Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Livingston County, Michigan
Building construction · MI20260090 modification 2, published August 13, 2026
The short answer
This sheet sets 63 classifications for building work in Livingston County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $14.75 an hour (truck driver: tractor haul truck) to $103.89 (elevator mechanic). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0047-002 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 | Agreement |
| BOIL0169-001 · Boilermakers agreement, July 1, 2025 | ||||
| BOILERMAKER | $43.50 | $36.74 | $80.24 | Agreement |
| BRMI0009-004 · Bricklayers agreement, August 1, 2024 | ||||
| BRICKLAYER (TOWNSHIPS OF CONWAY, HANDY, IOSCO & UNADILLA) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $36.10 | $26.22 | $62.32 | Agreement |
| TILE FINISHER (TOWNSHIPS OF CONWAY, HANDY, IOSCO & UNADILLA) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $33.50 | $23.52 | $57.02 | Agreement |
| TILE SETTER (TOWNSHIPS OF CONWAY, HANDY, IOSCO & UNADILLA) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $40.53 | $23.62 | $64.15 | Agreement |
| BRMI0009-020 · Bricklayers agreement, June 1, 2024 | ||||
TILE FINISHER (TOWNSHIPS OF BRIGHTON…Full textTILE FINISHER (TOWNSHIPS OF BRIGHTON, COHOCTAH, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, HOWELL, MARION, OSCEOLA, PUTNAM & TYRONE) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $33.50 | $23.52 | $57.02 | Agreement |
TILE SETTER (TOWNSHIPS OF BRIGHTON…Full textTILE SETTER (TOWNSHIPS OF BRIGHTON, COHOCTAH, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, HOWELL, MARION, OSCEOLA, PUTNAM & TYRONE) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $40.53 | $23.62 | $64.15 | Agreement |
| BRMI0009-020 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER (TOWNSHIPS OF BRIGHTON…Full textBRICKLAYER (TOWNSHIPS OF BRIGHTON, COHOCTAH, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, HOWELL, MARION, OSCEOLA, PUTNAM & TYRONE) FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR | $40.71 | $28.21 | $68.92 | Agreement |
| CARP0687-002 · Carpenters agreement, June 1, 2025 | ||||
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING (REMAINDER OF COUNTY) | $42.44 | $31.43 | $73.87 | Agreement |
| CARP1004-003 · Carpenters agreement, June 1, 2025 | ||||
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $36.21 | $21.06 | $57.27 | Agreement |
| CARP1004-006 · Carpenters agreement, June 1, 2025 | ||||
CARPENTER: FLOOR LAYER - CARPET…Full textCARPENTER: FLOOR LAYER - CARPET, RESILIENT & VINYL FLOORING (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $36.21 | $21.06 | $57.27 | Agreement |
| CARP1045-002 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER: FLOOR LAYER - CARPET, RESILIENT, & VINYL FLOORING (REMAINDER OF COUNTY) | $36.76 | $21.11 | $57.87 | Agreement |
| CARP1102-002 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT | $42.92 | $39.13 | $82.05 | Agreement |
| ELEC0058-003 · Electrical Workers (IBEW) agreement, July 2, 2020 | ||||
ELECTRICIAN: LOW VOLTAGE WIRING & ALARM INSTALLATION…Full textELECTRICIAN: LOW VOLTAGE WIRING & ALARM INSTALLATION (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, HARTLAND, OCEOLA & TYRONE) | $36.89 | $14.16 | $51.05 | Agreement |
| ELEC0252-002 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING…Full textELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF GREEN OAK, HAMBURG, PUTNAM AND UNADILLA) | $38.79 | $19.87 | $58.66 | Agreement |
| ELEC0665-008 · Electrical Workers (IBEW) agreement, May 31, 2022 | ||||
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING…Full textELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO AND MARION) | $31.20 | $10.97 | $42.17 | Agreement |
| ELEV0085-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $65.45 | $38.44 | $103.89 | Agreement |
| ENGI0324-011 · Operating Engineers agreement, June 1, 2023 | ||||
OPERATOR: POWER EQUIPMENT: GROUP 1…Full textOPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 2…Full textOPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 3…Full textOPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CONCRETE PUMP; CRANE; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRACTOR; TRENCHER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.28 | $25.25 | $66.53 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 4…Full textOPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | Agreement |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | Agreement |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | Agreement |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | Agreement |
| IRON0025-019 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | Agreement |
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | Agreement |
| IRON0025-023 · Ironworkers agreement, April 1, 2025 | ||||
| IRONWORKER STRUCTURAL (METAL BUILDING ERECTION ONLY) (EAST OF BURKHARDT ROAD) | $30.02 | $27.43 | $57.45 | Agreement |
| IRONWORKER STRUCTURAL (METAL BUILDING ERECTION ONLY) (WEST OF BURKHARDT ROAD) | $30.02 | $27.43 | $57.45 | Agreement |
| LABO0259-002 · Laborers agreement, August 1, 2025 | ||||
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | Agreement |
| LABO0334-005 · Laborers agreement, June 1, 2025 | ||||
LABORER: LANDSCAPE & IRRIGATION: GROUP 1…Full textLABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | Agreement |
LABORER: LANDSCAPE & IRRIGATION: GROUP 2…Full textLABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | Agreement |
| LABO0499-001 · Laborers agreement, August 1, 2025 | ||||
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.11 | $15.45 | $53.56 | Agreement |
LABORER: MASON TENDER - BRICK…Full textLABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.33 | $15.45 | $53.78 | Agreement |
LABORER: PIPELAYER…Full textLABORER: PIPELAYER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.47 | $15.45 | $53.92 | Agreement |
| LABO0499-010 · Laborers agreement, June 1, 2025 | ||||
LABORER: GRADE CHECKER…Full textLABORER: GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (WEST OF OAK GROVE ROAD TO WEST OF PINKNEY ROAD AND DEXTER PINKNEY ROAD, INCLUDING THE CITY OF HOWELL) | $32.53 | $13.45 | $45.98 | Agreement |
| LABO1076-001 · Laborers agreement, June 1, 2025 | ||||
LABORER: GRADE CHECKER…Full textLABORER: GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE; PIPELAYER; SANDBLASTER (EAST OF OAK GROVE RD. & NORTH OF M-59 (DOES NOT INCLUDE THE CITY OF HOWELL)) | $38.00 | $18.25 | $56.25 | Agreement |
| PAIN0022-001 · Painters and Allied Trades agreement, June 1, 2015 | ||||
PAINTER: SPRAY (EAST OF THE CITY LIMITS OF HOWELL DIRECTLY NORTH TO THE GENESSEE COUNTY…Full textPAINTER: SPRAY (EAST OF THE CITY LIMITS OF HOWELL DIRECTLY NORTH TO THE GENESSEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE:) | $26.86 | $17.66 | $44.52 | Agreement |
| PAIN0022-001 · Painters and Allied Trades agreement, June 1, 2022 | ||||
PAINTER: BRUSH AND ROLLER…Full textPAINTER: BRUSH AND ROLLER (EAST OF THE CITY LIMITS OF HOWELL DIRECTLY NORTH TO THE GENESSEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE:) | $32.85 | $20.41 | $53.26 | Agreement |
PAINTER: DRYWALL FINISHING/TAPING…Full textPAINTER: DRYWALL FINISHING/TAPING (EAST OF THE CITY LIMITS OF HOWELL DIRECTLY NORTH TO THE GENESSEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE:) | $32.85 | $20.41 | $53.26 | Agreement |
| PAIN0357-001 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| GLAZIER (EASTERN HALF INCLUDING THE CITY OF HOWELL) PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | $42.00 | $25.55 | $67.55 | Agreement |
| PAIN0826-003 · Painters and Allied Trades agreement, June 1, 2025 | ||||
Group definitions, zones and premiums for PAIN0826-003GLAZIER (WESTERN HALF INCLUDING THE CITY OF HOWELL).$ 37.41 18.99 | ||||
| PAIN0845-004 · Painters and Allied Trades agreement, June 1, 2025 | ||||
PAINTER: BRUSH, ROLLER AND SPRAY…Full textPAINTER: BRUSH, ROLLER AND SPRAY (WEST OF THE EASTERN CITY LIMITS OF HOWELL, INCLUDING THE CITY OF HOWELL, NORTH TO THE GENESEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE) | $28.75 | $18.68 | $47.43 | Agreement |
PAINTER: DRYWALL FINISHING/TAPING…Full textPAINTER: DRYWALL FINISHING/TAPING (WEST OF THE EASTERN CITY LIMITS OF HOWELL, INCLUDING THE CITY OF HOWELL, NORTH TO THE GENESEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE) | $28.32 | $16.88 | $45.20 | Agreement |
| PLAS0016-002 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| PLASTERER (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY & HOWELL) | $25.39 | $12.53 | $37.92 | Agreement |
| PLAS0016-004 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| PLASTERER (TOWNSHIPS OF DEERFIELD, HARTLAND, OCEOLA & TYRONE) | $23.73 | $12.88 | $36.61 | Agreement |
| PLAS0016-010 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL AND THE ENTIRE CITY OF HOWELL) | $24.64 | $12.88 | $37.52 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (TOWNSHIPS OF DEERFIELD, HARTLAND, OSCEOLA AND TYRONE:) | $25.58 | $12.88 | $38.46 | Agreement |
| PLAS0067-003 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
PLASTERER (EXCLUDING TOWNSHIPS OF COHOCTAH…Full textPLASTERER (EXCLUDING TOWNSHIPS OF COHOCTAH, CONWAY, DEERFIELD, HANDY, HARTLAND, HOWELL, OSCEOLA & TYRONE) | $30.63 | $14.07 | $44.70 | Agreement |
| PLAS0514-008 · Plasterers and Cement Masons agreement, June 1, 2023 | ||||
| CEMENT MASON/CONCRETE FINISHER (REMAINDER OF COUNTY) | $32.23 | $22.11 | $54.34 | Agreement |
| PLUM0098-003 · Plumbers and Pipefitters agreement, June 1, 2026 | ||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIP OF BRIGHTON) | $45.34 | $37.21 | $82.55 | Agreement |
| PLUM0190-001 · Plumbers and Pipefitters agreement, June 1, 2026 | ||||
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF GREEN OAK & HAMBURG) | $53.15 | $26.07 | $79.22 | Agreement |
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIPS OF GREEN OAK & HAMBURG) | $53.15 | $26.07 | $79.22 | Agreement |
| PLUM0333-001 · Plumbers and Pipefitters agreement, June 1, 2026 | ||||
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.56 | $26.23 | $72.79 | Agreement |
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING | $46.56 | $26.23 | $72.79 | Agreement |
| PLUM0636-004 · Plumbers and Pipefitters agreement, May 4, 2026 | ||||
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION; INCLUDING HVAC SYSTEM INSTALLATION (TOWNSHIP OF BRIGHTON) | $45.96 | $43.90 | $89.86 | Agreement |
| ROOF0070-001 · Roofers agreement, May 8, 2025 | ||||
| ROOFER | $42.67 | $21.62 | $64.29 | Agreement |
| SFMI0669-001 · SFMI, January 1, 2025 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI |
| SHEE0007-004 · Sheet Metal Workers agreement, May 1, 2024 | ||||
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | Agreement |
| SHEE0007-007 · Sheet Metal Workers agreement, May 1, 2024 | ||||
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL…Full textPOWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | Agreement |
| SUMI2011-015 · Survey of contractors in MI, February 1, 2011 | ||||
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS | $28.14 | $8.89 | $37.03 | Survey |
| INSTALLER - OVERHEAD DOOR | $27.98 | $0.00 | $27.98 | Survey |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 | Survey |
| LABORER: COMMON OR GENERAL | $17.64 | $4.95 | $22.59 | Survey |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | August 13, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260090?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator