Prevailing wage rates: Harford County, Maryland
Building construction · MD20260117 modification 2, published June 4, 2026
The short answer
This sheet sets 78 classifications for building work in Harford County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $19.24 an hour (fireproofer - by hand) to $95.90 (elevator mechanic). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification. Of the 73 rates we can follow line by line from the first publication to today, 60 are higher and 13 are lower.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
June 4, 2026 · modification 2
60 rates raised, 13 rates lowered; 5 classifications added, 12 classifications removed
- Laborer: 17 raised and 9 lowered, by between $0.11 and $1.08 an hour
- Power equipment operator: 13 raised and 1 lowered, by between $1.50 and $6.90 an hour
- Ironworker: 4 rates raised by $1.50 to $10.89 an hour
- Truck driver: 3 rates raised by $0.50 to $14.29 an hour
- Carpenter: 2 rates raised by $1.59 an hour
- Balancing technician: 1 rate lowered by $28.50 an hour
- Bricklayer: 1 rate raised by $2.09 an hour
- Carpet layer: 1 rate raised by $1.45 an hour
- and 21 more trades
Every line that changed (73)
| Classification | Was | Now | Change |
|---|---|---|---|
| BALANCING TECHNICIANNew source: SAMD2024-037 replaced by SAMD2025-001 | $47.92 + $24.44 | $32.17 + $11.69 | −$28.50 (−39.4%) |
| BRICKLAYERNew source: SAMD2024-037 replaced by SAMD2025-001 | $37.50 + $14.78 | $38.80 + $15.57 | +$2.09 (+4.0%) |
| CARPENTERNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.41 + $14.49 | $35.89 + $14.60 | +$1.59 (+3.3%) |
| CARPENTER - SHORING SCAFFOLD BUILDERNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.41 + $14.49 | $35.89 + $14.60 | +$1.59 (+3.3%) |
| CARPET LAYERNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.12 + $14.86 | $35.10 + $15.33 | +$1.45 (+3.0%) |
| COMMUNICATION INSTALLER TECHNICIANNew source: SAMD2024-037 replaced by SAMD2025-001 | $36.37 + $12.89 | $33.35 + $17.63 | +$1.72 (+3.5%) |
| DRYWALL - SPACKLING, TAPING, & FINISHINGNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.41 + $14.49 | $35.89 + $14.60 | +$1.59 (+3.3%) |
| ELECTRICIANNew source: SAMD2024-037 replaced by SAMD2025-001 | $48.76 + $20.64 | $49.50 + $20.95 | +$1.05 (+1.5%) |
| ELEVATOR MECHANICNew source: SAMD2024-037 replaced by SAMD2025-001 | $56.36 + $45.50 | $88.34 + $7.56 | −$5.96 (−5.9%) |
| FIRESTOPPERNew source: SAMD2024-037 replaced by SAMD2025-001 | $29.81 + $10.08 | $30.21 + $10.68 | +$1.00 (+2.5%) |
| GLAZIERNew source: SAMD2024-037 replaced by SAMD2025-001 | $35.60 + $14.41 | $36.65 + $14.61 | +$1.25 (+2.5%) |
| INSULATION WORKERNew source: SAMD2024-037 replaced by SAMD2025-001 | $40.02 + $19.92 | $40.77 + $20.42 | +$1.25 (+2.1%) |
| IRONWORKER - FENCE ERECTORNew source: SAMD2024-037 replaced by SAMD2025-001 | $40.02 + $19.92 | $48.25 + $21.11 | +$9.42 (+15.7%) |
| IRONWORKER - ORNAMENTALNew source: SAMD2024-037 replaced by SAMD2025-001 | $31.17 + $24.38 | $39.30 + $27.14 | +$10.89 (+19.6%) |
| IRONWORKER - REINFORCINGNew source: SAMD2024-037 replaced by SAMD2025-001 | $29.20 + $23.57 | $30.18 + $24.09 | +$1.50 (+2.8%) |
| IRONWORKER - STRUCTURALNew source: SAMD2024-037 replaced by SAMD2025-001 | $35.58 + $26.21 | $37.60 + $27.13 | +$2.94 (+4.8%) |
