Prevailing wage rates · Minnesota · Wage determination
Prevailing wage rates: McLeod and Sibley Counties, Minnesota
Residential construction · MN20260008 modification 1, published May 18, 2026
The short answer
This sheet sets 66 classifications for residential work in McLeod and Sibley Counties, Minnesota. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.00 an hour (painters: 1 to 3 stories) to $100.96 (elevator mechanic a.paid vacation). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0034-004 · Asbestos Workers and Heat & Frost Insulators agreement, June 9, 2025 | ||||
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 | $89.37 | Agreement |
| BOIL0647-003 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $48.00 | $31.14 | $79.14 | Agreement |
| BRMN0001-007 · Bricklayers agreement, May 1, 2023 | ||||
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON (SIBLEY COUNTY) | $45.11 | $25.61 | $70.72 | Agreement |
| BRMN0001-009 · Bricklayers agreement, May 1, 2023 | ||||
| MARBLE SETTER | $45.47 | $26.33 | $71.80 | Agreement |
| BRMN0001-012 · Bricklayers agreement, May 1, 2023 | ||||
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (MCLEOD COUNTY) | $45.11 | $25.61 | $70.72 | Agreement |
| BRMN0001-020 · Bricklayers agreement, May 1, 2023 | ||||
| TILE LAYER (SIBLEY COUNTY) | $34.92 | $21.81 | $56.73 | Agreement |
| TILE LAYER (MCLEOD COUNTY) | $39.17 | $10.16 | $49.33 | Agreement |
| BRMN0001-023 · Bricklayers agreement, May 1, 2023 | ||||
| TILE FINISHER | $28.50 | $8.20 | $36.70 | Agreement |
| BRMN0001-035 · Bricklayers agreement, May 2, 2022 | ||||
| TERRAZZO WORKER/SETTER (MECHANIC) | $44.36 | $22.35 | $66.71 | Agreement |
| TERRAZZO WORKER/SETTER (FINISHER) | $42.67 | $22.04 | $64.71 | Agreement |
| TERRAZZO WORKER/SETTER (BASE MACHINE) | $40.60 | $21.94 | $62.54 | Agreement |
| CARP0068-001 · Carpenters agreement, May 5, 2025 | ||||
| LATHER | $39.55 | $28.63 | $68.18 | Agreement |
| CARP0068-004 · Carpenters agreement, April 29, 2024 | ||||
Group definitions, zones and premiums for CARP0068-004SOFT FLOOR LAYER (MCLEOD (E. PART, INCLUDING WINSTED, SILVER LAKE, LESTER PRAIRIE, PLATO & GLENCOE) & SIBLEY (NE PART, INCLUDING GREEN ISLE)).$ 39.03 25.00 | ||||
| CARP0548-004 · Carpenters agreement, May 1, 2025 | ||||
| MILLWRIGHT | $42.95 | $36.81 | $79.76 | Agreement |
| CARP0930-018 · Carpenters agreement, April 29, 2024 | ||||
| CARPENTER: WOOD FRAME CONSTRUCTION (MCLEOD) | $36.71 | $20.17 | $56.88 | Agreement |
| CARPENTER (MCLEOD) | $36.71 | $20.17 | $56.88 | Agreement |
| CARP1382-003 · Carpenters agreement, April 29, 2024 | ||||
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (EASTERN 1/3)) | $36.71 | $20.17 | $56.88 | Agreement |
| CARP1382-011 · Carpenters agreement, April 29, 2024 | ||||
Group definitions, zones and premiums for CARP1382-011CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (WESTERN 2/3 INCLUDING GREEN ISLE, NEW AUBURN, AND GAYLORD)).$ 36.71 20.17 | ||||
| ELEC0292-008 · Electrical Workers (IBEW) agreement, July 1, 2023 | ||||
ELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION…Full textELECTRICIAN ELECTRICAL CONTRACTS UNDER $5MILLION (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $43.67 | $22.35 | $66.02 | Agreement |
ELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER…Full textELECTRICIAN ELECTRICAL CONTRACTS $ 5 MILLION AND OVER (MCLEOD COUNTY) CABLE SPLICER = $1.00 ADDITIONAL PER HOUR | $44.12 | $22.57 | $66.69 | Agreement |
| ELEC0343-004 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
| ELECTRICIAN (SIBLEY COUNTY) | $40.25 | $23.32 | $63.57 | Agreement |
| ELEV0009-005 · Elevator Constructors agreement, January 1, 2025 | ||||
ELEVATOR MECHANIC A.PAID VACATION…Full textELEVATOR MECHANIC A.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 | $100.96 | Agreement |
| ENGI0049-012 · Operating Engineers agreement, May 1, 2012 | ||||
