CertifiedHours

Prevailing wage rates · Minnesota · Wage determination

Prevailing wage rates: Anoka, Carver, Chisago and 5 more counties, Minnesota

Heavy, Highway construction · MN20260239 modification 2, published July 30, 2026

The short answer

This sheet sets 43 classifications for heavy, highway work in Anoka, Carver, Chisago and 5 more counties, Minnesota. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $28.95 an hour (blaster) to $100.54 (pipefitter/steamfitter). Your contract may lock an earlier modification.

Scope

Please refer to Minnesota Rules 5200.1100, 5200.1101, and 5200.1102 for definitions of labor classifications on this wage determination, and direct any questions regarding such classifications to the Branch of Construction Wage Determinations.

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification. Of the 37 rates we can follow line by line from the first publication to today, 24 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

July 30, 2026 · modification 2

24 rates raised, 1 fringe formula changed; 6 classifications added, 6 classifications removed

  • Power equipment operator: 4 rates raised by $6.68 to $7.20 an hour
  • Truck driver: 2 rates raised by $11.55 to $11.58 an hour
  • Articulated hauler: 1 rate raised by $7.11 an hour
  • Asbestos abatement worker: 1 rate raised by $3.25 an hour
  • Boom truck: 1 rate raised by $7.34 an hour
  • Bricklayer: 1 rate raised by $6.49 an hour
  • Carpenter: 1 rate raised by $3.19 an hour
  • Cement mason: 1 fringe formula changed
  • and 13 more trades
Every line that changed (25)
ClassificationWasNowChange
ARTICULATED HAULERNew source: SAMN2024-009 replaced by SAMN2025-001$44.67 + $26.90$47.68 + $31.00+$7.11 (+9.9%)
ASBESTOS ABATEMENT WORKERNew source: SAMN2024-009 replaced by SAMN2025-001$39.86 + $24.11$41.23 + $25.99+$3.25 (+5.1%)
BOOM TRUCKNew source: SAMN2024-009 replaced by SAMN2025-001$47.25 + $26.90$50.49 + $31.00+$7.34 (+9.9%)
BRICKLAYERNew source: SAMN2024-009 replaced by SAMN2025-001$48.23 + $26.53$52.91 + $28.34+$6.49 (+8.7%)
CARPENTERNew source: SAMN2024-009 replaced by SAMN2025-001$49.82 + $29.92$50.76 + $32.17+$3.19 (+4.0%)
CEMENT MASONNew source: SAMN2024-009 replaced by SAMN2025-001$51.23 + $26.22$49.63 + $27.82no rate change
ELECTRICIANNew source: SAMN2024-009 replaced by SAMN2025-001$60.40 + $34.39$63.59 + $35.79+$4.59 (+4.8%)
GROUND PERSONNew source: SAMN2024-009 replaced by SAMN2025-001$37.77 + $20.38$46.41 + $22.77+$11.03 (+19.0%)
IRONWORKERNew source: SAMN2024-009 replaced by SAMN2025-001$44.85 + $35.72$49.50 + $37.86+$6.79 (+8.4%)
LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH A…New source: SAMN2024-009 replaced by SAMN2025-001$30.04 + $21.16$42.60 + $31.00+$22.40 (+43.8%)
LINEMANNew source: SAMN2024-009 replaced by SAMN2025-001$50.86 + $23.57$59.36 + $26.71+$11.64 (+15.6%)
MILLWRIGHTNew source: SAMN2024-009 replaced by SAMN2025-001$43.44 + $33.37$46.15 + $37.81+$7.15 (+9.3%)
OFF-ROAD TRUCKNew source: SAMN2024-009 replaced by SAMN2025-001$44.67 + $26.90$47.68 + $31.00+$7.11 (+9.9%)
PAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS)New source: SAMN2024-009 replaced by SAMN2025-001$45.50 + $27.69$50.50 + $29.09+$6.40 (+8.7%)
PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)New source: SAMN2024-009 replaced by SAMN2025-001$49.46 + $30.23$50.90 + $31.98+$3.19 (+4.0%)
PIPEFITTER/STEAMFITTERNew source: SAMN2024-009 replaced by SAMN2025-001$55.94 + $34.50$61.24 + $39.30+$10.10 (+11.2%)
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2 : HELICOPTER PILOT; CONCRETE PUMP; ALL C…New source: SAMN2024-009 replaced by SAMN2025-001$45.61 + $26.90$48.71 + $31.00+$7.20 (+9.9%)
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD M…New source: SAMN2024-009 replaced by SAMN2025-001$44.67 + $26.90$47.68 + $31.00+$7.11 (+9.9%)
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5 : AIR COMPRESSOR, 600 CFM OR OVER; BITUM…New source: SAMN2024-009 replaced by SAMN2025-001$41.36 + $26.90$44.06 + $31.00+$6.80 (+10.0%)
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6 : CAT, CHALLENGER, OR SIMILAR TYPE OF TR…New source: SAMN2024-009 replaced by SAMN2025-001$40.02 + $26.90$42.60 + $31.00+$6.68 (+10.0%)
SHEET METAL WORKERNew source: SAMN2024-009 replaced by SAMN2025-001$57.96 + $34.57$60.96 + $35.82+$4.25 (+4.6%)
TRUCK DRIVER GROUP 2 : FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCKNew source: SAMN2024-009 replaced by SAMN2025-001$34.70 + $21.75$42.63 + $25.40+$11.58 (+20.5%)
TRUCK DRIVER GROUP 3 : BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON…New source: SAMN2024-009 replaced by SAMN2025-001$34.60 + $21.76$42.51 + $25.40+$11.55 (+20.5%)
WIRING SYSTEM TECHNICIANNew source: SAMN2024-009 replaced by SAMN2025-001$47.73 + $22.24$54.44 + $24.02+$8.49 (+12.1%)
WIRING SYSTEMS INSTALLERNew source: SAMN2024-009 replaced by SAMN2025-001$33.44 + $17.82$35.78 + $18.73+$3.25 (+6.3%)
Classifications added or removed
  • Added: HEATING AND FROST INSULATOR $47.10 + $24.40
  • Added: LABORER: COMMON (GENERAL LABOR WORK) $44.00 + $26.12
  • Added: LABORER: LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR) $31.66 + $22.78
  • Added: POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3… $48.05 + $31.00
  • Added: TRUCK DRIVER GROUP 1… $43.29 + $25.40
  • Added: TRUCK DRIVER GROUP 4… $42.21 + $25.40
  • Removed: TRUCK DRIVER: GROUP 4…
  • Removed: TRUCK DRIVER: GROUP 1…
  • Removed: POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3…
  • Removed: LABORER: LANDSCAPE (GARDENER, SOD LAYER AND NURSERY OPERATOR)
  • Removed: LABORER: COMMON OR GENERAL (GENERAL LABOR WORK)
  • Removed: HEATING AND FROST INSULATORS

