The short answer

This sheet sets 88 classifications for heavy work in Alcona, Alger, Allegan and 80 more counties, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.54 an hour (laborers - hazardous waste abatement: class a) to $54.68 (power equipment operators - hazardous waste removal). Your contract may lock an earlier modification.

Scope

Heavy Construction Projects-Hazardous Waste Removal

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ENGI0325-011 · Operating Engineers agreement, October 1, 2011
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D)

$29.04$19.70$48.74Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL)

$28.79$19.70$48.49Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C)

$30.34$19.70$50.04Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A)

$31.29$19.70$50.99Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D)$23.68$19.70$43.38Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL)

$23.43$19.70$43.13Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C)

$24.98$19.70$44.68Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A)$25.92$19.70$45.62Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D)$28.07$19.70$47.77Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL)

$27.82$19.70$47.52Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C)

$29.37$19.70$49.07Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A)$30.32$19.70$50.02Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D)

$31.02$19.70$50.72Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL)

$30.77$19.70$50.47Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C)

$32.23$19.70$51.93Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A)

$33.27$19.70$52.97Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D)

$30.72$19.70$50.42Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL)

$30.47$19.70$50.17Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C)

$31.91$19.70$51.61Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A)

$32.97$19.70$52.67Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, PWER SHOVEL OPERATOR

$32.05$19.70$51.75Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D)

$30.75$19.70$50.45Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL)

$29.88$19.70$49.58Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A)

$33.00$19.70$52.70Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D)$25.55$19.70$45.25Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL)

$25.30$19.70$45.00Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C)

$26.85$19.70$46.55Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A)$27.80$19.70$47.50Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D)$29.78$19.70$49.48Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL)

$29.53$19.70$49.23Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C)

$31.08$19.70$50.78Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A)$32.03$19.70$51.73Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D)

$32.73$19.70$52.43Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL)

$32.48$19.70$52.18Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C)

$34.03$19.70$53.73Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A)

$34.98$19.70$54.68Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D)

$32.43$19.70$52.13Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL)

$32.18$19.70$51.88Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C)

$33.73$19.70$53.43Agreement
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A)

$34.68$19.70$54.38Agreement
LABO0005-006 · Laborers agreement, October 1, 2017
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 28.93 16.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C)

$29.93$16.90$46.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 28.93 16.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 (LEVEL A, B, C)

$29.93$16.90$46.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$31.75$14.90$46.65Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C)$31.75$14.90$46.65Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$28.93$14.20$43.13Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 (LEVELS A, B OR C)

$29.93$14.20$44.13Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$23.20$13.80$37.00Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 (LEVELS A, B OR C)

$24.20$13.80$38.00Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT: class b$18.64$12.90$31.54Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT: class a$17.64$12.90$30.54Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C)

$26.21$16.62$42.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 (LEVELS A, B OR C)

$27.13$14.95$42.08Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6 (LEVELS A, B OR C)

$26.33$12.95$39.28Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8 (LEVELS A, B OR C)

$23.74$12.95$36.69Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 20.80 12.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 (LEVELS A, B OR C)

$21.88$13.26$35.14Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11 (LEVELS A, B OR C)

$25.18$12.90$38.08Agreement
LABO0005-006 · Laborers agreement, October 1, 2020
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 28.93 16.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C)

$29.93$16.90$46.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 28.93 16.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 (LEVEL A, B, C)

$29.93$16.90$46.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$31.75$14.90$46.65Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C)$31.75$14.90$46.65Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$28.93$14.20$43.13Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 (LEVELS A, B OR C)

$29.93$14.20$44.13Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$23.20$13.80$37.00Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 (LEVELS A, B OR C)

$24.20$13.80$38.00Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT: class b$18.64$12.90$31.54Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT: class a$17.64$12.90$30.54Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C)

$26.21$16.62$42.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 (LEVELS A, B OR C)

$27.13$14.95$42.08Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6 (LEVELS A, B OR C)

$26.33$12.95$39.28Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8 (LEVELS A, B OR C)

$23.74$12.95$36.69Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 20.80 12.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 (LEVELS A, B OR C)

$21.88$13.26$35.14Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11 (LEVELS A, B OR C)

$25.18$12.90$38.08Agreement
LABO0005-006 · Laborers agreement, October 1, 2022
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 28.93 16.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, MACOMB AND WAYNE COUNTIES - ZONE 1 (LEVELS A, B OR C)

$29.93$16.90$46.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 28.93 16.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2 (LEVEL A, B, C)

$29.93$16.90$46.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$31.75$14.90$46.65Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT:, MONROE COUNTY - ZONE 4 (LEVELS A, B OR C)$31.75$14.90$46.65Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$28.93$14.20$43.13Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3 (LEVELS A, B OR C)

$29.93$14.20$44.13Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D

$23.20$13.80$37.00Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7 (LEVELS A, B OR C)

$24.20$13.80$38.00Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT: class b$18.64$12.90$31.54Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT: class a$17.64$12.90$30.54Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, SANILAC AND ST. CLAIR COUNTIES - ZONE 5 (LEVELS A, B OR C)

$26.21$16.62$42.83Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4 (LEVELS A, B OR C)

$27.13$14.95$42.08Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6 (LEVELS A, B OR C)

$26.33$12.95$39.28Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8 (LEVELS A, B OR C)

$23.74$12.95$36.69Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 WORK PERFORMED IN CONJUNCTION WITH SITE PREPARATION NOT REQUIRING THE USE OF PERSONAL PROTECTIVE EQUIPMENT; ALSO, LEVEL D.$ 20.80 12.90 LABORERS - HAZARDOUS WASTE ABATEMENT:, ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9 (LEVELS A, B OR C)

$21.88$13.26$35.14Agreement
LABORERS - HAZARDOUS WASTE ABATEMENT…
Full text

LABORERS - HAZARDOUS WASTE ABATEMENT:, ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11 (LEVELS A, B OR C)

$25.18$12.90$38.08Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260158?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator