CertifiedHours

Prevailing wage rates · Minnesota · Wage determination

Prevailing wage rates: Clay, Houston and Polk Counties, Minnesota

Residential construction · MN20260024 modification 2, published May 18, 2026

The short answer

This sheet sets 37 classifications for residential work in Clay, Houston and Polk Counties, Minnesota. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $11.50 an hour (laborer: landscape) to $83.21 (ironworker: structural (houston)). Your contract may lock an earlier modification.

Scope

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification. Of the 37 rates we can follow line by line from the first publication to today, 1 is higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

May 18, 2026 · modification 2

Classification names reworded; no change among the 37 lines we could match

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Earlier modifications

  • January 30, 2026 · modification 11 rate raised
    • Plumber: 1 rate raised by $2.40 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    PLUMBER$46.34 + $21.34$48.74 + $21.34+$2.40 (+3.5%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
CARP1382-030 · Carpenters agreement, April 29, 2024
CARPENTER (HOUSTON)$36.71$20.17$56.88no changeAgreement, 2024
CARP1934-004 · Carpenters agreement, April 29, 2024
CARPENTER (CLAY, POLK)$31.14$20.69$51.83no changeAgreement, 2024
ELEC0343-017 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (HOUSTON)$40.25$23.32$63.57no changeAgreement, 2025
ELEC1426-019 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (CLAY, POLK)$37.41$18.61$56.02no changeAgreement, 2025
ENGI0049-062 · Operating Engineers agreement, May 1, 2011
OPERATOR: POWER EQUIPMENT GROUP 8 OILER. (CLAY, POLK)$26.80$15.85$42.65no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (CLAY, POLK)

$29.75$15.85$45.60no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2. (CLAY, POLK)

$31.17$15.85$47.02no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (CLAY, POLK)$31.33$15.85$47.18no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (CLAY, POLK)$32.98$15.85$48.83no changeAgreement, 2011
ENGI0049-063 · Operating Engineers agreement, May 1, 2011
OPERATOR: POWER EQUIPMENT GROUP 8OILER. (HOUSTON)$28.29$15.85$44.14no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT GROUP 6 LOADER UP TO 1 CU YD, TRACTOR D2 OR SIMILAR SIZE. (HOUSTON)

$31.42$15.85$47.27no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT GROUP 5 BULLDOZER, CURB MACHINE, FORKLIFT, LOADER OVER 1 CU YD, MECHANIC, ROLLER, SCRAPER, TRACTOR OVER D2.(HOUSTON)

$32.93$15.85$48.78no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 4 BACKHOE (HOUSTON)$33.10$15.85$48.95no changeAgreement, 2011
OPERATOR: POWER EQUIPMENT GROUP 2 GRADER/BLADE (HOUSTON)$34.85$15.85$50.70no changeAgreement, 2011
IRON0512-039 · Ironworkers agreement, April 4, 2025
IRONWORKER: STRUCTURAL (CLAY, POLK)$42.89$36.86$79.75no changeAgreement, 2025
IRON0512-040 · Ironworkers agreement, April 4, 2025
IRONWORKER: STRUCTURAL (HOUSTON)$46.35$36.86$83.21no changeAgreement, 2025
LABO0405-016 · Laborers agreement, May 1, 2019
LABORERS: (3) MASON TENDER (BRICK, CEMENT/CONCRETE) (HOUSTON)$25.42$17.52$42.94no changeAgreement, 2019
LABORERS: (2) PIPELAYER (HOUSTON)$27.95$17.52$45.47no changeAgreement, 2019
LABORERS: (1) COMMON OR GENERAL (HOUSTON)$27.25$17.52$44.77no changeAgreement, 2019
LABO0563-024 · Laborers agreement, May 1, 2012
LABORERS GROUP 2…
Full text

LABORERS GROUP 2 PIPELAYER (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR

$20.96$14.97$35.93no changeAgreement, 2012
LABORERS GROUP 1…
Full text

LABORERS GROUP 1 COMMON OR GENERAL; MASON TENDER (BRICK, CEMENT/CONCRETE) (CLAY (EXCEPT CITY OF MOORHEAD)) PROJECTS OVER $950,000: $1.75 ADDITIONAL PER HOUR

$20.21$14.97$35.18no changeAgreement, 2012
LABO0563-025 · Laborers agreement, May 1, 2012
LABORERS: COMMON OR GENERAL LABORER…
Full text

LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (CLAY (CITY OF MOORHEAD) COUNTY

$18.60$13.44$32.04no changeAgreement, 2012
LABO1097-006 · Laborers agreement, May 1, 2017
LABORERS: COMMON OR GENERAL LABORER…
Full text

LABORERS: COMMON OR GENERAL LABORER, MASON TENDER (BRICK,CEMENT/CONCRETE), PIPELAYER (POLK (CITY OF EAST GRAND FORKS) COUNTY)

$20.87$17.39$38.26no changeAgreement, 2017
LABO1097-021 · Laborers agreement, May 1, 2023
LABORER GROUP 2…
Full text

LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:)

$24.20$21.74$45.94no changeAgreement, 2023
LABORER GROUP 2…
Full text

LABORER GROUP 2 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over)

$28.47$21.74$50.21no changeAgreement, 2023
LABORER GROUP 1…
Full text

LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects under $760,000:)

$23.86$21.74$45.60no changeAgreement, 2023
LABORER GROUP 1…
Full text

LABORER GROUP 1 (POLK (EXCLUDING THE CITY LIMITS OF EAST GRAND FORKS)) (Projects $760k and over)

$28.07$21.74$49.81no changeAgreement, 2023
PAIN0681-024 · Painters and Allied Trades agreement, May 5, 2025
PAINTER: SPRAY (HOUSTON)$19.00$3.00$22.00no changeAgreement, 2025
PAIN0884-027 · Painters and Allied Trades agreement, June 1, 2010
PAINTER: SPRAY (CLAY, POLK)$22.61$8.66$31.27no changeAgreement, 2010
PLUM0006-012 · Plumbers and Pipefitters agreement, May 1, 2024
PLUMBER (HOUSTON)$47.50$30.33$77.83no changeAgreement, 2024
PLUM0011-026 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER (CLAY, POLK)$48.74$21.34$70.08+$2.40 (+3.5%)Agreement, 2025
ROOF0096-059 · Roofers agreement, May 1, 2017
ROOFER (CLAY, POLK)$36.01$16.72$52.73no changeAgreement, 2017
ROOF0096-060 · Roofers agreement, June 1, 2024
ROOFER (HOUSTON)$32.71$16.99$49.70no changeAgreement, 2024
SHEE0010-089 · Sheet Metal Workers agreement, June 2, 2025
SHEET METAL WORKER (POLK)$35.37$21.12$56.49no changeAgreement, 2025
SHEE0010-090 · Sheet Metal Workers agreement, June 1, 2025
SHEET METAL WORKER (CLAY)$35.76$23.17$58.93no changeAgreement, 2025
SHEE0010-091 · Sheet Metal Workers agreement, May 1, 2025
SHEET METAL WORKER (HOUSTON)$40.03$28.95$68.98no changeAgreement, 2025
SUMN2009-061 · Survey of contractors in MN, July 27, 2009
LABORER: LANDSCAPE$11.50$0.00$11.50no changeSurvey, 2009

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MN20260024?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MN20260024 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 37 classifications in 23 rate groups
  • 22 from agreements, 1 from surveys
  • Counties: Clay, Houston, Polk