POWER EQUIPMENT OPERATOR GROUP 8…Full textPOWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR | $28.29 | $15.95 | $44.24 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 7…Full textPOWER EQUIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE, FIREMAN TEMPORARY HEAT | $30.30 | $15.95 | $46.25 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 6…Full textPOWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD | $31.42 | $15.95 | $47.37 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 5…Full textPOWER EQUIPMENT OPERATOR GROUP 5 AIR COMPRESSOR 450 CFM OR OVER (2 OR MORE MACHINES); PUMP AND/OR CONVEYOR (2 OR MORE MACHINES); MECHANIC; PUMPCRETE OR COMPLACO TYPE MACHINE; FORKLIFT; BOOM TRUCK UP TO 100 FT.; CONCRETE MIXER; DRILL RIG - HEAVY ROTARY OR CHURN WHEN USED FOR CAISSON DRILLING FOR ELEVATOR CYLINDER OR BUILDING CONSTRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OVER D2; & WELL POINT PUMP | $32.93 | $15.95 | $48.88 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 4…Full textPOWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $33.10 | $15.95 | $49.05 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 3…Full textPOWER EQUIPMENT OPERATOR GROUP 3 TRAVELING TOWER CRANE; MASTER MECHANIC; PILE DRIVING (WHEN 3 DRUMS ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $33.44 | $15.95 | $49.39 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 2…Full textPOWER EQUIPMENT OPERATOR GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM | $34.85 | $15.95 | $50.80 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 1…Full textPOWER EQUIPMENT OPERATOR GROUP 1 HELICOPTER; TRUCK & CRAWLER CRANE WITH 200' OF BOOM & OVER, INCLUDING JIB ($.50 PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $35.19 | $15.95 | $51.14 | Agreement |
| IRON0512-004 · Ironworkers agreement, April 30, 2023 | ||||
| IRONWORKER | $43.00 | $34.11 | $77.11 | Agreement |
| LABO0132-001 · Laborers agreement, May 1, 2008 | ||||
LANDSCAPER: SEEDING…Full textLANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (MCLEOD COUNTY) | $16.26 | $9.68 | $25.94 | Agreement |
| LABO0132-005 · Laborers agreement, May 9, 2016 | ||||
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $19.17 | $15.79 | $34.96 | Agreement |
LABORERS: PROJECTS UNDER $1,000,000: GROUP 3…Full textLABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $21.88 | $15.79 | $37.67 | Agreement |
LABORERS: PROJECTS UNDER $1,000,000: GROUP 2…Full textLABORERS: PROJECTS UNDER $1,000,000: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (MCLEOD COUNTY) | $21.97 | $15.79 | $37.76 | Agreement |
LABORERS: PROJECTS UNDER $1,000,000: GROUP 1…Full textLABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING ""PATENT"" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $21.17 | $15.79 | $36.96 | Agreement |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $20.84 | $16.57 | $37.41 | Agreement |
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3…Full textLABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $23.54 | $16.57 | $40.11 | Agreement |
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 2…Full textLABORERS: PROJECTS $1,000,000 & OVER: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (MCLEOD COUNTY) | $23.64 | $16.57 | $40.21 | Agreement |
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1…Full textLABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING ""PATENT"" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $22.84 | $16.57 | $39.41 | Agreement |
| LABO0132-008 · Laborers agreement, January 1, 2017 | ||||
| LABORER (ASBESTOS ABATEMENT) | $30.83 | $17.61 | $48.44 | Agreement |
| LABO0132-017 · Laborers agreement, May 9, 2016 | ||||
| PLASTER TENDER | $21.97 | $15.79 | $37.76 | Agreement |
| LABO0563-004 · Laborers agreement, January 1, 2021 | ||||
LANDSCAPER: SEEDING…Full textLANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (SIBLEY COUNTY) | $28.25 | $16.20 | $44.45 | Agreement |
| LABO0563-005 · Laborers agreement, May 1, 2012 | ||||
| LABORERS: PROJECTS UNDER $1,000,000: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $16.35 | $13.94 | $30.29 | Agreement |
LABORERS: PROJECTS UNDER $1,000,000: GROUP 3…Full textLABORERS: PROJECTS UNDER $1,000,000: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $19.06 | $13.94 | $33.00 | Agreement |
LABORERS: PROJECTS UNDER $1,000,000: GROUP 2…Full textLABORERS: PROJECTS UNDER $1,000,000: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (SIBLEY COUNTY) | $19.15 | $13.94 | $33.09 | Agreement |
