Prevailing wage rates · Michigan · Wage determination

Prevailing wage rates: Kalamazoo County, Michigan

Heavy construction · MI20260061 modification 1, published May 18, 2026

The short answer

This sheet sets 30 classifications for heavy work in Kalamazoo County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.25 an hour (laborer: landscape) to $74.23 (operator: power equipment, excludes underground construction: group 1). Your contract may lock an earlier modification.

Scope

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

What changed this year

First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification.

Latest change

May 18, 2026 · modification 1

Classification names reworded; 2 fringe formulas changed among the 28 lines we could match

  • Truck driver: 2 fringe formulas changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (2)
ClassificationWasNowChange
TRUCK DRIVER: TRACTOR HAUL TRUCK$33.30 + .75 + a+b$33.30 + $0.75changed
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK$33.55 + .75 + a+b$33.55 + $0.75changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
CARP0525-006 · Carpenters agreement, June 1, 2023
CARPENTER, INCLUDES FORM WORK$28.29$21.42$49.71no changeAgreement, 2023
ELEC0131-006 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN$42.78$21.84$64.62no changeAgreement, 2025
ENGI0325-009 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER

$39.95$25.25$65.20no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)

$40.52$25.25$65.77no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)

$41.25$25.25$66.50no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)

$45.98$25.25$71.23no changeAgreement, 2025
ENGI0326-025 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 OILER

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$32.98$25.25$58.23no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$35.46$25.25$60.71no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$41.32$25.25$66.57—Agreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$41.32$25.25$66.57—Agreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$44.00$25.25$69.25no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$45.68$25.25$70.93no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE

$48.98$25.25$74.23no changeAgreement, 2025
IRON0025-011 · Ironworkers agreement, June 1, 2025
IRONWORKER: STRUCTURAL$36.55$34.04$70.59no changeAgreement, 2025
IRONWORKER: REINFORCING$36.55$34.04$70.59no changeAgreement, 2025
LABO0334-011 · Laborers agreement, September 1, 2022
LABORER ((5) PIPELAYER)$22.85$12.95$35.80no changeAgreement, 2022
LABORER ((4) GRADE CHECKER)$22.73$12.95$35.68no changeAgreement, 2022
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$22.55$12.95$35.50no changeAgreement, 2022
LABORER ((1) COMMON OR GENERAL)$22.42$12.95$35.37no changeAgreement, 2022
LABO0355-010 · Laborers agreement, June 1, 2025
LABORER (COMMON OR GENERAL…
Full text

LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION)

$27.21$13.45$40.66no changeAgreement, 2025
PAIN0312-014 · Painters and Allied Trades agreement, June 12, 2014
PAINTER: SPRAY$22.75$11.94$34.69no changeAgreement, 2014
PAINTER: BRUSH & ROLLER$21.75$11.94$33.69no changeAgreement, 2014
PLAS0016-020 · Plasterers and Cement Masons agreement, April 1, 2014
CEMENT MASON/CONCRETE FINISHER$22.31$12.83$35.14no changeAgreement, 2014
PLUM0333-026 · Plumbers and Pipefitters agreement, June 1, 2022
PLUMBER (FORT CUSTER)$42.29$23.94$66.23no changeAgreement, 2022
PLUM0357-012 · Plumbers and Pipefitters agreement, July 1, 2020
PLUMBER (EXCLUDING FORT CUSTER)$35.20$22.35$57.55no changeAgreement, 2020
SUMI2010-059 · Survey of contractors in MI, November 9, 2010
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69$24.51no changeSurvey, 2010
TRUCK DRIVER: DUMP TRUCK$18.00$6.43$24.43no changeSurvey, 2010
LABORER: LANDSCAPE$12.25$0.00$12.25no changeSurvey, 2010
TEAM0007-011 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: TRACTOR HAUL TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.30$0.75$34.05changedAgreement, 2025
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30changedAgreement, 2025

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260061?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MI20260061 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 30 classifications in 13 rate groups
  • 12 from agreements, 1 from surveys
  • Counties: Kalamazoo