Prevailing wage rates · Michigan · Wage determination
Prevailing wage rates: Allegan, Arenac, Branch and 17 more counties, Michigan
Residential construction · MI20260008 modification 3, published May 18, 2026
The short answer
This sheet sets 63 classifications for residential work in Allegan, Arenac, Branch and 17 more counties, Michigan. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $13.25 an hour (truck driver: dump truck) to $74.88 (sheetmetal worker (hvac duct and unit installation) (st. joseph county)). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
What changed this year
First published January 2, 2026, this sheet is now on modification 3, and its rates have changed in 2 modifications. Of the 54 rates we can follow line by line from the first publication to today, 1 is higher and 1 is lower.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
May 18, 2026 · modification 3
Classification names reworded; no change among the 54 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Earlier modifications
January 30, 2026 · modification 21 rate raised
- Sheetmetal worker: 1 rate raised by $41.55 an hour
Every line that changed (1)
Classification Was Now Change SHEETMETAL WORKER (HVAC Duct and Unit Installation) $19.87 + $13.46 $44.45 + $30.43 +$41.55 (+124.7%) January 23, 2026 · modification 11 rate lowered
- Laborer: 1 rate lowered by $0.01 an hour
Every line that changed (1)
Classification Was Now Change LABORER (Common or General; Mason Tender-Cement/Concrete) SHIAWASSEE COUNTIES $29.46 + $16.11 $29.46 + $16.10 −$0.01 (−0.0%)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 3 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| BRMI0009-006 · Bricklayers agreement, August 1, 2024 | |||||
| BRICKLAYER | $35.83 | $22.18 | $58.01 | no change | Agreement, 2024 |
| CARP0100-004 · Carpenters agreement, June 1, 2025 | |||||
| CARPENTER (ALLEGAN, LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $31.50 | $21.15 | $52.65 | no change | Agreement, 2025 |
| CARP0525-004 · Carpenters agreement, June 1, 2023 | |||||
| CARPENTER (BRANCH, HILLSDALE & ST. JOSEPH COUNTIES) | $28.29 | $21.42 | $49.71 | no change | Agreement, 2023 |
| CARP0706-003 · Carpenters agreement, June 1, 2025 | |||||
CARPENTER: SHIAWASSEE COUNTY…Full textCARPENTER: SHIAWASSEE COUNTY (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND & SHIAWASSEE COUNTIES) | $36.46 | $23.69 | $60.15 | no change | Agreement, 2025 |
CARPENTER: ARENAC, CLARE…Full textCARPENTER: ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA & MIDLAND COUNTIES (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND & SHIAWASSEE COUNTIES) | $35.86 | $23.69 | $59.55 | no change | Agreement, 2025 |
| CARP1004-008 · Carpenters agreement, June 1, 2025 | |||||
| CARPENTER (LENAWEE COUNTY) | $35.41 | $21.06 | $56.47 | no change | Agreement, 2025 |
| CARP1234-002 · Carpenters agreement, August 1, 2024 | |||||
| CARPENTER: SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS (SANILAC COUNTY) | $28.19 | $15.76 | $43.95 | no change | Agreement, 2024 |
| CARPENTER: MULTI-FAMILY CONDOMINIUMS (SANILAC COUNTY) | $31.58 | $16.27 | $47.85 | no change | Agreement, 2024 |
| ELEC0008-009 · Electrical Workers (IBEW) agreement, April 27, 2025 | |||||
| ELECTRICIAN (HILLSDALE & LENAWEE COUNTIES) | $30.31 | $13.18 | $43.49 | — | Agreement, 2025 |
| ELEC0058-002 · Electrical Workers (IBEW) agreement, September 29, 2024 | |||||
| ELECTRICIAN (HURON & SANILAC COUNTIES) | $29.42 | $16.50 | $45.92 | no change | Agreement, 2024 |
| ELEC0131-004 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (ALLEGAN…Full textELECTRICIAN (ALLEGAN (TOWNSHIPS OF ALLEGAN, CASCO, CHESHIRE, CLYDE, GANGES, GUN PLAIN, HEATH, HOPKINS, LEE, MANLIUS, MARTIN, MONTEREY, OTSEGO, SAUGATUCK, TROWBRIDGE, VALLEY, WATSON & WAYLAND) & ST. JOSEPH COUNTIES) | $34.22 | $9.52 | $43.74 | no change | Agreement, 2025 |
| ELEC0275-008 · Electrical Workers (IBEW) agreement, June 1, 2024 | |||||
ELECTRICIAN (ALLEGAN…Full textELECTRICIAN (ALLEGAN (TOWNSHIPS OF DORR, FILLMORE, LAKETON, LEIGHTON, OVERISEL & SALEM), ISABELLA (TOWNSHIPS OF BLOOMFIELD, COLDWATER, DEERFIELD, FREMONT, GILMORE, NOTTAWA, ROLLAND & SHERMAN), LAKE (TOWNSHIPS OF CHASE, CHERRY VALLEY, LAKE, PINORA, PLEASANT PLAINS, SWEETWATER, WEBBER & YATES), MASON (TOWNSHIPS OF AMBER, BRANCH, CUSTER, EDEN, HAMLIN. LOGAN, PERE MARQUETTE, RIVERTON, SHERIDAN, SHERMAN, SUMMIT & VICTORY), MECOSTA, MONTCALM, OCEANA & OSCEOLA (TOWNSHIPS OF EVART, | $29.22 | $16.98 | $46.20 | — | Agreement, 2024 |
| ELEC0445-006 · Electrical Workers (IBEW) agreement, May 29, 2017 | |||||
| ELECTRICIAN (BRANCH COUNTY) | $18.00 | $7.44 | $25.44 | no change | Agreement, 2017 |
| ELEC0498-006 · Electrical Workers (IBEW) agreement, June 1, 2023 | |||||
ELECTRICIAN (CLARE…Full textELECTRICIAN (CLARE (TOWNSHIPS OF FREEMAN, GARFIELD, GREENWOOD, LINCOLN, REDDING, SUMMERFIELD, SURREY AND WINTERFIELD), LAKE (TOWNSHIPS OF DOVER, EDEN, ELK, ELLSWORTH, NEWKIRK, PEACOCK AND SAUBLE), MASON (TOWNSHIPS OF FREESOIL, GRANT AND MEADE), & OSCEOLA (ALL TOWNSHIPS EXCEPT EVART, HERSEY, ORIENT AND RICHMOND) COUNTIES) | $33.65 | $22.63 | $56.28 | no change | Agreement, 2023 |
| ELEC0557-004 · Electrical Workers (IBEW) agreement, June 1, 2020 | |||||
ELECTRICIAN (GRATIOT…Full textELECTRICIAN (GRATIOT (TOWNSHIPS OF ARCADA, BETHANY, ELBA, EMERSON, HAMILTON, ITHACA, LAFAYETTE, NEW HAVEN, NEWARK, NORTH STAR, PINE RIVER, SEVILLE, SUMNER, WASHINGTON & WHEELER), ISABELLA (TOWNSHIPS OF LINCOLN & COE) & MIDLAND (TOWNSHIPS OF INGERSOLL, JASPER, MOUNT HALEY AND PORTER) COUNTIES) | $34.25 | $23.13 | $57.38 | no change | Agreement, 2020 |
| ELEC0665-002 · Electrical Workers (IBEW) agreement, May 31, 2022 | |||||
ELECTRICIAN (GRATIOT…Full textELECTRICIAN (GRATIOT (TOWNSHIPS OF FULTON & NORTH SHADE) & SHIAWASSEE (TOWNSHIPS OF PERRY & WOODHULL) COUNTIES) | $31.20 | $10.97 | $42.17 | — | Agreement, 2022 |
| ELEC0692-008 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (ARENAC…Full textELECTRICIAN (ARENAC, CLARE (TOWNSHIPS OF ARTHUR, FRANKLIN, FROST, GRANT, HAMILTON, HATTON, HAYES & SHERIDAN), GLADWIN, ISABELLA (TOWNSHIPS OF CHIPPEWA, DENVER, ISABELLA, UNION, VERNON & WISE), & MIDLAND (ALL TOWNSHIPS EXCEPT INGERSOLL, JASPER, MOUNT HALEY & PORTER) COUNTIES) | $40.00 | $26.52 | $66.52 | — | Agreement, 2025 |
| ELEC0948-004 · Electrical Workers (IBEW) agreement, May 25, 2025 | |||||
| ELECTRICIAN (SHIAWASSEE COUNTY (ALL TOWNSHIPS EXCEPT PERRY AND WOODHULL)) | $35.62 | $13.70 | $49.32 | — | Agreement, 2025 |
| ENGI0325-003 · Operating Engineers agreement, June 1, 2025 | |||||
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (LENAWEE COUNTY) | $45.34 | $25.35 | $70.69 | no change | Agreement, 2025 |
| ENGI0325-007 · Operating Engineers agreement, June 1, 2025 | |||||
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (ALLEGAN, BRANCH, HILLSDALE, LAKE, MASON, MECOSTA, MONTCALM, OCEANA, OSCEOLA & ST. JOSEPH COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | no change | Agreement, 2025 |
| ENGI0325-014 · Operating Engineers agreement, June 1, 2025 | |||||
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR; LOADER; ROLLER (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, SANILAC & SHIAWASSEE COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | no change | Agreement, 2025 |
| LABO0355-004 · Laborers agreement, June 1, 2022 | |||||
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (ALLEGAN, BRANCH & ST. JOSEPH COUNTIES) | $26.70 | $12.95 | $39.65 | no change | Agreement, 2022 |
| LABO0355-005 · Laborers agreement, June 1, 2024 | |||||
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $23.34 | $11.60 | $34.94 | no change | Agreement, 2024 |
| LABO0499-017 · Laborers agreement, October 1, 2024 | |||||
| LABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (HILLSDALE & LENAWEE COUNTIES) | $31.87 | $14.45 | $46.32 | no change | Agreement, 2024 |
| LABO1075-007 · Laborers agreement, June 1, 2025 | |||||
| LABORER: COMMON OR GENERAL; MASON TENDER-CEMENT/CONCRETE (SANALIC COUNTY) | $31.30 | $18.40 | $49.70 | no change | Agreement, 2025 |
| LABORER, COMMON OR GENERAL; MASON TENDER-CEMENT/CONCRETE (SHIAWASSEE COUNTIES) | $29.46 | $16.10 | $45.56 | −$0.01 (−0.0%) | Agreement, 2025 |
| LABO1098-015 · Laborers agreement, July 1, 2025 | |||||
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL; MASON TENDER - CEMENT/CONCRETE (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA & MIDLAND COUNTIES) | $27.68 | $13.45 | $41.13 | no change | Agreement, 2025 |
| PLUM0085-014 · Plumbers and Pipefitters agreement, May 1, 2023 | |||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION (ARENAC, CLARE, GLADWIN, GRATIOT, HURON (WEST OF M-53), ISABELLA & MIDLAND COUNTIES) | $30.45 | $10.64 | $41.09 | no change | Agreement, 2023 |
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (ARENAC, CLARE, GLADWIN, GRATIOT, HURON (WEST OF M-53), ISABELLA & MIDLAND COUNTIES) | $30.45 | $10.64 | $41.09 | no change | Agreement, 2023 |
| PLUM0098-004 · Plumbers and Pipefitters agreement, June 1, 2022 | |||||
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION (HURON (EAST OF HWY M-53) & SANILAC COUNTIES) | $27.06 | $23.52 | $50.58 | no change | Agreement, 2022 |
| PLUM0174-009 · Plumbers and Pipefitters agreement, July 1, 2020 | |||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION (ALLEGAN (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM), LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $37.09 | $22.52 | $59.61 | — | Agreement, 2020 |
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (ALLEGAN (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM), LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $39.89 | $23.82 | $63.71 | — | Agreement, 2020 |
| PLUM0174-009 · Plumbers and Pipefitters agreement, July 1, 2022 | |||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION (ALLEGAN (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM), LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $37.09 | $22.52 | $59.61 | — | Agreement, 2022 |
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (ALLEGAN (TOWNSHIPS OF DORR, FILLMORE, LAKETOWN, LEIGHTON, OVERISEL & SALEM), LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $39.89 | $23.82 | $63.71 | — | Agreement, 2022 |
| PLUM0190-009 · Plumbers and Pipefitters agreement, June 1, 2021 | |||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION (LENAWEE COUNTY (TOWNSHIPS OF CLINTON, MACON & TECUMSEH)) | $44.31 | $23.70 | $68.01 | no change | Agreement, 2021 |
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (LENAWEE COUNTY (TOWNSHIPS OF CLINTON, MACON & TECUMSEH)) | $44.31 | $23.70 | $68.01 | no change | Agreement, 2021 |
| PLUM0333-013 · Plumbers and Pipefitters agreement, June 18, 2024 | |||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION (BRANCH, HILLSDALE & LENAWEE (EXCEPT TOWNSHIPS OF CLINTON, MACON & TECUMSEH) COUNTIES) | $31.35 | $22.90 | $54.25 | no change | Agreement, 2024 |
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (BRANCH, HILLSDALE & LENAWEE (EXCEPT TOWNSHIPS OF CLINTON, MACON & TECUMSEH) COUNTIES) | $31.35 | $22.90 | $54.25 | no change | Agreement, 2024 |
| PLUM0357-009 · Plumbers and Pipefitters agreement, July 1, 2021 | |||||
PLUMBER: INCLUDING HVAC PIPE INSTALLATION…Full textPLUMBER: INCLUDING HVAC PIPE INSTALLATION (ALLEGAN (REMAINDER OF COUNTY) & ST. JOSEPH COUNTIES) | $27.18 | $21.05 | $48.23 | no change | Agreement, 2021 |
PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION…Full textPIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (ALLEGAN (REMAINDER OF COUNTY) & ST. JOSEPH COUNTIES) | $27.18 | $21.05 | $48.23 | no change | Agreement, 2021 |
| PLUM0370-004 · Plumbers and Pipefitters agreement, June 1, 2018 | |||||
| PLUMBER: INCLUDING HVAC PIPE INSTALLATION (SHIAWASSEE COUNTY) | $26.46 | $20.60 | $47.06 | no change | Agreement, 2018 |
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (SHIAWASSEE COUNTY) | $26.46 | $20.60 | $47.06 | no change | Agreement, 2018 |
| PLUM0636-007 · Plumbers and Pipefitters agreement, June 5, 2022 | |||||
| PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION (HURON (EAST OF HWY M-53) & SANILAC COUNTIES) | $41.61 | $29.35 | $70.96 | no change | Agreement, 2022 |
| ROOF0070-010 · Roofers agreement, July 8, 2025 | |||||
| ROOFER (HILLSDALE COUNTY) | $42.67 | $21.67 | $64.34 | no change | Agreement, 2025 |
| ROOF0070-015 · Roofers agreement, June 1, 2025 | |||||
| ROOFER (LAKE, MASON & OCEANA COUNTIES) | $32.65 | $14.80 | $47.45 | no change | Agreement, 2025 |
| ROOF0070-017 · Roofers agreement, June 1, 2020 | |||||
| ROOFER (BRANCH & ST. JOSEPH COUNTIES) | $28.68 | $15.52 | $44.20 | no change | Agreement, 2020 |
| ROOF0070-020 · Roofers agreement, June 1, 2025 | |||||
| ROOFER (ALLEGAN, MECOSTA & MONTCALM COUNTIES) | $26.60 | $16.75 | $43.35 | no change | Agreement, 2025 |
| ROOF0134-005 · Roofers agreement, July 1, 2024 | |||||
| ROOFER (LENAWEE COUNTY) | $30.73 | $26.82 | $57.55 | no change | Agreement, 2024 |
| ROOF0149-015 · Roofers agreement, June 1, 2024 | |||||
| ROOFER (SANILAC COUNTY) | $30.38 | $19.87 | $50.25 | no change | Agreement, 2024 |
| ROOF0149-018 · Roofers agreement, May 1, 2024 | |||||
| ROOFER (OSCEOLA COUNTY) | $30.38 | $19.87 | $50.25 | no change | Agreement, 2024 |
| ROOF0149-020 · Roofers agreement, June 1, 2024 | |||||
| ROOFER (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA & MIDLAND COUNTIES) | $30.38 | $19.87 | $50.25 | no change | Agreement, 2024 |
| SHEE0007-017 · Sheet Metal Workers agreement, May 1, 2018 | |||||
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (SHIAWASSEE COUNTY) | $24.88 | $8.76 | $33.64 | no change | Agreement, 2018 |
| SHEE0007-024 · Sheet Metal Workers agreement, May 1, 2024 | |||||
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (ALLEGAN, BRANCH & HILLSDALE COUNTIES) | $32.00 | $10.73 | $42.73 | no change | Agreement, 2024 |
| SHEE0007-029 · Sheet Metal Workers agreement, May 1, 2018 | |||||
SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION)…Full textSHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (LAKE, MASON, MECOSTA, MONTCALM, OCEANA & OSCEOLA COUNTIES) | $21.44 | $11.44 | $32.88 | no change | Agreement, 2018 |
| SHEE0007-032 · Sheet Metal Workers agreement, May 1, 2018 | |||||
SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION)…Full textSHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (ARENAC, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA & MIDLAND COUNTIES) | $21.54 | $11.91 | $33.45 | no change | Agreement, 2018 |
| SHEE0020-031 · Sheet Metal Workers agreement, July 1, 2025 | |||||
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (ST. JOSEPH COUNTY) | $44.45 | $30.43 | $74.88 | +$41.55 (+124.7%) | Agreement, 2025 |
| SHEE0033-032 · Sheet Metal Workers agreement, September 1, 2012 | |||||
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (LENAWEE COUNTY) | $17.21 | $9.99 | $27.20 | no change | Agreement, 2012 |
| SHEE0080-005 · Sheet Metal Workers agreement, July 1, 2022 | |||||
| SHEETMETAL WORKER (HVAC DUCT AND UNIT INSTALLATION) (SANILAC COUNTY) | $28.67 | $9.50 | $38.17 | no change | Agreement, 2022 |
| SUMI2010-006 · Survey of contractors in MI, September 16, 2010 | |||||
| TRUCK DRIVER: DUMP TRUCK | $12.00 | $1.25 | $13.25 | no change | Survey, 2010 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $18.88 | $6.10 | $24.98 | no change | Survey, 2010 |
| PAINTER: SPRAY | $14.36 | $1.98 | $16.34 | no change | Survey, 2010 |
| PAINTER: BRUSH ONLY | $13.44 | $2.17 | $15.61 | no change | Survey, 2010 |
| CEMENT MASON/CONCRETE FINISHER | $19.55 | $6.35 | $25.90 | no change | Survey, 2010 |
Modification history
| Modification 2 | January 30, 2026 |
| Modification 3 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MI20260008?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 3 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and MI20260008 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 63 classifications in 49 rate groups
- 48 from agreements, 1 from surveys
- Counties: Allegan, Arenac, Branch, Clare, Gladwin, Gratiot, Hillsdale, Huron, Isabella, Lake, Lenawee, Mason, Mecosta, Midland, Montcalm, Oceana, Osceola, Sanilac, Shiawassee, St Joseph