Earlier modifications

  • May 18, 2026 · modification 1Classification names reworded; no change among the 43 lines we could match

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
SAMN2025-001 · SAMN, November 3, 2025
ARTICULATED HAULER$47.68$31.00$78.68+$7.11 (+9.9%)SAMN
ASBESTOS ABATEMENT WORKER$41.23$25.99$67.22+$3.25 (+5.1%)SAMN
BLASTER$22.08$6.87$28.95no changeSAMN
BOILERMAKER$48.35$31.93$80.28no changeSAMN
BOOM TRUCK$50.49$31.00$81.49+$7.34 (+9.9%)SAMN
BRICKLAYER$52.91$28.34$81.25+$6.49 (+8.7%)SAMN
CARPENTER$50.76$32.17$82.93+$3.19 (+4.0%)SAMN
CEMENT MASON$49.63$27.82$77.45no rate changeSAMN
ELECTRICIAN$63.59$35.79$99.38+$4.59 (+4.8%)SAMN
FLAG PERSON$44.00$26.12$70.12no changeSAMN
GROUND PERSON$46.41$22.77$69.18+$11.03 (+19.0%)SAMN
HEATING AND FROST INSULATOR$47.10$24.40$71.50—SAMN
IRONWORKER$49.50$37.86$87.36+$6.79 (+8.4%)SAMN
LABORER: COMMON (GENERAL LABOR WORK)$44.00$26.12$70.12—SAMN
LABORER: LANDSCAPING (GARDENER, SOD LAYER AND NURSERY OPERATOR)$31.66$22.78$54.44—SAMN
LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN)$44.00$26.12$70.12no changeSAMN
LANDSCAPING EQUIPMENT…
Full text

LANDSCAPING EQUIPMENT (INCLUDES HYDRO SEEDER OR MULCHER, SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS)

$42.60$31.00$73.60+$22.40 (+43.8%)SAMN
LINEMAN$59.36$26.71$86.07+$11.64 (+15.6%)SAMN
MILLWRIGHT$46.15$37.81$83.96+$7.15 (+9.3%)SAMN
OFF-ROAD TRUCK$47.68$31.00$78.68+$7.11 (+9.9%)SAMN
PAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS)$50.50$29.09$79.59+$6.40 (+8.7%)SAMN
PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT…
Full text

PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT ((ONE OR TWO PERSON OPERATORS); SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.)

$38.90$23.49$62.39no changeSAMN
PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS)$50.90$31.98$82.88+$3.19 (+4.0%)SAMN
PIPEFITTER/STEAMFITTER$61.24$39.30$100.54+$10.10 (+11.2%)SAMN
PIPELAYER (WATER, SEWER AND GAS)$47.50$26.12$73.62no changeSAMN
PLUMBER$61.28$31.52$92.80no changeSAMN
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2 : HELICOPTER PILOT; CONCRETE PUMP; ALL CRANES WITH OVER 135-FOOT BOOM, EXCLUDING JIB; DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR WHEEL MOUNTED) AND/OR OTHER SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS THREE CUBIC YARDS AND OVER MANUFACTURER.S RATED CAPACITY INCLUDING ALL ATTACHMENTS.; GRADER OR MOTOR PATROL; PILE DRIVING; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED

$48.71$31.00$79.71+$7.20 (+9.9%)SAMN
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 3 : ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; CONCRETE MIXER, STATIONARY PLANT; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DRAGLINE, CRAWLER, HYDRAULIC BACKHOE (TRACK OR WHEEL MOUNTED) AND/OR SIMILAR EQUIPMENT WITH SHOVEL-TYPE CONTROLS, UP TO THREE CUBIC YARDS MANUFACTURER.S RATED CAPACITY INCLUDING ALL ATTACHMENTS; DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER; FRONT END LOADER, FIVE CUBIC YARDS AND OVER INCLUDING ATTACHMENTS.; LOCOMOTIVE CRANE OPERATOR; MIXER (PAVING) CONCRETE PAVING, ROAD MOLE, INCLUDING MUCKING OPERATIONS, CONWAY OR SIMILAR TYPE; MECHANIC . WELDER ON POWER EQUIPMENT; TRACTOR . BOOM TYPE; TANDEM SCRAPER; TRUCK CRANE . CRAWLER CRANE; TUGBOAT 100 H.P AND OVER

$48.05$31.00$79.05—SAMN
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 4 : AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR); BACKFILLER OPERATOR; CONCRETE BATCH PLANT OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL DRUMMED (EIGHT TONS AND OVER); BITUMINOUS SPREADER AND FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFACING AND MICRO SURFACING, OR SIMILAR TYPES (OPERATOR AND SCREED PERSON); BROKK OR R.T.C. REMOTE CONTROL OR SIMILAR TYPE WITH ALL ATTACHMENTS; CAT CHALLENGER TRACTORS OR SIMILAR TYPES PULLING ROCK WAGONS, BULLDOZERS AND SCRAPERS; CHIP HARVESTER AND TREE CUTTER; CONCRETE DISTRIBUTOR AND SPREADER FINISHING MACHINE, LONGITUDINAL FLOAT, JOINT MACHINE, AND SPRAY MACHINE; CONCRETE MIXER ON JOBSITE; CONCRETE MOBIL; CRUSHING PLANT (GRAVEL AND STONE) OR GRAVEL WASHING, CRUSHING AND SCREENING PLANT; CURB MACHINE; DIRECTIONAL BORING MACHINE; DOPE MACHINE (PIPELINE); DRILL RIGS, HEAVY ROTARY OR CHURN OR CABLE DRILL; DUAL TRACTOR; ELEVATING GRADER; FORK LIFT OR STRADDLE CARRIER; FORK LIFT OR LUMBER STACKER; FRONT END, SKID STEER OVER 1 TO 5 C YD; GPS REMOTE OPERATING OF EQUIPMENT; HOIST ENGINEER (POWER); HYDRAULIC TREE PLANTER; LAUNCHER PERSON (TANKER PERSON OR PILOT LICENSE); LOCOMOTIVE; MILLING, GRINDING, PLANNING, FINE GRADE, OR TRIMMER MACHINE; MULTIPLE MACHINES, SUCH AS AIR COMPRESSORS, WELDING MACHINES, GENERATORS, PUMPS; PAVEMENT BREAKER OR TAMPING MACHINE (POWER DRIVEN) MIGHTY MITE OR SIMILAR TYPE; PICKUP SWEEPER, ONE CUBIC YARD AND OVER HOPPER CAPACITY; PIPELINE WRAPPING, CLEANING OR BENDING MACHINE; POWER PLANT ENGINEER, 100 KWH AND OVER; POWER ACTUATED HORIZONTAL BORING MACHINE, OVER SIX INCHES; PUGMILL; PUMPCRETE; RUBBER-TIRED FARM TRACTOR WITH BACKHOE INCLUDING ATTACHMENTS; SCRAPER; SELF-PROPELLED SOIL STABILIZER; SLIP FORM (POWER DRIVEN) (PAVING); TIE TAMPER AND BALLAST MACHINE; TRACTOR, BULLDOZER; TRACTOR, WHEEL TYPE, OVER 50 H.P. WITH PTO UNRELATED TO LANDSCAPING; TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER; TUB GRINDER, MORBARK, OR SIMILAR TYPE; WELL POINT DISMANTLING OR INSTALLATION