LABORERS: PROJECTS UNDER $1,000,000: GROUP 1…Full textLABORERS: PROJECTS UNDER $1,000,000: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING ""PATENT"" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $18.35 | $13.94 | $32.29 | Agreement |
| LABORERS: PROJECTS $1,000,000 & OVER: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $18.04 | $14.70 | $32.74 | Agreement |
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 3…Full textLABORERS: PROJECTS $1,000,000 & OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $20.74 | $14.70 | $35.44 | Agreement |
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 2…Full textLABORERS: PROJECTS $1,000,000 & OVER: GROUP 2 CAISSON WORK; MASON TENDER; MOUNTED WALL SAW OPERATOR; NOZZLE OPERATOR - GUNITE, CEMENT, SANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (SIBLEY COUNTY) | $20.84 | $14.70 | $35.54 | Agreement |
LABORERS: PROJECTS $1,000,000 & OVER: GROUP 1…Full textLABORERS: PROJECTS $1,000,000 & OVER: GROUP 1 CONSTRUCTION; CARPENTER TENDER; CONCRETE; DAMP PROOFER BELOW GRADE; DUMPMAN - DIRT, ASPHALT, CONCRETE, CEMENT; HEATER TENDER; HOT TAR CAULKER - CORKER; JOIST HANDLER; MATERIAL HANDLER - POWER BUGGY; REBAR; SNOW BLOWER OPERATOR; SIGNALPERSON; CHAIN SAW OPERATOR; CONCRETE SAW, DRILL OPERATOR; CONCRETE VIBRATOR; DEMOLITION & WRECKING EXCLUDING REMODELING; DRILL RUNNER TENDER; MORTAR MIXER - CEMENT OR ANY OTHER SUBSTITUTE MATERIAL OR COMPOSITION; PIPE HANDLER; PNEUMATIC & ELECTRIC TOOL, JACKHAMMER, PAVING BUSTER, CHIPPING HAMMER, TAMPER OPERATOR, ETC.; SWING STAGE LINE SCAFFOLD (NOT INCLUDING ""PATENT"" SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $20.04 | $14.70 | $34.74 | Agreement |
| PAIN0386-005 · Painters and Allied Trades agreement, May 1, 2012 | ||||
| PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY (MCLEOD) | $31.45 | $17.85 | $49.30 | Agreement |
| PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER (MCLEOD) | $31.45 | $17.85 | $49.30 | Agreement |
| PAIN0386-006 · Painters and Allied Trades agreement, May 1, 2012 | ||||
| DRYWALL: SANDER (MCLEOD) | $22.63 | $18.67 | $41.30 | Agreement |
| DRYWALL: FINISHER (MCLEOD) | $30.17 | $18.67 | $48.84 | Agreement |
| PAIN0681-003 · Painters and Allied Trades agreement, May 5, 2025 | ||||
| DRYWALL TAPER/FINISHER (SIBLEY COUNTY) | $19.00 | $25.79 | $44.79 | Agreement |
| PAIN0681-009 · Painters and Allied Trades agreement, May 1, 2025 | ||||
PAINTERS: 4 STORIES…Full textPAINTERS: 4 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $35.28 | $25.49 | $60.77 | Agreement |
PAINTERS: 1 TO 3 STORIES…Full textPAINTERS: 1 TO 3 STORIES: BRUSH & ROLLER (SIBLEY COUNTY) PAPERHANGER - $0.25 PER HOUR ADDITIONAL. SPRAY - $0.50 PER HOUR ADDITIONAL APPLICATION OF EPOXY, CREOSOTE, OTHER TOXIC MATERIALS - $0.25 PER HOUR ADDITIONAL | $19.00 | $3.00 | $22.00 | Agreement |
| PAIN1324-003 · Painters and Allied Trades agreement, June 2, 2025 | ||||
| GLAZIER | $50.98 | $27.35 | $78.33 | Agreement |
| PLAS0265-003 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| PLASTERER | $42.52 | $30.37 | $72.89 | Agreement |
| PLAS0633-006 · Plasterers and Cement Masons agreement, May 1, 2023 | ||||
| CEMENT MASON/CONCRETE FINISHER | $46.46 | $23.47 | $69.93 | Agreement |
| PLUM0015-003 · Plumbers and Pipefitters agreement, May 1, 2025 | ||||
| PLUMBER (MCLEOD) FOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 | $92.80 | Agreement |
| PLUM0034-008 · Plumbers and Pipefitters agreement, May 1, 2025 | ||||
| PLUMBER: INCLUDES GAS FITTERS FOOTNOTE: PAID HOLIDAY: LABOR DAY | $36.78 | $34.51 | $71.29 | Agreement |
| PLUM0455-009 · Plumbers and Pipefitters agreement, May 1, 2024 | ||||
| PIPEFITTER (SIBLEY COUNTY) | $37.05 | $30.27 | $67.32 | Agreement |
| PLUM0539-003 · Plumbers and Pipefitters agreement, May 1, 2024 | ||||
| PIPEFITTER (MCLEOD) | $48.33 | $40.46 | $88.79 | Agreement |
| ROOF0096-007 · Roofers agreement, May 5, 2025 | ||||
| ROOFER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $48.32 | $25.54 | $73.86 | Agreement |
| SFMN0669-003 · SFMN, January 1, 2025 | ||||
| SPRINKLER FITTER | $42.94 | $27.26 | $70.20 | SFMN |
| SHEE0010-006 · Sheet Metal Workers agreement, May 1, 2025 | ||||
| SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $45.01 | $26.53 | $71.54 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MN20260008?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator