Prevailing wage rates: Delta and Dickinson Counties, Michigan

Heavy construction · MI20260047 modification 1, published May 18, 2026

The short answer

This sheet sets 30 classifications for heavy work in Delta and Dickinson Counties, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.63 an hour (laborer: landscape) to $74.72 (ironworker, reinforcing and structural (contracts $10,000,000 or greater)). Your contract may lock an earlier modification.

Scope

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

What changed this year

First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification.

Latest change

May 18, 2026 · modification 1

Classification names reworded; 1 fringe formula changed among the 30 lines we could match

  • Truck driver: 1 fringe formula changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (1)
ClassificationWasNowChange
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK$33.55 + .75 + a+b$33.55 + $0.75changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
BRMI0006-002 · Bricklayers agreement, May 1, 2024
BRICKLAYER$34.19$24.65$58.84no changeAgreement, 2024
CARP1510-002 · Carpenters agreement, June 1, 2025
CARPENTER, INCLUDES FORM WORK$34.01$23.14$57.15no changeAgreement, 2025
ELEC0219-007 · Electrical Workers (IBEW) agreement, June 1, 2019
ELECTRICIAN: ELECTRICAL CONTRACTS OVER $130,000 (DICKINSON COUNTY)$33.94$21.80$55.74no changeAgreement, 2019
ELECTRICIAN: ELECTRICAL CONTRACTS $180,000 OR LESS (DICKINSON COUNTY)$31.75$21.73$53.48no changeAgreement, 2019
ELEC0979-002 · Electrical Workers (IBEW) agreement, June 1, 2019
ELECTRICIAN (DELTA COUNTY)$33.43$21.78$55.21no changeAgreement, 2019
ENGI0325-021 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR

$39.95$25.25$65.20no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)

$40.52$25.25$65.77no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)

$41.25$25.25$66.50no changeAgreement, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)

$45.98$25.25$71.23no changeAgreement, 2025
ENGI0326-006 · Operating Engineers agreement, May 1, 2025
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$44.92$25.00$69.92no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$44.63$25.00$69.63no changeAgreement, 2025
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$43.81$25.00$68.81no changeAgreement, 2025
OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$35.86$12.50$48.36no changeAgreement, 2025
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$37.26$25.00$62.26no changeAgreement, 2025
OPERATOR POWER EQUIPMENT: GROUP 1…
Full text

OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$40.51$25.00$65.51no changeAgreement, 2025
IRON0008-009 · Ironworkers agreement, June 1, 2025
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY

$41.05$33.67$74.72no changeAgreement, 2025
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY

$41.05$33.67$74.72no changeAgreement, 2025
LABO0334-002 · Laborers agreement, September 1, 2018
LABORER ((5) PIPELAYER)$21.56$12.85$34.41no changeAgreement, 2018
LABORER ((4) GRADE CHECKER)$21.51$12.85$34.36no changeAgreement, 2018
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$21.33$12.85$34.18no changeAgreement, 2018
LABORER ((1) COMMON OR GENERAL)$21.19$12.85$34.04no changeAgreement, 2018
LABO1329-002 · Laborers agreement, May 1, 2025
LABORER: COMMON OR GENERAL…
Full text

LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION)

$32.74$13.45$46.19no changeAgreement, 2025
PLAS0016-035 · Plasterers and Cement Masons agreement, April 1, 2014
CEMENT MASON/CONCRETE FINISHER$20.17$10.13$30.30no changeAgreement, 2014
PLUM0111-009 · Plumbers and Pipefitters agreement, May 27, 2019
PLUMBER/PIPEFITTER$34.48$25.18$59.66no changeAgreement, 2019
SUMI2010-045 · Survey of contractors in MI, November 9, 2010
TRUCK DRIVER: DUMP TRUCK$12.63$1.25$13.88no changeSurvey, 2010
OPERATOR: ROLLER$13.74$7.93$21.67no changeSurvey, 2010
OPERATOR: GRADER/BLADE$16.63$5.85$22.48no changeSurvey, 2010
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$12.98$6.12$19.10no changeSurvey, 2010
LABORER: LANDSCAPE$10.89$1.74$12.63no changeSurvey, 2010
TEAM0007-010 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30changedAgreement, 2025

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260047?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MI20260047 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 30 classifications in 13 rate groups
  • 12 from agreements, 1 from surveys
  • Counties: Delta, Dickinson