CertifiedHours

Prevailing wage rates · Michigan · Wage determination

Prevailing wage rates: Lapeer County, Michigan

Heavy construction · MI20260063 modification 2, published May 18, 2026

The short answer

This sheet sets 37 classifications for heavy work in Lapeer County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $24.51 an hour (truck driver: off the road truck) to $86.17 (line construction: linemen/cable splicer). Your contract may lock an earlier modification.

Scope

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications. Of the 33 rates we can follow line by line from the first publication to today, 1 is lower.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

May 18, 2026 · modification 2

Classification names reworded; 5 fringe formulas changed among the 33 lines we could match

  • Truck driver: 3 fringe formulas changed
  • Electrician: 1 fringe formula changed
  • Line construction: 1 fringe formula changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (5)
ClassificationWasNowChange
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER$61.06 + 29%+7.40$61.06 + $25.11changed
ELECTRICIAN$44.83 + 36.76%+10.48$44.83 + $26.96changed
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK$33.55 + .75 + a+b$33.55 + $0.75changed
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER$33.40 + .75 + a+b$33.40 + $0.75changed
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK$33.30 + .75 + a+b$33.30 + $0.75changed

Earlier modifications

  • January 23, 2026 · modification 11 rate lowered
    • Laborer common or general: 1 rate lowered by $0.01 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    LABORER Common or General; Grade Checker; Mason Tender - Cement/Concrete; Pipelayer$29.46 + $16.11$29.46 + $16.10−$0.01 (−0.0%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
BOIL0169-003 · Boilermakers agreement, July 1, 2025
BOILERMAKER$43.50$36.74$80.24no changeAgreement, 2025
CARP0706-016 · Carpenters agreement, August 1, 2014
PILEDRIVERMAN$24.32$18.65$42.97no changeAgreement, 2014
CARPENTER, INCLUDES FORM WORK$36.46$23.69$60.15no changeAgreement, 2014
CARP0706-016 · Carpenters agreement, June 1, 2025
PILEDRIVERMAN$24.32$18.65$42.97—Agreement, 2025
CARPENTER, INCLUDES FORM WORK$36.46$23.69$60.15—Agreement, 2025
ELEC0017-003 · Electrical Workers (IBEW) agreement, June 1, 2025
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER$61.06$25.11$86.17changedAgreement, 2025
ELEC0948-009 · Electrical Workers (IBEW) agreement, May 25, 2025
ELECTRICIAN$44.83$26.96$71.79changedAgreement, 2025
ENGI0325-019 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER

$39.95$25.25$65.20no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)

$40.52$25.25$65.77no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)

$41.25$25.25$66.50no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)

$45.98$25.25$71.23no changeAgreement, 2025
ENGI0326-011 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$35.46$25.25$60.71no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.32$25.25$66.57—Agreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.32$25.25$66.57—Agreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$44.00$25.25$69.25no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$45.68$25.25$70.93no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$48.98$25.25$74.23no changeAgreement, 2025
IRON0025-006 · Ironworkers agreement, June 1, 2025
IRONWORKER: STRUCTURAL$36.55$35.93$72.48no changeAgreement, 2025
IRONWORKER: REINFORCING$36.55$33.37$69.92no changeAgreement, 2025
LABO0334-009 · Laborers agreement, June 1, 2025
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2…
Full text

LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER

$27.71$9.10$36.81no changeAgreement, 2025
LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1…
Full text

LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT)

$29.93$9.10$39.03no changeAgreement, 2025
LABO0334-015 · Laborers agreement, September 1, 2022
LABORER ((7) LANDSCAPE)$18.29$12.85$31.14no changeAgreement, 2022
LABORER ((5) PIPELAYER)$23.84$13.52$37.36no changeAgreement, 2022
LABORER ((4) GRADE CHECKER)$23.70$13.15$36.85no changeAgreement, 2022
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$23.53$13.15$36.68no changeAgreement, 2022
LABORER ((1) COMMON OR GENERAL)$23.39$13.15$36.54no changeAgreement, 2022
LABO1075-010 · Laborers agreement, June 1, 2025
LABORER: COMMON OR GENERAL…
Full text

LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION)

$29.46$16.10$45.56−$0.01 (−0.0%)Agreement, 2025
PAIN1052-010 · Painters and Allied Trades agreement, May 1, 2025
PAINTER: SPRAY (WEST OF HWY. M-53)$31.01$17.19$48.20no changeAgreement, 2025
PAINTER: BRUSH & ROLER (WEST OF HWY. M-53)$32.58$18.12$50.70no changeAgreement, 2025
PAIN1474-006 · Painters and Allied Trades agreement, June 1, 2010
PAINTER: SPRAY (EAST OF HWY. M-53)$24.79$12.02$36.81no changeAgreement, 2010
PAINTER: BRUSH & ROLLER (EAST OF HWY. M-53)$23.79$12.02$35.81no changeAgreement, 2010
PLAS0016-029 · Plasterers and Cement Masons agreement, April 1, 2014
CEMENT MASON/CONCRETE FINISHER$27.77$12.88$40.65no changeAgreement, 2014
PLUM0370-006 · Plumbers and Pipefitters agreement, June 1, 2020
PLUMBER/PIPEFITTER$39.81$20.95$60.76no changeAgreement, 2020
SUMI2010-061 · Survey of contractors in MI, November 9, 2010
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69$24.51no changeSurvey, 2010
TEAM0007-008 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30changedAgreement, 2025
TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER$33.40$0.75$34.15changedAgreement, 2025
TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.30$0.75$34.05changedAgreement, 2025

Modification history

Modification 1January 23, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260063?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MI20260063 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 37 classifications in 17 rate groups
  • 16 from agreements, 1 from surveys
  • Counties: Lapeer