CertifiedHours

Prevailing wage rates · Michigan · Wage determination

Prevailing wage rates: St Clair County, Michigan

Heavy construction · MI20260072 modification 1, published May 18, 2026

The short answer

This sheet sets 39 classifications for heavy work in St Clair County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $24.51 an hour (truck driver: off the road truck) to $86.17 (line construction: linemen/cable splicer). Your contract may lock an earlier modification.

Scope

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
BOIL0169-003 · Boilermakers agreement, July 1, 2025
BOILERMAKER$43.50$36.74$80.24Agreement
CARP0687-008 · Carpenters agreement, June 1, 2024
PILEDRIVERMAN$38.48$30.22$68.70Agreement
CARPENTER, INCLUDES FORM WORK$42.44$31.43$73.87Agreement
CARP0687-008 · Carpenters agreement, June 1, 2025
PILEDRIVERMAN$38.48$30.22$68.70Agreement
CARPENTER, INCLUDES FORM WORK$42.44$31.43$73.87Agreement
ELEC0017-003 · Electrical Workers (IBEW) agreement, June 1, 2025
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER$61.06$25.11$86.17Agreement
ELEC0058-007 · Electrical Workers (IBEW) agreement, June 28, 2024
ELECTRICIAN$51.32$28.54$79.86Agreement
ENGI0325-019 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER

$39.95$25.25$65.20Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)

$40.52$25.25$65.77Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)

$41.25$25.25$66.50Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)

$45.98$25.25$71.23Agreement
ENGI0326-008 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$35.29$25.35$60.64Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$43.63$25.35$68.98Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$45.34$25.35$70.69Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$46.31$25.35$71.66Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$47.17$25.35$72.52Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$47.99$25.35$73.34Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$48.29$25.35$73.64Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$49.79$25.35$75.14Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER

FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM

$51.29$25.35$76.64Agreement
IRON0025-006 · Ironworkers agreement, June 1, 2025
IRONWORKER: STRUCTURAL$36.55$35.93$72.48Agreement
IRONWORKER: REINFORCING$36.55$33.37$69.92Agreement
LABO0334-009 · Laborers agreement, June 1, 2025
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2…
Full text

LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER

$27.71$9.10$36.81Agreement
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1…
Full text

LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT)

$29.93$9.10$39.03Agreement
LABO0334-015 · Laborers agreement, September 1, 2022
LABORER ((7) LANDSCAPE)$18.29$12.85$31.14Agreement
LABORER ((5) PIPELAYER)$23.84$13.52$37.36Agreement
LABORER ((4) GRADE CHECKER)$23.70$13.15$36.85Agreement
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$23.53$13.15$36.68Agreement
LABORER ((1) COMMON OR GENERAL)$23.39$13.15$36.54Agreement
LABO1075-005 · Laborers agreement, June 1, 2024
LABORER: COMMON OR GENERAL…
Full text

LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION)

$30.35$17.90$48.25Agreement
PAIN1474-003 · Painters and Allied Trades agreement, June 1, 2010
PAINTER: SPRAY$24.79$12.02$36.81Agreement
PAINTER: BRUSH & ROLLER$23.79$12.02$35.81Agreement
PLAS0514-005 · Plasterers and Cement Masons agreement, June 1, 2023
CEMENT MASON/CONCRETE FINISHER$32.23$22.11$54.34Agreement
PLUM0098-005 · Plumbers and Pipefitters agreement, June 1, 2019
PLUMBER$35.77$35.13$70.90Agreement
PLUM0636-002 · Plumbers and Pipefitters agreement, June 5, 2017
PIPEFITTER$40.41$29.35$69.76Agreement
SUMI2010-070 · Survey of contractors in MI, November 9, 2010
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69$24.51Survey
TEAM0007-008 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30Agreement
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER$33.40$0.75$34.15Agreement
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.30$0.75$34.05Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260072?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator