Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Livingston County, Michigan
Heavy construction · MI20260064 modification 1, published May 18, 2026
The short answer
This sheet sets 54 classifications for heavy work in Livingston County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $23.00 an hour (operator: bulldozer) to $86.57 (electrician (townships of green oak, hamburg, putnam and unadilla)). Your contract may lock an earlier modification.
Scope
Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0169-003 · Boilermakers agreement, July 1, 2025 | ||||
| BOILERMAKER | $43.50 | $36.74 | $80.24 | Agreement |
| CARP0687-005 · Carpenters agreement, June 1, 2024 | ||||
PILEDRIVERMAN (TOWNSHIPS OF BRIGHTON…Full textPILEDRIVERMAN (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, OSCEOLA, PUTNAM, TYRONE & UNADILLA) | $38.48 | $30.22 | $68.70 | Agreement |
CARPENTER, INCLUDES FORM WORK…Full textCARPENTER, INCLUDES FORM WORK (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, OSCEOLA, PUTNAM, TYRONE & UNADILLA) | $42.44 | $31.43 | $73.87 | Agreement |
| CARP0687-005 · Carpenters agreement, June 1, 2025 | ||||
PILEDRIVERMAN (TOWNSHIPS OF BRIGHTON…Full textPILEDRIVERMAN (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, OSCEOLA, PUTNAM, TYRONE & UNADILLA) | $38.48 | $30.22 | $68.70 | Agreement |
CARPENTER, INCLUDES FORM WORK…Full textCARPENTER, INCLUDES FORM WORK (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, GREEN OAK, HAMBURG, HARTLAND, OSCEOLA, PUTNAM, TYRONE & UNADILLA) | $42.44 | $31.43 | $73.87 | Agreement |
| CARP1004-014 · Carpenters agreement, June 1, 2020 | ||||
| PILEDRIVERMAN (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $26.46 | $20.71 | $47.17 | Agreement |
CARPENTER, INCLUDES FORM WORK…Full textCARPENTER, INCLUDES FORM WORK (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $36.21 | $21.06 | $57.27 | Agreement |
| CARP1004-014 · Carpenters agreement, June 1, 2025 | ||||
| PILEDRIVERMAN (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $26.46 | $20.71 | $47.17 | Agreement |
CARPENTER, INCLUDES FORM WORK…Full textCARPENTER, INCLUDES FORM WORK (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION) | $36.21 | $21.06 | $57.27 | Agreement |
| ELEC0017-009 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER…Full textLINE CONSTRUCTION: LINEMEN/CABLE SPLICER (TOWNSHIPS OF BRIGHTON, CONWAY, GENOA, GREEN OAK, HAMBURG, HANDY, HARTLAND, HOWELL, IOSCO, MARION, OCEOLA & PUTNAM) | $61.06 | $25.11 | $86.17 | Agreement |
| ELEC0058-010 · Electrical Workers (IBEW) agreement, June 28, 2024 | ||||
| ELECTRICIAN (TOWNSHIPS OF DEERFIELD, TYRONE, HARTLAND, OCEOLA, GENOA & BRIGHTON) | $51.32 | $28.54 | $79.86 | Agreement |
| ELEC0252-008 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (TOWNSHIPS OF GREEN OAK, HAMBURG, PUTNAM AND UNADILLA) | $56.05 | $30.52 | $86.57 | Agreement |
| ELEC0665-016 · Electrical Workers (IBEW) agreement, May 31, 2025 | ||||
| ELECTRICIAN (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO AND MARION) | $45.00 | $31.37 | $76.37 | Agreement |
| ELEC0876-004 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| LINE CONSTRUCTION: LINEMAN (TOWNSHIPS OF COHOCTAH, DEERFIELD, TYRONE & UNADILLA) | $54.41 | $23.28 | $77.69 | Agreement |
| LINE CONSTRUCTION: CABLE SPLICER (TOWNSHIPS OF COHOCTAH, DEERFIELD, TYRONE & UNADILLA) | $55.65 | $23.64 | $79.29 | Agreement |
| ENGI0325-017 · Operating Engineers agreement, September 1, 2025 | ||||
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | Agreement |
POWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1…Full textPOWER EQUIPMENT OPERATOR, UNDERGROUND CONSTRUCTION (INCLUDING SEWER): GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | Agreement |
| ENGI0326-019 · Operating Engineers agreement, June 1, 2025 | ||||
| OPERATOR: POWER EQUIPMENT: GROUP 4 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | Agreement |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 2…Full textOPERATOR: POWER EQUIPMENT: GROUP 2 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 1…Full textOPERATOR: POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BORING MACHINE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | Agreement |
| IRON0025-006 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: STRUCTURAL | $36.55 | $35.93 | $72.48 | Agreement |
| IRONWORKER: REINFORCING | $36.55 | $33.37 | $69.92 | Agreement |
| LABO0334-009 · Laborers agreement, June 1, 2025 | ||||
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2…Full textLANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | $27.71 | $9.10 | $36.81 | Agreement |
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1…Full textLANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | Agreement |
| LABO0334-026 · Laborers agreement, September 1, 2022 | ||||
