This sheet sets 73 classifications for building work in Queen Anne's County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.24 an hour (plasterer - mixer) to $105.42 (elevator mechanic). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SAMD2025-001 · SAMD, December 11, 2025
BALANCING TECHNICIAN$31.63$8.82$40.45SAMD
BRICKLAYER$38.80$15.57$54.37SAMD
CARPENTER$37.08$25.48$62.56SAMD
CARPET LAYER$35.10$15.33$50.43SAMD
CEMENT MASON$30.00$3.03$33.03SAMD
COMMUNICATION INSTALLER TECHNICIAN$39.71$12.29$52.00SAMD
DRYWALL - SPACKLING, TAPING, & FINISHING$29.16$12.01$41.17SAMD
ELECTRICIAN$36.75$26.41$63.16SAMD
ELEVATOR MECHANIC$58.81$46.61$105.42SAMD
FIREPROOFER - BY HAND$23.96$4.85$28.81SAMD
FIREPROOFER - SPRAYER$27.68$11.63$39.31SAMD
INSULATION WORKER$40.77$20.42$61.19SAMD
IRONWORKER - REINFORCING$33.12$25.63$58.75SAMD
IRONWORKER - STRUCTURAL$24.56$1.96$26.52SAMD
LABORER - AIR TOOL OPERATOR$24.23$5.66$29.89SAMD
LABORER - ASPHALT PAVER$24.23$5.66$29.89SAMD
LABORER - ASPHALT RAKER$21.40$2.79$24.19SAMD
LABORER - BLASTER - DYNAMITE$24.23$5.66$29.89SAMD
LABORER - BURNER$24.23$5.66$29.89SAMD
LABORER - COMMON$21.40$2.79$24.19SAMD
LABORER - CONCRETE PUDDLER$21.40$2.79$24.19SAMD
LABORER - CONCRETE SURFACER$24.23$5.66$29.89SAMD
LABORER - CONCRETE TENDER$21.40$2.79$24.19SAMD
LABORER - CONCRETE VIBRATOR$21.40$2.79$24.19SAMD
LABORER - DENSITY GAUGE$21.40$2.79$24.19SAMD
LABORER - FIREPROOFER - MIXER$21.40$2.79$24.19SAMD
LABORER - FLAGGER$21.40$2.79$24.19SAMD
LABORER - GRADE CHECKER$21.40$2.79$24.19SAMD
LABORER - HAND ROLLER$21.40$2.79$24.19SAMD
LABORER - HAZARDOUS MATERIAL HANDLER$24.23$5.66$29.89SAMD
LABORER - JACKHAMMER$21.40$2.79$24.19SAMD
LABORER - LANDSCAPING$21.40$2.79$24.19SAMD
LABORER - LAYOUT$21.40$2.79$24.19SAMD
LABORER - LUTEMAN$21.40$2.79$24.19SAMD
LABORER - MASON TENDER$24.23$5.66$29.89SAMD
LABORER - MORTAR MIXER$21.40$2.79$24.19SAMD
LABORER - PIPELAYER$24.23$5.66$29.89SAMD
LABORER - PLASTERER - HANDLER$21.40$2.79$24.19SAMD
LABORER - SCAFFOLD BUILDER$24.23$5.66$29.89SAMD
LABORER - TAMPER$21.40$2.79$24.19SAMD
Mechanical Systems Service Tech- HVAC Systems$47.78$25.93$73.71SAMD
Mechanical Systems Service Tech- Refrigeration Systems$47.78$25.93$73.71SAMD
MILLWRIGHT$39.50$17.52$57.02SAMD
PAINTER$29.16$12.01$41.17SAMD
PLASTERER - MIXER$20.00$2.24$22.24SAMD
POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR$31.25$6.31$37.56SAMD
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER$31.30$7.33$38.63SAMD
POWER EQUIPMENT OPERATOR - BULLDOZER$33.38$13.92$47.30SAMD
POWER EQUIPMENT OPERATOR - CRANE$42.00$19.10$61.10SAMD
POWER EQUIPMENT OPERATOR - EXCAVATOR$33.38$13.92$47.30SAMD
POWER EQUIPMENT OPERATOR - FORKLIFT$35.18$15.12$50.30SAMD
POWER EQUIPMENT OPERATOR - GRADALL$33.00$3.05$36.05SAMD
POWER EQUIPMENT OPERATOR - GRADER$32.05$6.80$38.85SAMD
POWER EQUIPMENT OPERATOR - LOADER$33.38$13.92$47.30SAMD
POWER EQUIPMENT OPERATOR - MECHANIC$33.20$7.99$41.19SAMD
POWER EQUIPMENT OPERATOR - MILLING MACHINE$32.00$8.57$40.57SAMD
POWER EQUIPMENT OPERATOR - PAVER$33.38$13.92$47.30SAMD
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT$33.38$13.92$47.30SAMD
POWER EQUIPMENT OPERATOR - ROLLER - EARTH$27.80$13.92$41.72SAMD
POWER EQUIPMENT OPERATOR - SCRAPER$22.58$6.64$29.22SAMD
POWER EQUIPMENT OPERATOR - SCREED$30.25$7.52$37.77SAMD
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)$31.43$13.92$45.35SAMD
POWER EQUIPMENT OPERATOR-VACUUM TRUCK$38.60$15.75$54.35SAMD
RESILIENT FLOOR$35.10$15.33$50.43SAMD
ROOFER/WATERPROOFER$46.31$12.69$59.00SAMD
SHEETMETAL WORKER (including metal roofing)$50.92$24.61$75.53SAMD
STEAMFITTER/PIPEFITTER$47.78$25.93$73.71SAMD
TILE & TERRAZZO FINISHER$28.85$12.85$41.70SAMD
TILE & TERRAZZO MECHANIC$34.34$14.50$48.84SAMD
TRUCK DRIVER - DUMP$21.97$3.86$25.83SAMD
TRUCK DRIVER - DUMP - ARTICULATING$21.50$2.59$24.09SAMD
TRUCK DRIVER - WATER$27.00$4.87$31.87SAMD
SAMD2025-002 · SAMD, March 10, 2026
SPRINKLERFITTER$45.22$26.64$71.86SAMD

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2June 4, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MD20260122?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator