CertifiedHours

Prevailing wage rates · Missouri · Wage determination

Prevailing wage rates: Phelps County, Missouri

Building construction · MO20260018 modification 1, published May 18, 2026

The short answer

This sheet sets 30 classifications for building work in Phelps County, Missouri. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $24.90 an hour (laborer: asbestos abatement (removal from floors, walls, & ceilings)) to $82.53 (plumber, excludes hvac pipe installation). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0001-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 7, 2024
ASBESTOS WORKER/HEAT & FROST INSULATOR$43.48$27.24$70.72Agreement
BRMO0011-009 · Bricklayers agreement, April 1, 2023
TILE SETTER$32.79$21.31$54.10Agreement
CARP0012-002 · Carpenters agreement, May 1, 2024
CARPENTER (INCLUDING DRYWALL HANGING & FORM WORK)$44.19$21.85$66.04Agreement
CARP1310-003 · Carpenters agreement, May 1, 2024
CARPENTER (FLOOR LAYER) (RESILIENT & VINYL FLOORING ONLY)$40.08$21.85$61.93Agreement
ELEC0257-011 · Electrical Workers (IBEW) agreement, March 1, 2025
ELECTRICIAN$40.50$23.26$63.76Agreement
ENGI0513-001 · Operating Engineers agreement, May 1, 2025
POWER EQUIPMENT OPERATOR: ROLLER$35.76$30.38$66.14Agreement
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: BULLDOZER$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (PAVER)$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (LOADER)$39.06$30.38$69.44Agreement
POWER EQUIPMENT OPERATOR: (BACKHOE/EXCAVATOR/ TRACKHOE)$39.06$30.38$69.44Agreement
LABO0840-003 · Laborers agreement, March 1, 2025
LABORER (COMMON OR GENERAL & LANDSCAPE)$30.33$15.30$45.63Agreement
LABORER (BRICK MASON TENDER)$32.23$15.30$47.53Agreement
PAIN1185-012 · Painters and Allied Trades agreement, April 1, 2025
PAINTER (DRYWALL FINISHING/TAPING ONLY)$34.90$17.21$52.11Agreement
PAINTER (BRUSH & ROLLER ONLY)$33.90$17.21$51.11Agreement
PLAS0527-006 · Plasterers and Cement Masons agreement, April 1, 2023
CEMENT MASON/CONCRETE FINISHER$36.63$9.85$46.48Agreement
PLUM0562-011 · Plumbers and Pipefitters agreement, July 1, 2025
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…
Full text

PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES)

$50.66$23.34$74.00Agreement
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…
Full text

PLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.)

$52.60$29.93$82.53Agreement
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…
Full text

PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES)

$50.66$23.34$74.00Agreement
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…
Full text

PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.)

$52.60$29.93$82.53Agreement
ROOF0020-012 · Roofers agreement, September 19, 2023
ROOFER$33.60$19.99$53.59Agreement
SFMO0669-003 · SFMO, April 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$45.94$27.53$73.47SFMO
SHEE0036-017 · Sheet Metal Workers agreement, August 1, 2025
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION$52.00$27.12$79.12Agreement
SUMO2010-017 · Survey of contractors in MO, March 8, 2010
TRUCK DRIVER: DUMP TRUCK$25.57$0.00$25.57Survey
PAINTER: SPRAY$18.79$8.12$26.91Survey
LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS)$24.90$0.00$24.90Survey
IRONWORKER, STRUCTURAL$26.58$13.15$39.73Survey
IRONWORKER, REINFORCING$21.02$9.49$30.51Survey
GLAZIER$29.87$1.47$31.34Survey
BRICKLAYER$27.66$5.88$33.54Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MO20260018?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Phelps County, Missouri (Building) · MO20260018 Mod 1 · CertifiedHours