Prevailing wage rates: Eaton County, Michigan

Heavy construction · MI20260056 modification 1, published May 18, 2026

The short answer

This sheet sets 28 classifications for heavy work in Eaton County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.25 an hour (laborer: landscape) to $76.37 (electrician (townships of benton). Your contract may lock an earlier modification.

Scope

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0525-007 · Carpenters agreement, June 1, 2023
CARPENTER, INCLUDES FORM WORK (TOWNSHIPS OF BELLEVUE, KALAMO, VERMONTVILLE & WALTON)$28.29$21.42$49.71Agreement
CARP1004-015 · Carpenters agreement, June 1, 2025
Group definitions, zones and premiums for CARP1004-015
CARPENTER, INCLUDES FORM WORK (REMAINDER OF COUNTY).$ 36.21 21.06
ELEC0445-009 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (TOWNSHIPS OF BELLEVUE, BROOKFIELD, KALAMO, SUNFIELD, VERMONTVILLE & WALTON)$41.00$25.74$66.74Agreement
ELEC0665-013 · Electrical Workers (IBEW) agreement, May 31, 2025
ELECTRICIAN (TOWNSHIPS OF BENTON…
Full text

ELECTRICIAN (TOWNSHIPS OF BENTON, CARMEL, CHESTER, DELTA, EATON, EATON RAPIDS, HAMLIN, ONEIDA, ROXAND AND WINDSOR)

$45.00$31.37$76.37Agreement
ENGI0325-009 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER

$39.95$25.25$65.20Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)

$40.52$25.25$65.77Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)

$41.25$25.25$66.50Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)

$45.98$25.25$71.23Agreement
ENGI0326-011 · Operating Engineers agreement, June 1, 2025
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$35.46$25.25$60.71Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.32$25.25$66.57Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT)

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.32$25.25$66.57Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$44.00$25.25$69.25Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$45.68$25.25$70.93Agreement
OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1…
Full text

OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER.

FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$48.98$25.25$74.23Agreement
IRON0025-011 · Ironworkers agreement, June 1, 2025
IRONWORKER: STRUCTURAL$36.55$34.04$70.59Agreement
IRONWORKER: REINFORCING$36.55$34.04$70.59Agreement
LABO0334-014 · Laborers agreement, September 1, 2022
LABORER ((5) PIPELAYER)$23.84$13.15$36.99Agreement
LABORER ((4) GRADE CHECKER)$23.70$13.15$36.85Agreement
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$23.53$13.15$36.68Agreement
LABO0499-023 · Laborers agreement, June 1, 2025
LABORER: GRADE CHECKER…
Full text

LABORER: GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION)

$32.53$13.45$45.98Agreement
PAIN0845-017 · Painters and Allied Trades agreement, May 21, 2014
PAINTER: BRUSH, ROLLER AND SPRAY$21.89$11.85$33.74Agreement
PLAS0016-027 · Plasterers and Cement Masons agreement, April 1, 2014
CEMENT MASON/CONCRETE FINISHER$24.64$12.88$37.52Agreement
PLUM0333-020 · Plumbers and Pipefitters agreement, June 1, 2022
PLUMBER/PIPEFITTER$42.29$23.94$66.23Agreement
SUMI2010-054 · Survey of contractors in MI, November 9, 2010
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69$24.51Survey
TRUCK DRIVER: DUMP TRUCK$18.00$6.43$24.43Survey
LABORER: LANDSCAPE$12.25$0.00$12.25Survey
LABORER: COMMON OR GENERAL$17.75$6.40$24.15Survey
TEAM0007-011 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: TRACTOR HAUL TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.30$0.75$34.05Agreement
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260056?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator