Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Gogebic County, Michigan
Building construction · MI20260120 modification 1, published May 18, 2026
The short answer
This sheet sets 35 classifications for building work in Gogebic County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $14.32 an hour (carpenter, excludes acoustical ceiling installation) to $81.14 (boilermaker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0049-004 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $53.18 | $22.78 | $75.96 | Agreement |
| BOIL0169-002 · Boilermakers agreement, July 1, 2025 | ||||
| BOILERMAKER | $43.50 | $37.64 | $81.14 | Agreement |
| BRMI0006-001 · Bricklayers agreement, May 1, 2024 | ||||
| TILE SETTER | $32.19 | $24.65 | $56.84 | Agreement |
| BRICKLAYER | $32.19 | $24.65 | $56.84 | Agreement |
| CARP1510-005 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT | $41.00 | $23.43 | $64.43 | Agreement |
| CARP1510-010 · Carpenters agreement, June 1, 2025 | ||||
CARPENTER (ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYER - CARPET) | $34.01 | $23.14 | $57.15 | Agreement |
| ELEC0219-015 · Electrical Workers (IBEW) agreement, June 1, 2019 | ||||
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING (ELECTRICAL CONTRACTS OVER $180,000) | $33.94 | $21.80 | $55.74 | Agreement |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING (ELECTRICAL CONTRACTS OF $180,000 OR LESS) | $31.75 | $21.73 | $53.48 | Agreement |
| ENGI0324-031 · Operating Engineers agreement, May 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: GROUP 3 OILER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $35.86 | $12.50 | $48.36 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: GROUP 2 FORK TRUCK PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $37.26 | $25.00 | $62.26 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1 BACKHOE, BULLDOZER; CRANE, FRONT END LOADER, EXCAVATOR, PAVER, ROLLER, AND SCRAPER (SELF-PROPELLED AND TRACTOR DRAWN) PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $40.51 | $25.00 | $65.51 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.92 | $25.00 | $69.92 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $44.63 | $25.00 | $69.63 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE | $43.81 | $25.00 | $68.81 | Agreement |
| IRON0008-008 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $35.20 | $32.97 | $68.17 | Agreement |
| IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $35.20 | $32.97 | $68.17 | Agreement |
| LABO1329-005 · Laborers agreement, May 1, 2025 | ||||
LABORER (COMMON OR GENERAL…Full textLABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND SANDBLASTER) | $28.18 | $13.45 | $41.63 | Agreement |
| PAIN1011-001 · Painters and Allied Trades agreement, June 2, 2025 | ||||
| PAINTER (INSULATOR FOAM ONLY) | $28.73 | $15.92 | $44.65 | Agreement |
| PAIN1011-006 · Painters and Allied Trades agreement, June 2, 2019 | ||||
| PAINTER: BRUSH, ROLLER, AND SPRAY | $21.52 | $13.33 | $34.85 | Agreement |
| PLAS0016-037 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| CEMENT MASON/CONCRETE FINISHER | $20.17 | $10.13 | $30.30 | Agreement |
| PLUM0111-002 · Plumbers and Pipefitters agreement, May 27, 2024 | ||||
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 34.59 27.53 PIPEFITTER…Full textPLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 34.59 27.53 PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 | Agreement |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 | Agreement |
| PLUM0111-002 · Plumbers and Pipefitters agreement, June 1, 2024 | ||||
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 34.59 27.53 PIPEFITTER…Full textPLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 34.59 27.53 PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 | Agreement |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 | Agreement |
| PLUM0111-002 · Plumbers and Pipefitters agreement, May 27, 2025 | ||||
PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 34.59 27.53 PIPEFITTER…Full textPLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 34.59 27.53 PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $34.59 | $27.53 | $62.12 | Agreement |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | $45.44 | $28.43 | $73.87 | Agreement |
| ROOF0149-014 · Roofers agreement, May 1, 2021 | ||||
| ROOFER | $26.50 | $15.95 | $42.45 | Agreement |
| SHEE0007-006 · Sheet Metal Workers agreement, July 1, 2023 | ||||
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $27.24 | $29.85 | $57.09 | Agreement |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $32.74 | $29.85 | $62.59 | Agreement |
| SUMI2011-045 · Survey of contractors in MI, February 14, 2011 | ||||
| TRUCK DRIVER: FLATBED TRUCK | $17.44 | $4.51 | $21.95 | Survey |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | Survey |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | Survey |
| LABORER: LANDSCAPE & IRRIGATION | $14.95 | $0.00 | $14.95 | Survey |
| GLAZIER | $17.50 | $2.27 | $19.77 | Survey |
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET | $13.00 | $1.32 | $14.32 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260120?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator