Prevailing wage rates: Chippewa County, Michigan

Heavy construction · MI20260033 modification 1, published May 18, 2026

The short answer

This sheet sets 28 classifications for heavy work in Chippewa County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.63 an hour (laborer: landscape) to $74.72 (ironworker, reinforcing and structural (contracts less than $10,000,000)). Your contract may lock an earlier modification.

Scope

Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
BRMI0006-002 · Bricklayers agreement, May 1, 2024
BRICKLAYER$34.19$24.65$58.84Agreement
CARP1510-002 · Carpenters agreement, June 1, 2025
CARPENTER, INCLUDES FORM WORK$34.01$23.14$57.15Agreement
ELEC1070-003 · Electrical Workers (IBEW) agreement, June 1, 2016
ELECTRICIAN (CONTRACTS OVER $135,000)$33.44$18.67$52.11Agreement
ELECTRICIAN (CONTRACTS $135,000 AND UNDER)$31.44$18.59$50.03Agreement
ENGI0325-021 · Operating Engineers agreement, September 1, 2025
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR

$39.95$25.25$65.20Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)

$40.52$25.25$65.77Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)

$41.25$25.25$66.50Agreement
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)

$45.98$25.25$71.23Agreement
ENGI0326-006 · Operating Engineers agreement, May 1, 2025
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 220' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$44.92$25.00$69.92Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 140' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$44.63$25.00$69.63Agreement
OPERATOR: POWER EQUIPMENT…
Full text

OPERATOR: POWER EQUIPMENT: CRANE, MAIN BOOM & JIB 120' OR LONGER (EXCLUDES UNDERGROUND CONSTRUCTION)

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$43.81$25.00$68.81Agreement
OPERATOR POWER EQUIPMENT: GROUP 3 OILER EXCLUDES UNDERGROUND CONSTRUCTION

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$35.86$12.50$48.36Agreement
OPERATOR POWER EQUIPMENT: GROUP 2 BOOM TRUCK (NON-SWING) EXCLUDES UNDERGROUND CONSTRUCTION

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$37.26$25.00$62.26Agreement
OPERATOR POWER EQUIPMENT: GROUP 1…
Full text

OPERATOR POWER EQUIPMENT: GROUP 1 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; COMPACTOR; SCRAPER; LOADER EXCLUDES UNDERGROUND CONSTRUCTION

FOOTNOTES: PREMIUM RATE: MAIN BOOM AND JIB 300 FEET OR LONGER IS $1.50 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE. MAIN BOOM AND JIB 400 FEET OR LONGER IS $3.00 PER HOUR ABOVE THE 220 FT. BOOM AND JIB RATE

$40.51$25.00$65.51Agreement
IRON0008-009 · Ironworkers agreement, June 1, 2025
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS LESS THAN $10,000,000)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY

$41.05$33.67$74.72Agreement
IRONWORKER, REINFORCING AND STRUCTURAL (CONTRACTS $10,000,000 OR GREATER)

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY

$41.05$33.67$74.72Agreement
LABO0334-002 · Laborers agreement, September 1, 2018
LABORER ((5) PIPELAYER)$21.56$12.85$34.41Agreement
LABORER ((4) GRADE CHECKER)$21.51$12.85$34.36Agreement
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$21.33$12.85$34.18Agreement
LABORER ((1) COMMON OR GENERAL)$21.19$12.85$34.04Agreement
LABO1329-002 · Laborers agreement, May 1, 2025
Group definitions, zones and premiums for LABO1329-002
LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (EXCLUDES UNDERGROUND CONSTRUCTION).$ 32.74 13.45
PLAS0016-035 · Plasterers and Cement Masons agreement, April 1, 2014
CEMENT MASON/CONCRETE FINISHER$20.17$10.13$30.30Agreement
PLUM0111-009 · Plumbers and Pipefitters agreement, May 27, 2019
PLUMBER/PIPEFITTER$34.48$25.18$59.66Agreement
SUMI2010-031 · Survey of contractors in MI, November 9, 2010
TRUCK DRIVER: DUMP TRUCK$12.63$1.25$13.88Survey
OPERATOR: ROLLER$13.74$7.93$21.67Survey
OPERATOR: GRADER/BLADE$16.63$5.85$22.48Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$12.98$6.12$19.10Survey
LABORER: LANDSCAPE$10.89$1.74$12.63Survey
TEAM0007-010 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK

FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY

$33.55$0.75$34.30Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MI20260033?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator