CertifiedHours

Prevailing wage rates · Michigan · Wage determination

Prevailing wage rates: Eaton County, Michigan

Building construction · MI20260082 modification 1, published May 18, 2026

The short answer

This sheet sets 44 classifications for building work in Eaton County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.88 an hour (laborer: landscape & irrigation) to $82.05 (millwright). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0047-002 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR$40.00$23.65$63.65Agreement
BOIL0169-001 · Boilermakers agreement, July 1, 2025
BOILERMAKER$43.50$36.74$80.24Agreement
BRMI0009-009 · Bricklayers agreement, August 1, 2024
BRICKLAYER: TERRAZZO AND TILE SETTER

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$32.20$23.46$55.66Agreement
BRICKLAYER: TERRAZZO AND TILE FINISHER

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$32.20$20.74$52.94Agreement
BRICKLAYER: BRICKLAYER

FOOTNOTE: PAID HOLIDAY: FOURTH OF JULY, IF THE WORKER WAS EMPLOYED BY THE CONTRACTOR IN ANY PERIOD OF SEVEN WORKING DAYS BEFORE SAID HOLIDAY WITHIN THE CURRENT CALENDAR YEAR

$36.10$26.22$62.32Agreement
CARP0525-012 · Carpenters agreement, June 1, 2023
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON)

$28.29$21.42$49.71Agreement
CARP0525-016 · Carpenters agreement, June 1, 2023
CARPENTER: SOFT FLOOR LAYER…
Full text

CARPENTER: SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON)

$28.29$21.42$49.71Agreement
CARP1004-005 · Carpenters agreement, June 1, 2025
CARPENTER: SOFT FLOOR LAYER, INCLUDING CARPET & RESILIENT FLOORING (REMAINDER OF COUNTY)$36.21$21.06$57.27Agreement
CARP1004-020 · Carpenters agreement, June 1, 2025
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK & METAL STUD INSTALLATION (REMAINDER OF COUNTY)

$36.21$21.06$57.27Agreement
CARP1102-002 · Carpenters agreement, June 1, 2025
MILLWRIGHT$42.92$39.13$82.05Agreement
ELEC0445-003 · Electrical Workers (IBEW) agreement, June 1, 2021
ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING…
Full text

ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON)

$34.30$22.16$56.46Agreement
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING…
Full text

ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON)

$34.30$22.16$56.46Agreement
ELEC0665-003 · Electrical Workers (IBEW) agreement, May 31, 2024
ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING…
Full text

ELECTRICIAN: EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR)

$42.98$29.75$72.73Agreement
ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING…
Full text

ELECTRICIAN: ALARM INSTALLATION & LOW VOLTAGE WIRING (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR)

$30.43$10.92$41.35Agreement
ENGI0324-010 · Operating Engineers agreement, June 1, 2024
OPERATOR: POWER EQUIPMENT: GROUP 7 OILER

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.23$25.25$56.48Agreement
OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$33.71$25.25$58.96Agreement
OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK (NON-SWINGING)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.57$25.25$64.82Agreement
OPERATOR: POWER EQUIPMENT: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.57$25.25$64.82Agreement
OPERATOR: POWER EQUIPMENT: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT: GROUP 3 CONCRETE PUMP; CRANE; HIGHLIFT; HOIST; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.28$25.25$66.53Agreement
OPERATOR: POWER EQUIPMENT: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$43.93$25.25$69.18Agreement
OPERATOR: POWER EQUIPMENT: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$47.28$25.25$72.53Agreement
IRON0025-012 · Ironworkers agreement, June 1, 2025
IRONWORKER: STRUCTURAL (EXCLUDING METAL BUILDING ERECTION)$36.55$29.51$66.06Agreement
IRONWORKER: REINFORCING$36.55$29.51$66.06Agreement
LABO0499-013 · Laborers agreement, June 1, 2025
LABORER (COMMON OR GENERAL…
Full text

LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; SANDBLASTER)

$32.53$13.45$45.98Agreement
PAIN0845-005 · Painters and Allied Trades agreement, June 1, 2025
PAINTER: DRYWALL FINISHING/TAPING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET)$28.75$18.68$47.43Agreement
PAINTER: BRUSH, ROLLER…
Full text

PAINTER: BRUSH, ROLLER, SPRAY AND PAPERHANGING (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET)

$28.75$18.68$47.43Agreement
PLAS0016-011 · Plasterers and Cement Masons agreement, April 1, 2014
CEMENT MASON/CONCRETE FINISHER$24.64$12.88$37.52Agreement
PLUM0333-006 · Plumbers and Pipefitters agreement, June 1, 2025
PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION

FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING

$46.29$25.43$71.72Agreement
PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION

FOOTNOTE: PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY AND LABOR DAY, IF THE EMPLOYEE WORKS THE WORK DAY PRECEDING AND FOLLOWING THE HOLIDAY UNLESS PROVEN ILLNESS OR INJURY PREVENTS THE EMPLOYEE FROM WORKING

$46.29$25.43$71.72Agreement
SFMI0669-001 · SFMI, January 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$41.34$27.39$68.73SFMI
SHEE0007-004 · Sheet Metal Workers agreement, May 1, 2024
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: GROUP 1 (AREA 2: LEVEL D WHEN CAPPING LANDFILL)

$42.74$21.53$64.27Agreement
SUMI2011-007 · Survey of contractors in MI, February 1, 2011
TRUCK DRIVER: TRACTOR HAUL TRUCK$13.57$1.18$14.75Survey
TRUCK DRIVER: LOWBOY TRUCK$14.50$0.44$14.94Survey
TRUCK DRIVER: DUMP TRUCK$16.00$7.26$23.26Survey
ROOFER$15.00$0.58$15.58Survey
OPERATOR: LOADER$19.75$9.98$29.73Survey
OPERATOR: TRACTOR$19.10$8.48$27.58Survey
OPERATOR: GRADER/BLADE$22.00$6.29$28.29Survey
OPERATOR: BULLDOZER$19.73$7.02$26.75Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.94$8.72$30.66Survey
METAL BUILDING ERECTOR$16.92$6.32$23.24Survey
LABORER: MASON TENDER - BRICK$16.75$4.75$21.50Survey
LABORER: LANDSCAPE & IRRIGATION$10.38$0.50$10.88Survey
IRONWORKER, ORNAMENTAL$18.48$7.93$26.41Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260082?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator