Prevailing wage rates: Scott County, Missouri

Building construction · MO20260022 modification 1, published May 18, 2026

The short answer

This sheet sets 28 classifications for building work in Scott County, Missouri. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.45 an hour (painter: roller) to $101.17 (elevator mechanic.). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0001-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 7, 2024
ASBESTOS WORKER/HEAT & FROST INSULATOR$43.48$27.24$70.72Agreement
BRMO0023-003 · Bricklayers agreement, June 7, 2023
TILE SETTER$31.51$15.00$46.51Agreement
CARP0014-001 · Carpenters agreement, May 1, 2024
CARPENTER (INCLUDING FORMWORK)$32.59$21.85$54.44Agreement
CARP1310-005 · Carpenters agreement, May 1, 2024
CARPENTER (FLOOR LAYER) (VINYL INSTALLATION ONLY)$40.08$21.85$61.93Agreement
ELEC0001-003 · Electrical Workers (IBEW) agreement, June 22, 2025
ELECTRICIAN$49.29$33.64$82.93Agreement
ELEV0003-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC.

FOOTNOTES: A) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTM

$62.73$38.44$101.17Agreement
ENGI0513-014 · Operating Engineers agreement, May 1, 2025
POWER EQUIPMENT OPERATOR: ROLLER$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: BULLDOZER$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (PAVER)$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (LOADER)$39.06$30.38$69.44Agreement
IRON0782-008 · Ironworkers agreement, August 1, 2024
IRONWORKER: REINFORCING AND STRUCTURAL$34.47$24.85$59.32Agreement
LABO1104-001 · Laborers agreement, March 1, 2025
LABORER (COMMON OR GENERAL & LANDSCAPE)$30.48$14.91$45.39Agreement
LABORER (BRICK MASON TENDER)$31.80$14.91$46.71Agreement
PLAS0908-002 · Plasterers and Cement Masons agreement, May 1, 2025
CEMENT MASON/CONCRETE FINISHER$35.10$18.78$53.88Agreement
PLUM0562-012 · Plumbers and Pipefitters agreement, July 1, 2024
PIPEFITTER (HVAC PIPE INSTALLATION)…
Full text

PIPEFITTER (HVAC PIPE INSTALLATION) (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION)

$50.60$30.13$80.73Agreement
PIPEFITTER (HVAC PIPE INSTALLATION)…
Full text

PIPEFITTER (HVAC PIPE INSTALLATION) (MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER)

$48.66$22.79$71.45Agreement
ROOF0002-011 · Roofers agreement, June 1, 2025
ROOFER$32.25$17.46$49.71Agreement
SFMO0669-003 · SFMO, April 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$45.94$27.53$73.47SFMO
SHEE0036-017 · Sheet Metal Workers agreement, August 1, 2025
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$52.00$27.12$79.12Agreement
SUMO2010-021 · Survey of contractors in MO, March 8, 2010
TRUCK DRIVER: DUMP TRUCK$25.57$0.00$25.57Survey
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION$23.90$0.00$23.90Survey
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION$32.74$0.00$32.74Survey
PAINTER: SPRAY$18.79$8.12$26.91Survey
PAINTER: ROLLER$16.44$6.01$22.45Survey
PAINTER: BRUSH ONLY$16.44$6.01$22.45Survey
OPERATOR: GRADER/BLADE$22.80$10.78$33.58Survey
BRICKLAYER$29.75$0.00$29.75Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MO20260022?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.