$47.68$31.00$78.68+$7.11 (+9.9%)SAMN
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5…
Full text

POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 5 : AIR COMPRESSOR, 600 CFM OR OVER; BITUMINOUS ROLLER (UNDER EIGHT TONS); CONCRETE SAW (MULTIPLE BLADE) (POWER OPERATED); FORM TRENCH DIGGER (POWER); FRONT END, SKID STEER UP TO 1C YD; GUNITE GUNALL; HYDRAULIC LOG SPLITTER; LOADER (BARBER GREENE OR SIMILAR TYPE); POST HOLE DRIVING MACHINE/POST HOLE AUGER; POWER ACTUATED AUGER AND BORING MACHINE; POWER ACTUATED JACK; PUMP; SELF-PROPELLED CHIP SPREADER (FLAHERTY OR SIMILAR); SHEEP FOOT COMPACTOR WITH BLADE . 200 H.P. AND OVER; SHOULDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLUDING SELF-PROPELLED SAND AND CHIP SPREADER; STUMP CHIPPER AND TREE CHIPPER; TREE FARMER (MACHINE)

$44.06$31.00$75.06+$6.80 (+10.0%)SAMN
POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6…
Full text

POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 6 : CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING DISK OR ROLLER; CONVEYOR; DREDGE DECK HAND; FIRE PERSON OR TANK CAR HEATER; GRAVEL SCREENING PLANT (PORTABLE NOT CRUSHING OR WASHING); GREASER (TRACTOR); LEVER PERSON; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS, AND MILLING MACHINES, OR OTHER SIMILAR HEAVY EQUIPMENT); POWER SWEEPER; SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS; TRACTOR, WHEEL TYPE, OVER 50 H.P., UNRELATED TO LANDSCAPING

$42.60$31.00$73.60+$6.68 (+10.0%)SAMN
SHEET METAL WORKER$60.96$35.82$96.78+$4.25 (+4.6%)SAMN
SURVEY FIELD TECHNICIAN…
Full text

SURVEY FIELD TECHNICIAN (OPERATE TOTAL STATION, GPS RECEIVER, LEVEL, ROD OR RANGE POLES, STEEL TAPE MEASUREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS).

$44.00$26.12$70.12no changeSAMN
TILE SETTER$34.76$23.29$58.05no changeSAMN
TRAFFIC CONTROL PERSON (TEMPORARY SIGNAGE)$44.00$26.12$70.12no changeSAMN
TRUCK DRIVER GROUP 1…
Full text

TRUCK DRIVER GROUP 1 : MECHANIC . WELDER; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES)

$43.29$25.40$68.69—SAMN
TRUCK DRIVER GROUP 2 : FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK$42.63$25.40$68.03+$11.58 (+20.5%)SAMN
TRUCK DRIVER GROUP 3…
Full text

TRUCK DRIVER GROUP 3 : BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS

$42.51$25.40$67.91+$11.55 (+20.5%)SAMN
TRUCK DRIVER GROUP 4…
Full text

TRUCK DRIVER GROUP 4 : BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TRACTOR OPERATOR, UNDER 50 H.P

$42.21$25.40$67.61—SAMN
TUNNEL MINER$45.50$26.12$71.62no changeSAMN
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)$45.50$26.12$71.62no changeSAMN
WIRING SYSTEM TECHNICIAN$54.44$24.02$78.46+$8.49 (+12.1%)SAMN
WIRING SYSTEMS INSTALLER$35.78$18.73$54.51+$3.25 (+6.3%)SAMN

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MN20260239?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MN20260239 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 43 classifications in 1 rate groups
  • 0 from agreements, 0 from surveys
  • Counties: Anoka, Carver, Chisago, Dakota, Hennepin, Ramsey, Scott, Washington