LABORER: (7) LANDSCAPE…Full textLABORER: (7) LANDSCAPE (EASTERN PART OF LIVINGSTON).$ 19.59 12.95 LABORER: (5) PIPELAYER (EASTERN PART OF LIVINGSTON).$ 25.65 12.95 LABORER: (4) GRADE CHECKER (EASTERN PART OF LIVINGSTON) | $25.50 | $12.95 | $38.45 | Agreement |
| LABORER: (2) MASON TENDER-CEMENT/CONCRETE (EASTERN PART OF LIVINGSTON) | $25.31 | $12.95 | $38.26 | Agreement |
| LABORER: (1) COMMON OR GENERAL (EASTERN PART OF LIVINGSTON) | $25.20 | $12.95 | $38.15 | Agreement |
| LABO0334-027 · Laborers agreement, September 1, 2022 | ||||
LABORER: (7) LANDSCAPE…Full textLABORER: (7) LANDSCAPE (WESTERN PART OF LIVINGSTON).$ 19.59 12.95 LABORER: (5) PIPELAYER (WESTERN PART OF LIVINGSTON).$ 25.45 12.95 LABORER: (4) GRADE CHECKER (WESTERN PART OF LIVINGSTON) | $25.50 | $12.95 | $38.45 | Agreement |
| LABORER: (2) MASON TENDER-CEMENT/CONCRETE (WESTERN PART OF LIVINGSTON) | $25.31 | $12.95 | $38.26 | Agreement |
| LABORER: (1) COMMON OR GENERAL (WESTERN PART OF LIVINGSTON) | $25.20 | $12.95 | $38.15 | Agreement |
| LABO0499-019 · Laborers agreement, August 1, 2025 | ||||
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 3…Full textLABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 3 PIPELAYER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.47 | $15.45 | $53.92 | Agreement |
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2…Full textLABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) | $38.33 | $15.45 | $53.78 | Agreement |
LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1…Full textLABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER (EAST OF OAK GROVE ROAD AND SOUTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) COMMON OR GENERAL; GRADE CHECKER | $38.11 | $15.45 | $53.56 | Agreement |
| LABO0499-021 · Laborers agreement, June 1, 2025 | ||||
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (WEST OF OAK GROVE ROAD TO WEST OF PINKNEY ROAD AND DEXTER PINKNEY ROAD, INCLUDING THE CITY OF HOWELL) (EXCLUDES OPEN CUT CONSTRUCTION) | $32.53 | $13.45 | $45.98 | Agreement |
| LABO1076-007 · Laborers agreement, June 1, 2025 | ||||
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EAST OF OAK GROVE ROAD AND NORTH OF M-59, NOT INCLUDING THE CITY OF HOWELL) (EXCLUDES OPEN CUT CONSTRUCTION) | $38.00 | $18.25 | $56.25 | Agreement |
| PAIN0022-009 · Painters and Allied Trades agreement, July 1, 2008 | ||||
| PAINTER: SPRAY (EAST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY) | $25.86 | $14.75 | $40.61 | Agreement |
PAINTER: BRUSH & ROLLER…Full textPAINTER: BRUSH & ROLLER (EAST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY) | $25.06 | $14.75 | $39.81 | Agreement |
| PAIN0845-021 · Painters and Allied Trades agreement, May 21, 2014 | ||||
PAINTER (CITY OF HOWELL & WEST OF HOWELL…Full textPAINTER (CITY OF HOWELL & WEST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY) | $21.89 | $11.85 | $33.74 | Agreement |
| PLAS0016-022 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| CEMENT MASON/CONCRETE FINISHER (TOWNSHIPS OF DEERFIELD, HARTLAND, OSEOLA & TYRONE) | $25.58 | $12.88 | $38.46 | Agreement |
| PLAS0016-028 · Plasterers and Cement Masons agreement, April 1, 2014 | ||||
| CEMENT MASON/CONCRETE FINISHER (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY & HOWELL) | $24.64 | $12.88 | $37.52 | Agreement |
| PLAS0514-003 · Plasterers and Cement Masons agreement, June 1, 2023 | ||||
| CEMENT MASON/CONCRETE FINISHER (REMAINDER OF COUNTY) | $32.23 | $22.11 | $54.34 | Agreement |
| PLUM0098-010 · Plumbers and Pipefitters agreement, June 1, 2019 | ||||
| PLUMBER (TOWNSHIP OF BRIGHTON) | $35.77 | $35.13 | $70.90 | Agreement |
| PLUM0190-011 · Plumbers and Pipefitters agreement, June 1, 2021 | ||||
| PLUMBER/PIPEFITTER (TOWNSHIPS OF GREEN OAK & HAMBURG) | $44.31 | $23.70 | $68.01 | Agreement |
| PLUM0333-023 · Plumbers and Pipefitters agreement, June 1, 2022 | ||||
| PLUMBER/PIPEFITTER (REMAINDER OF COUNTY) | $42.29 | $23.94 | $66.23 | Agreement |
| PLUM0636-010 · Plumbers and Pipefitters agreement, June 5, 2017 | ||||
| PIPEFITTER (TOWNSHIP OF BRIGHTON) | $40.41 | $29.35 | $69.76 | Agreement |
| SUMI2010-062 · Survey of contractors in MI, November 9, 2010 | ||||
| TRUCK DRIVER: OFF THE ROAD TRUCK | $20.82 | $3.69 | $24.51 | Survey |
| OPERATOR: CRANE | $22.00 | $5.00 | $27.00 | Survey |
| OPERATOR: BULLDOZER | $18.00 | $5.00 | $23.00 | Survey |
| TEAM0007-006 · Teamsters agreement, June 1, 2025 | ||||
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.65 | $0.75 | $34.40 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER | $33.50 | $0.75 | $34.25 | Agreement |
| TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | $33.40 | $0.75 | $34.15 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260064?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator