Prevailing wage rates: Ralls County, Missouri

Building construction · MO20260020 modification 1, published May 18, 2026

The short answer

This sheet sets 27 classifications for building work in Ralls County, Missouri. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $19.38 an hour (glazier) to $82.53 (plumber, excludes hvac pipe installation). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0001-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 7, 2024
ASBESTOS WORKER/HEAT & FROST INSULATOR$43.48$27.24$70.72Agreement
BRMO0001-001 · Bricklayers agreement, June 4, 2025
BRICKLAYER$41.15$23.90$65.05Agreement
BRMO0018-001 · Bricklayers agreement, July 5, 2023
TILE SETTER$34.09$19.91$54.00Agreement
CARP0008-002 · Carpenters agreement, May 1, 2024
CARPENTER, EXCLUDES FORM WORK$35.49$21.85$57.34Agreement
ELEC0350-006 · Electrical Workers (IBEW) agreement, December 1, 2024
ELECTRICIAN$37.60$22.14$59.74Agreement
ENGI0513-009 · Operating Engineers agreement, May 1, 2025
POWER EQUIPMENT OPERATOR: ROLLER$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: BULLDOZER$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (PAVER)$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (LOADER)$39.06$30.38$69.44Agreement
IRON0396-012 · Ironworkers agreement, August 7, 2024
IRONWORKER: REINFORCING AND STRUCTURAL$41.67$31.25$72.92Agreement
LABO0955-002 · Laborers agreement, March 1, 2024
LABORER (LANDSCAPE)$27.71$15.50$43.21Agreement
LABORER (BRICK MASON TENDER)$29.71$15.50$45.21Agreement
PAIN0002-008 · Painters and Allied Trades agreement, September 12, 2011
PAINTER (BRUSH & ROLLER ONLY)$28.75$12.58$41.33Agreement
PLUM0562-011 · Plumbers and Pipefitters agreement, July 1, 2025
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…
Full text

PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES)

$50.66$23.34$74.00Agreement
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…
Full text

PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.)

$52.60$29.93$82.53Agreement
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…
Full text

PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES)

$50.66$23.34$74.00Agreement
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…
Full text

PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.)

$52.60$29.93$82.53Agreement
ROOF0020-012 · Roofers agreement, September 19, 2023
ROOFER$33.60$19.99$53.59Agreement
SHEE0036-017 · Sheet Metal Workers agreement, August 1, 2025
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$52.00$27.12$79.12Agreement
SUMO2010-019 · Survey of contractors in MO, March 8, 2010
TRUCK DRIVER: DUMP TRUCK$28.92$0.00$28.92Survey
PAINTER: SPRAY$18.79$8.12$26.91Survey
OPERATOR: BACKHOE/TRACKHOE$31.12$0.00$31.12Survey
LABORER: COMMON OR GENERAL$22.23$0.00$22.23Survey
GLAZIER$14.19$5.19$19.38Survey
FORM WORKER$26.44$0.00$26.44Survey
CEMENT MASON/CONCRETE FINISHER$18.86$7.50$26.36Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MO20260020?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator