Prevailing wage rates: Lenawee County, Michigan

Building construction · MI20260131 modification 1, published May 18, 2026

The short answer

This sheet sets 51 classifications for building work in Lenawee County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.84 an hour (laborer: landscape & irrigation) to $82.05 (millwright). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0045-003 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2023
ASBESTOS WORKER/HEAT & FROST INSULATOR…
Full text

ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF BLISSFIELD, CLINTON, DEERFIELD, FAIRFIELD, MACON, OGDEN, PALMYRA, RAISIN, RIDGEWAY, RIGA, & TECUMSEH)

$36.00$20.15$56.15Agreement
ASBE0047-007 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2023
Group definitions, zones and premiums for ASBE0047-007
ASBESTOS WORKER/HEAT & FROST INSULATOR (TOWNSHIPS OF ADRIAN, CAMBRIDGE, DOVER, FRANKLIN, HUDSON, MADISON, MADINA, ROLLIN, ROME, SENECA, & WOODSTOCK).$ 36.62 19.78
BOIL0085-004 · Boilermakers agreement, January 6, 2025
BOILERMAKER$43.50$37.64$81.14Agreement
BRMI0009-005 · Bricklayers agreement, August 1, 2024
TILE SETTER

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$35.83$22.18$58.01Agreement
BRICKLAYER

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER HAS BEEN EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$35.83$22.18$58.01Agreement
CARP1004-021 · Carpenters agreement, June 1, 2025
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION)

$35.41$21.06$56.47Agreement
CARP1102-003 · Carpenters agreement, June 1, 2025
MILLWRIGHT$42.92$39.13$82.05Agreement
ELEC0008-004 · Electrical Workers (IBEW) agreement, May 25, 2024
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING)$48.40$17.79$66.19Agreement
ENGI0324-019 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: GROUP 9 OILER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$35.29$25.35$60.64Agreement
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT & EXTEND-A-BOOM FORKLIFT

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$43.63$25.35$68.98Agreement
POWER EQUIPMENT OPERATOR: GROUP 7 BOBCAT/SKID LOADER; LOADER;PAVER; SCRAPER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$45.34$25.35$70.69Agreement
POWER EQUIPMENT OPERATOR: GROUP 6 REGULAR CRANE OPERATOR

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$46.31$25.35$71.66Agreement
POWER EQUIPMENT OPERATOR: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$47.17$25.35$72.52Agreement
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$47.99$25.35$73.34Agreement
POWER EQUIPMENT OPERATOR: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$48.29$25.35$73.64Agreement
POWER EQUIPMENT OPERATOR: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$49.79$25.35$75.14Agreement
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE

$51.29$25.35$76.64Agreement
IRON0055-004 · Ironworkers agreement, July 1, 2024
IRONWORKER: REINFORCING & STRUCTURAL$35.50$29.20$64.70Agreement
LABO0499-007 · Laborers agreement, June 1, 2025
LABORER (COMMON OR GENERAL…
Full text

LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER)

$32.35$13.45$45.80Agreement
PAIN0022-003 · Painters and Allied Trades agreement, June 1, 2015
PAINTER: SPRAY$26.86$17.66$44.52Agreement
PAINTER: DRYWALL FINISHING/TAPING$32.85$20.41$53.26Agreement
PAINTER: BRUSH AND ROLLER$32.85$20.41$53.26Agreement
PAIN0022-003 · Painters and Allied Trades agreement, June 1, 2022
PAINTER: SPRAY$26.86$17.66$44.52Agreement
PAINTER: DRYWALL FINISHING/TAPING$32.85$20.41$53.26Agreement
PAINTER: BRUSH AND ROLLER$32.85$20.41$53.26Agreement
PLAS0886-007 · Plasterers and Cement Masons agreement, July 1, 2014
PLASTERER$27.41$16.10$43.51Agreement
CEMENT MASON/CONCRETE FINISHER$27.18$18.11$45.29Agreement
PLUM0190-002 · Plumbers and Pipefitters agreement, June 1, 2020
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)$42.26$23.70$65.96Agreement
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION…
Full text

PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$49.43$24.36$73.79Agreement
PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION…
Full text

PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$51.30$25.87$77.17Agreement
PLUM0190-002 · Plumbers and Pipefitters agreement, June 1, 2024
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)$42.26$23.70$65.96Agreement
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION…
Full text

PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$49.43$24.36$73.79Agreement
PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION…
Full text

PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$51.30$25.87$77.17Agreement
PLUM0190-002 · Plumbers and Pipefitters agreement, June 1, 2025
PIPEFITTER: HVAC PIPE INSTALLATION ONLY (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)$42.26$23.70$65.96Agreement
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION…
Full text

PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$49.43$24.36$73.79Agreement
PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION…
Full text

PIPEFITTER: EXCLUDES HVAC PIPE & SYSTEM INSTALLATION (TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$51.30$25.87$77.17Agreement
PLUM0333-009 · Plumbers and Pipefitters agreement, June 1, 2025
PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION…
Full text

PLUMBER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH).$ 46.29 25.43 PIPEFITTER: HVAC PIPE INSTALLATION ONLY (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$46.29$25.43$71.72Agreement
PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION…
Full text

PIPEFITTER: EXCLUDING HVAC PIPE & SYSTEM INSTALLATION (EXCLUDING TOWNSHIPS OF CLINTON, MACON, & TECUMSEH)

$46.29$25.43$71.72Agreement
SFMI0669-003 · SFMI, January 2, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73SFMI
SHEE0033-033 · Sheet Metal Workers agreement, July 1, 2011
SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION)$30.80$21.51$52.31Agreement
SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION)$30.80$21.51$52.31Agreement
SUMI2011-056 · Survey of contractors in MI, February 14, 2011
TRUCK DRIVER: FLATBED TRUCK$16.80$3.97$20.77Survey
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK$15.50$0.00$15.50Survey
ROOFER$15.73$7.41$23.14Survey
OPERATOR: TRACTOR$19.60$7.31$26.91Survey
OPERATOR: ROLLER$28.02$7.07$35.09Survey
OPERATOR: GRADER/BLADE$24.04$6.03$30.07Survey
OPERATOR: BULLDOZER$22.34$1.22$23.56Survey
OPERATOR: BACKHOE/EXCAVATOR$29.04$9.76$38.80Survey
LABORER: LANDSCAPE & IRRIGATION$12.84$0.00$12.84Survey
GLAZIER$16.95$4.74$21.69Survey
FLOOR LAYER: CARPET$19.59$7.57$27.16Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260131?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator