Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Isabella County, Michigan
Building construction · MI20260127 modification 1, published May 18, 2026
The short answer
This sheet sets 86 classifications for building work in Isabella County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.84 an hour (laborer: landscape & irrigation) to $82.05 (millwright). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0047-005 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 | Agreement |
| BOIL0169-002 · Boilermakers agreement, July 1, 2025 | ||||
| BOILERMAKER | $43.50 | $37.64 | $81.14 | Agreement |
| BRMI0009-017 · Bricklayers agreement, August 1, 2024 | ||||
| TILE SETTER | $31.43 | $21.13 | $52.56 | Agreement |
| BRICKLAYER | $35.14 | $24.20 | $59.34 | Agreement |
| CARP0706-021 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | $35.86 | $23.69 | $59.55 | Agreement |
| CARP1102-003 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | Agreement |
| ELEC0275-006 · Electrical Workers (IBEW) agreement, June 1, 2022 | ||||
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING…Full textELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF BLOOMFIELD, COLDWATER, DEERFIELD, FREMONT, GILMORE, NOTTAWA, ROLLAND, & SHERMAN) | $34.41 | $18.90 | $53.31 | Agreement |
| ELEC0557-011 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF COE & LINCOLN) | $40.00 | $29.95 | $69.95 | Agreement |
| ELEC0692-025 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING…Full textELECTRICIAN: EXCLUDES LOW VOLTAGE WIRING (TOWNSHIPS OF CHIPPEWA, DENVER, ISABELLA, UNION, VERNON, & WISE) | $40.00 | $26.52 | $66.52 | Agreement |
| ENGI0324-023 · Operating Engineers agreement, June 1, 2022 | ||||
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | $63.03 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | $65.68 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | $61.28 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | $53.71 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | $63.93 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | $61.28 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | $51.23 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | $51.23 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | $55.46 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | $63.93 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | $59.57 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | $59.57 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | $67.23 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | $51.23 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | $50.98 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | $55.46 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | $63.93 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | $55.46 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | $61.28 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | $63.03 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | $53.71 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | Agreement |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | $65.68 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | $59.57 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | $68.98 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | $67.23 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | $67.23 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | $61.32 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | $65.68 | Agreement |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | $53.71 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 6…Full textOPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $26.13 | $24.85 | $50.98 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 5…Full textOPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $30.61 | $24.85 | $55.46 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 4…Full textOPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $36.47 | $24.85 | $61.32 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 3…Full textOPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $40.83 | $24.85 | $65.68 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 2…Full textOPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $38.18 | $24.85 | $63.03 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 1…Full textOPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $44.13 | $24.85 | $68.98 | Agreement |
| IRON0025-009 · Ironworkers agreement, April 1, 2025 | ||||
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 | Agreement |
| IRON0025-010 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 | Agreement |
| IRONWORKER, REINFORCING | $36.55 | $33.37 | $69.92 | Agreement |
| LABO1098-030 · Laborers agreement, July 1, 2025 | ||||
| LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | Agreement |
| LABORER: MASON TENDER - CEMENT/CONCRETE AND PIPELAYER | $27.68 | $13.45 | $41.13 | Agreement |
| PAIN1803-001 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| PAINTER: DRYWALL FINISHING/TAPING | $30.22 | $22.22 | $52.44 | Agreement |
| PAINTER: BRUSH, ROLLER AND SPRAY | $29.23 | $19.11 | $48.34 | Agreement |
| PLAS0016-039 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| PLASTERER | $26.32 | $12.88 | $39.20 | Agreement |
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 | $37.85 | Agreement |
| PLUM0085-007 · Plumbers and Pipefitters agreement, May 4, 2023 | ||||
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $43.50 | $22.10 | $65.60 | Agreement |
| PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) | $46.00 | $22.99 | $68.99 | Agreement |
| PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $46.00 | $22.99 | $68.99 | Agreement |
| PLUM0085-007 · Plumbers and Pipefitters agreement, May 1, 2025 | ||||
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $43.50 | $22.10 | $65.60 | Agreement |
| PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) | $46.00 | $22.99 | $68.99 | Agreement |
| PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $46.00 | $22.99 | $68.99 | Agreement |
| PLUM0085-007 · Plumbers and Pipefitters agreement, May 4, 2025 | ||||
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $43.50 | $22.10 | $65.60 | Agreement |
| PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) | $46.00 | $22.99 | $68.99 | Agreement |
| PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $46.00 | $22.99 | $68.99 | Agreement |
| SFMI0669-003 · SFMI, January 2, 2025 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI |
| SHEE0007-021 · Sheet Metal Workers agreement, May 1, 2018 | ||||
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 | Agreement |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 | Agreement |
| SUMI2011-052 · Survey of contractors in MI, February 14, 2011 | ||||
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 | Survey |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 | Survey |
| ROOFER | $15.71 | $8.02 | $23.73 | Survey |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | Survey |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | Survey |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | Survey |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR | $24.24 | $3.06 | $27.30 | Survey |
| LABORER: MASON TENDER - BRICK | $15.36 | $3.10 | $18.46 | Survey |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | Survey |
| LABORER: COMMON OR GENERAL | $16.72 | $1.22 | $17.94 | Survey |
| GLAZIER | $16.95 | $4.74 | $21.69 | Survey |
| FLOOR LAYER: CARPET | $19.59 | $7.57 | $27.16 | Survey |
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYING-CARPET | $21.67 | $3.56 | $25.23 | Survey |
| CARPENTER (FORM WORK ONLY) | $23.08 | $1.22 | $24.30 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260127?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator