Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Kalamazoo County, Michigan
Building construction · MI20260087 modification 1, published May 18, 2026
The short answer
This sheet sets 38 classifications for building work in Kalamazoo County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.88 an hour (laborer: landscape & irrigation) to $80.24 (boilermaker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0047-002 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $40.00 | $23.65 | $63.65 | Agreement |
| BOIL0169-001 · Boilermakers agreement, July 1, 2025 | ||||
| BOILERMAKER | $43.50 | $36.74 | $80.24 | Agreement |
| BRMI0009-031 · Bricklayers agreement, August 1, 2024 | ||||
| TILE SETTER | $27.35 | $22.20 | $49.55 | Agreement |
| TILE FINISHER | $26.24 | $21.13 | $47.37 | Agreement |
| BRICKLAYER | $35.21 | $24.26 | $59.47 | Agreement |
| CARP0525-013 · Carpenters agreement, June 1, 2023 | ||||
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDER) | $28.29 | $21.42 | $49.71 | Agreement |
| CARP1102-001 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT | $40.04 | $26.47 | $66.51 | Agreement |
| ELEC0131-001 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $42.78 | $21.84 | $64.62 | Agreement |
| ENGI0324-002 · Operating Engineers agreement, June 1, 2024 | ||||
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $31.23 | $25.25 | $56.48 | Agreement |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.37 | $25.25 | $58.62 | Agreement |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 4…Full textOPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 3…Full textOPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.25 | $25.25 | $67.50 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 2…Full textOPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.93 | $25.25 | $69.18 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 1…Full textOPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.28 | $25.25 | $72.53 | Agreement |
| IRON0025-005 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: STRUCTURAL | $36.55 | $29.51 | $66.06 | Agreement |
| IRONWORKER: REINFORCING | $36.55 | $29.51 | $66.06 | Agreement |
| LABO0355-022 · Laborers agreement, June 1, 2025 | ||||
LABORER (COMMON OR GENERAL…Full textLABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | $27.21 | $13.45 | $40.66 | Agreement |
| PAIN0845-013 · Painters and Allied Trades agreement, June 1, 2024 | ||||
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 | Agreement |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 | Agreement |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 | Agreement |
| PAIN0845-013 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| PAINTER: SPRAY | $27.07 | $16.56 | $43.63 | Agreement |
| PAINTER: DRYWALL FINISHING/TAPING | $27.32 | $16.72 | $44.04 | Agreement |
| PAINTER: BRUSH AND ROLLER | $27.07 | $16.46 | $43.53 | Agreement |
| PLAS0016-003 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| CEMENT MASON/CONCRETE FINISHER | $22.31 | $12.83 | $35.14 | Agreement |
| PLUM0357-001 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (EXCLUDING FORT CUSTER) | $32.50 | $24.97 | $57.47 | Agreement |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (EXCLUDING FORT CUSTER) | $32.50 | $24.97 | $57.47 | Agreement |
| ROOF0070-002 · Roofers agreement, June 1, 2025 | ||||
| ROOFER | $33.98 | $18.51 | $52.49 | Agreement |
| SFMI0669-001 · SFMI, January 1, 2025 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $41.34 | $27.39 | $68.73 | SFMI |
| SHEE0007-010 · Sheet Metal Workers agreement, May 1, 2024 | ||||
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $42.74 | $21.53 | $64.27 | Agreement |
| SUMI2011-012 · Survey of contractors in MI, February 1, 2011 | ||||
| TRUCK DRIVER: TRACTOR HAUL TRUCK | $13.57 | $1.18 | $14.75 | Survey |
| TRUCK DRIVER: LOWBOY TRUCK | $14.50 | $0.44 | $14.94 | Survey |
| TRUCK DRIVER: DUMP TRUCK | $17.26 | $11.42 | $28.68 | Survey |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $23.59 | $5.66 | $29.25 | Survey |
| OPERATOR: TRACTOR | $19.10 | $8.48 | $27.58 | Survey |
| OPERATOR: BULLDOZER | $19.68 | $6.64 | $26.32 | Survey |
| LABORER: LANDSCAPE & IRRIGATION | $10.38 | $0.50 | $10.88 | Survey |
| IRONWORKER, ORNAMENTAL | $18.48 | $7.93 | $26.41 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260087?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator