCING AND STRUCTURAL (HENRY COUNTY) | $39.00 | $34.25 | $73.25 | no change | Agreement, 2025 |
| IRON0010-021 · Ironworkers agreement, April 1, 2025 | |||||
| IRONWORKER, REINFORCING AND STRUCTURAL (STONE COUNTY) | $36.00 | $34.25 | $70.25 | no change | Agreement, 2025 |
| IRON0010-028 · Ironworkers agreement, April 1, 2025 | |||||
| IRONWORKER, REINFORCING AND STRUCTURAL (DADE, HICKORY, OZARK, ST. CLAIR, & TANEY COUNTIES) | $36.00 | $34.25 | $70.25 | no change | Agreement, 2025 |
| IRON0396-015 · Ironworkers agreement, August 5, 2020 | |||||
| IRONWORKER, REINFORCING AND STRUCTURAL (DOUGLAS & LACLEDE COUNTIES) | $31.39 | $29.20 | $60.59 | no change | Agreement, 2020 |
| LABO0663-003 · Laborers agreement, April 1, 2025 | |||||
| LABORER: COMMON OR GENERAL & LANDSCAPE (HENRY & HICKORY COUNTIES) | $26.50 | $13.18 | $39.68 | no change | Agreement, 2025 |
| LABORER: BRICK MASON TENDER (HENRY & HICKORY COUNTIES) | $28.00 | $13.18 | $41.18 | no change | Agreement, 2025 |
| LABO0663-006 · Laborers agreement, April 1, 2025 | |||||
LABORER: COMMON OR GENERAL & LANDSCAPE…Full textLABORER: COMMON OR GENERAL & LANDSCAPE (DADE, DOUGLAS, LACLEDE, OZARK, ST CLAIR, STONE AND TANEY COUNTIES) | $27.05 | $13.62 | $40.67 | no change | Agreement, 2025 |
LABORER: BRICK MASON TENDER…Full textLABORER: BRICK MASON TENDER (DADE, DOUGLAS, LACLEDE, OZARK, ST CLAIR, STONE AND TANEY COUNTIES) | $29.23 | $13.62 | $42.85 | no change | Agreement, 2025 |
| PAIN0003-016 · Painters and Allied Trades agreement, April 1, 2019 | |||||
| PAINTER: DRYWALL FINISHING/TAPING ONLY (HENRY COUNTY) | $25.39 | $17.76 | $43.15 | no change | Agreement, 2019 |
| PAINTER: BRUSH & ROLLER ONLY (HENRY COUNTY) | $24.43 | $17.76 | $42.19 | no change | Agreement, 2019 |
| PAIN1185-011 · Painters and Allied Trades agreement, April 1, 2025 | |||||
| PAINTER: DRYWALL FINISHING/TAPING ONLY (LACLEDE COUNTY) | $34.90 | $17.21 | $52.11 | no change | Agreement, 2025 |
| PAINTER: BRUSH & ROLLER ONLY (LACLEDE COUNTY) | $33.90 | $17.21 | $51.11 | — | Agreement, 2025 |
| PAINTER (LACLEDE COUNTY) | $33.90 | $17.21 | $51.11 | — | Agreement, 2025 |
| PAIN2015-006 · Painters and Allied Trades agreement, April 1, 2012 | |||||
| PAINTER (BRUSH & ROLLER ONLY) | $19.75 | $11.76 | $31.51 | no change | Agreement, 2012 |
| PLUM0008-012 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (HENRY & ST. CLAIR COUNTIES) | $58.38 | $25.29 | $83.67 | no change | Agreement, 2025 |
| PLUM0178-012 · Plumbers and Pipefitters agreement, November 1, 2024 | |||||
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…Full textPLUMBER, EXCLUDES HVAC PIPE INSTALLATION (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $39.35 | $15.72 | $55.07 | no change | Agreement, 2024 |
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…Full textPIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (DADE, DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES) | $39.35 | $15.72 | $55.07 | no change | Agreement, 2024 |
| PLUM0533-009 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (HENRY & ST. CLAIR COUNTIES) | $57.51 | $28.35 | $85.86 | no change | Agreement, 2025 |
| ROOF0020-003 · Roofers agreement, February 1, 2025 | |||||
| ROOFER | $30.73 | $14.51 | $45.24 | no change | Agreement, 2025 |
| SHEE0002-021 · Sheet Metal Workers agreement, July 1, 2023 | |||||
SHEET METAL WORKER…Full textSHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (HENRY, HICKORY, & ST CLAIR COUNTIES) | $47.20 | $26.28 | $73.48 | no change | Agreement, 2023 |
| SHEE0036-005 · Sheet Metal Workers agreement, July 1, 2025 | |||||
SHEET METAL WORKER…Full textSHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (DADE, DOUGLAS, LACLEDE, OZARK, STONE & TANEY COUNTIES) | $34.43 | $17.86 | $52.29 | no change | Agreement, 2025 |
| SUMO2010-031 · Survey of contractors in MO, March 8, 2010 | |||||
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | no change | Survey, 2010 |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | no change | Survey, 2010 |
| OPERATOR: WATER TRUCK | $28.37 | $0.00 | $28.37 | no change | Survey, 2010 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $24.47 | $0.00 | $24.47 | no change | Survey, 2010 |
| OPERATOR: BACKHOE/TRACKHOE | $23.55 | $7.47 | $31.02 | no change | Survey, 2010 |
| GLAZIER | $22.71 | $0.00 | $22.71 | no change | Survey, 2010 |
| CEMENT MASON/CONCRETE FINISHER | $17.95 | $6.64 | $24.59 | no change | Survey, 2010 |
Modification history
| Modification 1 | January 30, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MO20260032?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and MO20260032 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 49 classifications in 31 rate groups
- 30 from agreements, 1 from surveys
- Counties: Dade, Douglas, Henry, Hickory, Laclede, Ozark, St Clair, Stone, Taney