Prevailing wage rates: Audrain County, Missouri
Building construction · MO20260002 modification 1, published May 18, 2026
The short answer
This sheet sets 29 classifications for building work in Audrain County, Missouri. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $19.38 an hour (glazier) to $82.53 (plumber, excludes hvac pipe installation). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0001-005 · Asbestos Workers and Heat & Frost Insulators agreement, October 7, 2024 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 | $70.72 | Agreement |
| BRMO0011-001 · Bricklayers agreement, April 1, 2023 | ||||
| TILE SETTER | $32.79 | $21.31 | $54.10 | Agreement |
| BRICKLAYER | $32.79 | $21.31 | $54.10 | Agreement |
| CARP0002-010 · Carpenters agreement, May 1, 2024 | ||||
| CARPENTER, EXCLUDES FORM WORK: PROJECTS UNDER $1 MILLION (EAST OF HIGHWAY 19) | $39.53 | $21.85 | $61.38 | Agreement |
| CARPENTER, EXCLUDES FORM WORK: PROJECTS $1 MILLION AND OVER (EAST OF HIGHWAY 19) | $41.30 | $21.85 | $63.15 | Agreement |
| CARP0010-004 · Carpenters agreement, May 1, 2024 | ||||
| CARPENTER, EXCLUDES FORM WORK (WEST OF HIGHWAY 19) | $31.51 | $22.25 | $53.76 | Agreement |
| ELEC0257-005 · Electrical Workers (IBEW) agreement, March 1, 2025 | ||||
| ELECTRICIAN (WEST OF HIGHWAY 19) | $40.50 | $23.26 | $63.76 | Agreement |
| ELEC0350-003 · Electrical Workers (IBEW) agreement, December 1, 2024 | ||||
| ELECTRICIAN (EAST OF HIGHWAY 19) | $37.60 | $22.14 | $59.74 | Agreement |
| ENGI0513-009 · Operating Engineers agreement, May 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: ROLLER | $39.06 | $30.38 | $69.44 | Agreement |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $39.06 | $30.38 | $69.44 | Agreement |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $39.06 | $30.38 | $69.44 | Agreement |
| POWER EQUIPMENT OPERATOR: (PAVER) | $39.06 | $30.38 | $69.44 | Agreement |
| POWER EQUIPMENT OPERATOR: (LOADER) | $39.06 | $30.38 | $69.44 | Agreement |
| IRON0396-012 · Ironworkers agreement, August 7, 2024 | ||||
| IRONWORKER: REINFORCING AND STRUCTURAL | $41.67 | $31.25 | $72.92 | Agreement |
| LABO0955-001 · Laborers agreement, March 1, 2025 | ||||
| LABORER (COMMON OR GENERAL & LANDSCAPE) | $28.78 | $16.05 | $44.83 | Agreement |
| LABORER (BRICK MASON TENDER) | $30.78 | $16.05 | $46.83 | Agreement |
| PAIN1185-002 · Painters and Allied Trades agreement, April 1, 2025 | ||||
| PAINTER (BRUSH & ROLLER ONLY) | $28.56 | $17.21 | $45.77 | Agreement |
| PLUM0562-011 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…Full textPLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | Agreement |
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION…Full textPLUMBER, EXCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | Agreement |
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…Full textPIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 | $74.00 | Agreement |
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION…Full textPIPEFITTER, INCLUDES HVAC PIPE INSTALLATION (ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 | $82.53 | Agreement |
| ROOF0020-012 · Roofers agreement, September 19, 2023 | ||||
| ROOFER | $33.60 | $19.99 | $53.59 | Agreement |
| SHEE0036-021 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $36.51 | $22.39 | $58.90 | Agreement |
| SUMO2010-001 · Survey of contractors in MO, March 8, 2010 | ||||
| TRUCK DRIVER: DUMP TRUCK | $28.92 | $0.00 | $28.92 | Survey |
| PAINTER: SPRAY | $18.79 | $8.12 | $26.91 | Survey |
| OPERATOR: BACKHOE/TRACKHOE | $31.12 | $0.00 | $31.12 | Survey |
| GLAZIER | $14.19 | $5.19 | $19.38 | Survey |
| FORM WORKER | $26.44 | $0.00 | $26.44 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 | $26.36 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MO20260002?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator