Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Ingham County, Michigan
Residential construction · MI20260014 modification 1, published May 18, 2026
The short answer
This sheet sets 21 classifications for residential work in Ingham County, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.45 an hour (laborer: landscape) to $74.23 (operator: power equipment: group 1). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| CARP1004-012 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER (FORM WORK ONLY) | $36.21 | $21.06 | $57.27 | Agreement |
| ELEC0252-006 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN (TOWNSHIPS OF BUNKER HILL, LESLIE, ONONDAGA AND STOCKBRIDGE) | $39.26 | $20.35 | $59.61 | Agreement |
| ELEC0665-010 · Electrical Workers (IBEW) agreement, May 31, 2022 | ||||
ELECTRICIAN (TOWNSHIPS OF ALAIEDON…Full textELECTRICIAN (TOWNSHIPS OF ALAIEDON, AURELIUS, DELHI, INGHAM, LANSING, LEROY, LOCKE, MERIDIAN, VEVAY, WHEATFIELD, WHITE OAK AND WILLIAMSON) | $31.20 | $10.97 | $42.17 | Agreement |
| ENGI0325-029 · Operating Engineers agreement, June 1, 2025 | ||||
| OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 2…Full textOPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | Agreement |
OPERATOR: POWER EQUIPMENT: GROUP 1…Full textOPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 | $74.23 | Agreement |
| IRON0025-004 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER, STRUCTURAL | $36.55 | $35.93 | $72.48 | Agreement |
| LABO0499-008 · Laborers agreement, October 1, 2024 | ||||
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.75 | $13.45 | $36.20 | Agreement |
| PAIN0845-002 · Painters and Allied Trades agreement, May 21, 2025 | ||||
| PAINTER: BRUSH AND ROLLER | $21.84 | $18.63 | $40.47 | Agreement |
| PLUM0333-003 · Plumbers and Pipefitters agreement, June 18, 2024 | ||||
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | $31.35 | $22.90 | $54.25 | Agreement |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $31.35 | $22.90 | $54.25 | Agreement |
| ROOF0070-012 · Roofers agreement, June 1, 2023 | ||||
| ROOFER | $31.18 | $17.22 | $48.40 | Agreement |
| SHEE0007-023 · Sheet Metal Workers agreement, May 1, 2024 | ||||
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $32.00 | $10.73 | $42.73 | Agreement |
| SUMI2010-012 · Survey of contractors in MI, September 16, 2010 | ||||
| TRUCK DRIVER: DUMP TRUCK | $17.00 | $5.71 | $22.71 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.66 | $7.65 | $25.31 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR | $19.94 | $5.46 | $25.40 | Survey |
| LABORER: PIPELAYER | $17.95 | $5.46 | $23.41 | Survey |
| LABORER: LANDSCAPE | $9.64 | $2.81 | $12.45 | Survey |
| LABORER: COMMON OR GENERAL | $17.21 | $5.46 | $22.67 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $19.27 | $5.85 | $25.12 | Survey |
| CARPENTER, EXCLUDES FORM WORK | $17.64 | $6.70 | $24.34 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260014?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator