Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Gladwin County, Michigan
Building construction · MI20260119 modification 1, published May 18, 2026
The short answer
This sheet sets 79 classifications for building work in Gladwin County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.84 an hour (laborer: landscape & irrigation) to $82.05 (millwright). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification. Of the 41 rates we can follow line by line from the first publication to today, 1 is higher and 2 are lower.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
May 18, 2026 · modification 1
Classification names reworded; 1 rate raised, 2 rates lowered, 1 fringe formula changed among the 41 lines we could match
- Operator: 1 raised and 2 lowered, by between $0.25 and $2.65 an hour
- Electrician: 1 fringe formula changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (4)
| Classification | Was | Now | Change |
|---|---|---|---|
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $40.00 + 40.85%+10.18 | $40.00 + $26.52 | changed |
| OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR L… | $26.38 + $24.85 | $26.13 + $24.85 | −$0.25 (−0.5%) |
| OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRAN… | $38.18 + $24.85 | $40.83 + $24.85 | +$2.65 (+4.2%) |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER;… | $40.83 + $24.85 | $38.18 + $24.85 | −$2.65 (−4.0%) |
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| BOIL0169-002 · Boilermakers agreement, July 1, 2025 | |||||
| BOILERMAKER | $43.50 | $37.64 | $81.14 | no change | Agreement, 2025 |
| BRMI0009-018 · Bricklayers agreement, August 1, 2024 | |||||
| TILE SETTER | $31.43 | $21.13 | $52.56 | no change | Agreement, 2024 |
| PLASTERER | $33.09 | $26.58 | $59.67 | no change | Agreement, 2024 |
| BRICKLAYER | $35.14 | $24.20 | $59.34 | no change | Agreement, 2024 |
| CARP0706-008 · Carpenters agreement, June 1, 2025 | |||||
CARPENTER (ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $35.86 | $23.69 | $59.55 | no change | Agreement, 2025 |
| CARP0706-011 · Carpenters agreement, June 1, 2025 | |||||
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET) | $35.86 | $23.69 | $59.55 | no change | Agreement, 2025 |
| CARP1102-003 · Carpenters agreement, June 1, 2025 | |||||
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | no change | Agreement, 2025 |
| ELEC0692-006 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $40.00 | $26.52 | $66.52 | changed | Agreement, 2025 |
| ENGI0324-023 · Operating Engineers agreement, June 1, 2022 | |||||
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D) | $38.18 | $24.85 | $63.03 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $40.83 | $24.85 | $65.68 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL B AND C) | $36.43 | $24.85 | $61.28 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 2: LEVEL A) | $28.86 | $24.85 | $53.71 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D) | $39.08 | $24.85 | $63.93 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $36.43 | $24.85 | $61.28 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 2 (AREA 2: LEVEL A) | $26.38 | $24.85 | $51.23 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D) | $26.38 | $24.85 | $51.23 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL B AND C) | $30.61 | $24.85 | $55.46 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL A) | $39.08 | $24.85 | $63.93 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D) | $34.72 | $24.85 | $59.57 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL A) | $34.72 | $24.85 | $59.57 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2: LEVEL A) | $42.38 | $24.85 | $67.23 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D) | $26.38 | $24.85 | $51.23 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $26.13 | $24.85 | $50.98 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: REGULAR CRANE OPERATOR, MECHANIC, DRAGLINE OPERATOR, BOOM TRUCK OPERATOR AND CONCRETE PUMP WITH BOOM OPERATOR, POWER SHOVEL OPERATOR (AREA 1: LEVEL A) | $30.61 | $24.85 | $55.46 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D) | $39.08 | $24.85 | $63.93 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $30.61 | $24.85 | $55.46 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL B AND C) | $36.47 | $24.85 | $61.32 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 2 (AREA 1: LEVEL A) | $36.43 | $24.85 | $61.28 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D) | $38.18 | $24.85 | $63.03 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $28.86 | $24.85 | $53.71 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL B AND C) | $44.13 | $24.85 | $68.98 | — | Agreement, 2022 |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: GROUP 1 (AREA 1: LEVEL A) | $40.83 | $24.85 | $65.68 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D) | $34.72 | $24.85 | $59.57 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $44.13 | $24.85 | $68.98 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL B AND C) | $26.13 | $24.85 | $50.98 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 1: LEVEL A) | $42.38 | $24.85 | $67.23 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D) | $42.38 | $24.85 | $67.23 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL D WHEN CAPPING LANDFILL) | $36.47 | $24.85 | $61.32 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL B AND C) | $40.83 | $24.85 | $65.68 | — | Agreement, 2022 |
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 1: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 1: LEVEL A) | $28.86 | $24.85 | $53.71 | — | Agreement, 2022 |
OPERATOR: POWER EQUIPMENT: GROUP 6…Full textOPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $26.13 | $24.85 | $50.98 | −$0.25 (−0.5%) | Agreement, 2022 |
OPERATOR: POWER EQUIPMENT: GROUP 5…Full textOPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $30.61 | $24.85 | $55.46 | no change | Agreement, 2022 |
OPERATOR: POWER EQUIPMENT: GROUP 4…Full textOPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $36.47 | $24.85 | $61.32 | no change | Agreement, 2022 |
OPERATOR: POWER EQUIPMENT: GROUP 3…Full textOPERATOR: POWER EQUIPMENT: GROUP 3 CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $40.83 | $24.85 | $65.68 | +$2.65 (+4.2%) | Agreement, 2022 |
OPERATOR: POWER EQUIPMENT: GROUP 2…Full textOPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER; TOWER CRANE; GANTRY CRANE AND WHIRLEY DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $38.18 | $24.85 | $63.03 | −$2.65 (−4.0%) | Agreement, 2022 |
OPERATOR: POWER EQUIPMENT: GROUP 1…Full textOPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. | $44.13 | $24.85 | $68.98 | no change | Agreement, 2022 |
| IRON0025-009 · Ironworkers agreement, April 1, 2025 | |||||
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 | no change | Agreement, 2025 |
| IRON0025-010 · Ironworkers agreement, June 1, 2025 | |||||
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 | no change | Agreement, 2025 |
| IRONWORKER, REINFORCING | $36.55 | $33.37 | $69.92 | no change | Agreement, 2025 |
| LABO1098-029 · Laborers agreement, July 1, 2025 | |||||
| LABORER: SANDBLASTER | $28.21 | $13.45 | $41.66 | no change | Agreement, 2025 |
| LABORER (MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; AND PIPELAYER) | $27.68 | $13.45 | $41.13 | no change | Agreement, 2025 |
| PAIN1803-001 · Painters and Allied Trades agreement, June 1, 2025 | |||||
| PAINTER: DRYWALL FINISHING/TAPING | $30.22 | $22.22 | $52.44 | no change | Agreement, 2025 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $29.23 | $19.11 | $48.34 | no change | Agreement, 2025 |
| PLAS0016-038 · Plasterers and Cement Masons agreement, April 1, 2014 | |||||
| CEMENT MASON/CONCRETE FINISHER | $25.47 | $12.38 | $37.85 | no change | Agreement, 2014 |
| PLUM0085-004 · Plumbers and Pipefitters agreement, May 4, 2023 | |||||
| PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) | $43.50 | $22.10 | $65.60 | no change | Agreement, 2023 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.50 | $21.75 | $67.25 | no change | Agreement, 2023 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $45.50 | $21.75 | $67.25 | no change | Agreement, 2023 |
| PLUM0085-004 · Plumbers and Pipefitters agreement, May 1, 2024 | |||||
| PLUMBER (EXCLUDING HVAC PIPE AND SYSTEM INSTALLATION) | $43.50 | $22.10 | $65.60 | — | Agreement, 2024 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.50 | $21.75 | $67.25 | — | Agreement, 2024 |
| PIPEFITTER (EXCLUDES HVAC PIPE AND SYSTEM INSTALLATION) | $45.50 | $21.75 | $67.25 | — | Agreement, 2024 |
| SHEE0007-021 · Sheet Metal Workers agreement, May 1, 2018 | |||||
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 | no change | Agreement, 2018 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $26.83 | $23.78 | $50.61 | no change | Agreement, 2018 |
| SUMI2011-044 · Survey of contractors in MI, February 14, 2011 | |||||
| TRUCK DRIVER: FLATBED TRUCK | $16.80 | $3.97 | $20.77 | no change | Survey, 2011 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $15.65 | $3.12 | $18.77 | no change | Survey, 2011 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $19.36 | $4.53 | $23.89 | no change | Survey, 2011 |
| ROOFER | $15.73 | $7.41 | $23.14 | no change | Survey, 2011 |
| OPERATOR: TRACTOR | $19.60 | $7.31 | $26.91 | no change | Survey, 2011 |
| OPERATOR: ROLLER | $28.02 | $7.07 | $35.09 | no change | Survey, 2011 |
| OPERATOR: GRADER/BLADE | $24.04 | $6.03 | $30.07 | no change | Survey, 2011 |
| OPERATOR: BULLDOZER | $22.34 | $1.22 | $23.56 | no change | Survey, 2011 |
| OPERATOR: BACKHOE/EXCAVATOR | $19.00 | $1.22 | $20.22 | no change | Survey, 2011 |
| LABORER: LANDSCAPE & IRRIGATION | $12.84 | $0.00 | $12.84 | no change | Survey, 2011 |
| LABORER: COMMON OR GENERAL | $11.75 | $1.22 | $12.97 | no change | Survey, 2011 |
| GLAZIER | $16.95 | $4.74 | $21.69 | no change | Survey, 2011 |
| CARPENTER (FLOOR LAYING-CARPET ONLY) | $19.59 | $7.57 | $27.16 | no change | Survey, 2011 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $19.82 | $7.31 | $27.13 | no change | Survey, 2011 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260119?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and MI20260119 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 79 classifications in 16 rate groups
- 15 from agreements, 1 from surveys
- Counties: Gladwin