| LABORER - AIR TOOL OPERATORNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - ASPHALT PAVERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - ASPHALT RAKERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - BLASTER - DYNAMITENew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - BURNERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - COMMONNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - CONCRETE PUDDLERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - CONCRETE SURFACERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - CONCRETE TENDERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - CONCRETE VIBRATORNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - DENSITY GAUGENew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - FIREPROOFER - MIXERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - FLAGGERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - GRADE CHECKERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - HAND ROLLERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - HAZARDOUS MATERIAL HANDLERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - JACKHAMMERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - LANDSCAPINGNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - LAYOUTNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - LUTEMANNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - MASON TENDERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - MORTAR MIXERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - PIPELAYERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - PLASTERER - HANDLERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| LABORER - SCAFFOLD BUILDERNew source: SAMD2024-037 replaced by SAMD2025-001 | $26.48 + $6.96 | $26.75 + $5.61 | −$1.08 (−3.2%) |
| LABORER - TAMPERNew source: SAMD2024-037 replaced by SAMD2025-001 | $27.83 + $6.59 | $27.32 + $7.21 | +$0.11 (+0.3%) |
| Mechanical Systems Service Tech- HVAC SystemsNew source: SAMD2024-037 replaced by SAMD2025-001 | $46.21 + $24.90 | $47.78 + $25.93 | +$2.60 (+3.7%) |
| Mechanical Systems Service Tech- Refrigeration SystemsNew source: SAMD2024-037 replaced by SAMD2025-001 | $52.27 + $24.58 | $55.00 + $25.30 | +$3.45 (+4.5%) |
| MILLWRIGHTNew source: SAMD2024-037 replaced by SAMD2025-001 | $38.61 + $17.21 | $39.50 + $17.52 | +$1.20 (+2.1%) |
| PAINTER-INDUSTRIALNew source: SAMD2024-037 replaced by SAMD2025-001 | $35.55 + $15.28 | $36.37 + $16.21 | +$1.75 (+3.4%) |
| PILEDRIVERNew source: SAMD2024-037 replaced by SAMD2025-001 | $36.60 + $16.78 | $37.74 + $17.64 | +$2.00 (+3.7%) |
| PLUMBERNew source: SAMD2024-037 replaced by SAMD2025-001 | $46.21 + $24.90 | $47.78 + $25.93 | +$2.60 (+3.7%) |
| POWER EQUIPMENT OPERATOR - BACKHOENew source: SAMD2024-037 replaced by SAMD2025-001 | $33.00 + $13.55 | $35.18 + $15.12 | +$3.75 (+8.1%) |
| POWER EQUIPMENT OPERATOR - BROOM / SWEEPERNew source: SAMD2024-037 replaced by SAMD2025-001 | $32.10 + $13.55 | $33.23 + $15.12 | +$2.70 (+5.9%) |
| POWER EQUIPMENT OPERATOR - BULLDOZERNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.18 + $14.62 | $35.18 + $15.12 | +$1.50 (+3.1%) |
| POWER EQUIPMENT OPERATOR - CONCRETE PUMPNew source: SAMD2024-037 replaced by SAMD2025-001 | $44.35 + $0.00 | $35.18 + $15.12 | +$5.95 (+13.4%) |
| POWER EQUIPMENT OPERATOR - CRANENew source: SAMD2024-037 replaced by SAMD2025-001 | $41.00 + $18.10 | $42.00 + $19.10 | +$2.00 (+3.4%) |
| POWER EQUIPMENT OPERATOR - CRANE - TOWERNew source: SAMD2024-037 replaced by SAMD2025-001 | $41.00 + $18.10 | $42.00 + $19.10 | +$2.00 (+3.4%) |
| POWER EQUIPMENT OPERATOR - DRILL - RIGNew source: SAMD2024-037 replaced by SAMD2025-001 | $33.16 + $14.15 | $35.18 + $15.12 | +$2.99 (+6.3%) |
| POWER EQUIPMENT OPERATOR - EXCAVATORNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.18 + $14.62 | $35.13 + $11.53 | −$2.14 (−4.4%) |
| POWER EQUIPMENT OPERATOR - FORKLIFTNew source: SAMD2024-037 replaced by SAMD2025-001 | $30.23 + $13.17 | $35.18 + $15.12 | +$6.90 (+15.9%) |
| POWER EQUIPMENT OPERATOR - LOADERNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.18 + $14.62 | $35.18 + $15.12 | +$1.50 (+3.1%) |
| POWER EQUIPMENT OPERATOR - MECHANICNew source: SAMD2024-037 replaced by SAMD2025-001 | $36.24 + $14.62 | $37.24 + $15.12 | +$1.50 (+2.9%) |
| POWER EQUIPMENT OPERATOR - ROLLER - EARTHNew source: SAMD2024-037 replaced by SAMD2025-001 | $28.60 + $14.62 | $29.60 + $15.12 | +$1.50 (+3.5%) |
| POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)New source: SAMD2024-037 replaced by SAMD2025-001 | $31.00 + $13.55 | $33.23 + $15.12 | +$3.80 (+8.5%) |
| POWER EQUIPMENT OPERATOR-VACUUM TRUCKNew source: SAMD2024-037 replaced by SAMD2025-001 | $37.50 + $14.85 | $38.60 + $15.75 | +$2.00 (+3.8%) |
| RESILIENT FLOORNew source: SAMD2024-037 replaced by SAMD2025-001 | $34.12 + $14.86 | $35.10 + $15.33 | +$1.45 (+3.0%) |
| ROOFER/WATERPROOFERNew source: SAMD2024-037 replaced by SAMD2025-001 | $52.21 + $14.91 | $34.76 + $14.91 | −$17.45 (−26.0%) |
| SHEETMETAL WORKER (including metal roofing)New source: SAMD2024-037 replaced by SAMD2025-001 | $47.92 + $24.44 | $50.92 + $24.61 | +$3.17 (+4.4%) |
| STEAMFITTER/PIPEFITTERNew source: SAMD2024-037 replaced by SAMD2025-001 | $46.21 + $24.90 | $47.78 + $25.93 | +$2.60 (+3.7%) |
| STONE MASONNew source: SAMD2024-037 replaced by SAMD2025-001 | $44.30 + $21.22 | $45.65 + $21.51 | +$1.64 (+2.5%) |
| TILE & TERRAZZO FINISHERNew source: SAMD2024-037 replaced by SAMD2025-001 | $28.09 + $12.59 | $28.85 + $12.85 | +$1.02 (+2.5%) |
| TILE & TERRAZZO MECHANICNew source: SAMD2024-037 replaced by SAMD2025-001 | $33.41 + $14.24 | $34.34 + $14.50 | +$1.19 (+2.5%) |
| TRUCK DRIVER - DUMPNew source: SAMD2024-037 replaced by SAMD2025-001 | $17.64 + $1.92 | $26.25 + $7.60 | +$14.29 (+73.1%) |
| TRUCK DRIVER - FLATBEDNew source: SAMD2024-037 replaced by SAMD2025-001 | $20.94 + $7.63 | $26.25 + $7.60 | +$5.28 (+18.5%) |
| TRUCK DRIVER - LOWBOYNew source: SAMD2024-037 replaced by SAMD2025-001 | $29.68 + $10.51 | $31.50 + $9.19 | +$0.50 (+1.2%) |
| POWER EQUIPMENT OPERATOR - ROLLER - ASPHALTNew source: SAMD2024-037 replaced by SAMD2025-002 | $32.10 + $13.55 | $33.10 + $14.05 | +$1.50 (+3.3%) |
Classifications added or removed
- Added: FIREPROOFER - BY HAND $17.00 + $2.24
- Added: FIREPROOFER - SPRAYER $29.70 + $7.48
- Added: PAINTER $29.16 + $12.01
- Added: PLASTERER - MIXER $20.00 + $2.24
- Added: SPRINKLERFITTER $45.85 + $28.23
- Removed: TRUCK DRIVER (TACK/TAR TRUCK)
- Removed: SPRINKLER FITTER
- Removed: POWER EQUIPMENT OPERATOR: SCREED
- Removed: POWER EQUIPMENT OPERATOR: MILLING MACHINE
- Removed: POWER EQUIPMENT OPERATOR (PAVER)
- Removed: POWER EQUIPMENT OPERATOR (GUARD RAIL POST DRIVER)
- Removed: POWER EQUIPMENT OPERATOR (GRADER)
- Removed: POWER EQUIPMENT OPERATOR (GRADALL)
- Removed: PAINTER (PAINTER)
- Removed: MECHANICAL SYSTEMS SERVICE TECH (PLUMBING SYSTEMS)
- Removed: MECHANICAL SYSTEMS SERVICE TECH (ELECTRICAL SYSTEMS)
- Removed: CEMENT MASON
Earlier modifications
May 18, 2026 · modification 1No rate changed (wording or notes only)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| SAMD2025-001 · SAMD, December 11, 2025 | |||||
| BALANCING TECHNICIAN | $32.17 | $11.69 | $43.86 | −$28.50 (−39.4%) | SAMD |
| BRICKLAYER | $38.80 | $15.57 | $54.37 | +$2.09 (+4.0%) | SAMD |
| CARPENTER | $35.89 | $14.60 | $50.49 | +$1.59 (+3.3%) | SAMD |
| CARPENTER - SHORING SCAFFOLD BUILDER | $35.89 | $14.60 | $50.49 | +$1.59 (+3.3%) | SAMD |
| CARPET LAYER | $35.10 | $15.33 | $50.43 | +$1.45 (+3.0%) | SAMD |
| COMMUNICATION INSTALLER TECHNICIAN | $33.35 | $17.63 | $50.98 | +$1.72 (+3.5%) | SAMD |
| DRYWALL - SPACKLING, TAPING, & FINISHING | $35.89 | $14.60 | $50.49 | +$1.59 (+3.3%) | SAMD |
| ELECTRICIAN | $49.50 | $20.95 | $70.45 | +$1.05 (+1.5%) | SAMD |
| ELEVATOR MECHANIC | $88.34 | $7.56 | $95.90 | −$5.96 (−5.9%) | SAMD |
| FIREPROOFER - BY HAND | $17.00 | $2.24 | $19.24 | — | SAMD |
| FIREPROOFER - SPRAYER | $29.70 | $7.48 | $37.18 | — | SAMD |
| FIRESTOPPER | $30.21 | $10.68 | $40.89 | +$1.00 (+2.5%) | SAMD |
| GLAZIER | $36.65 | $14.61 | $51.26 | +$1.25 (+2.5%) | SAMD |
| INSULATION WORKER | $40.77 | $20.42 | $61.19 | +$1.25 (+2.1%) | SAMD |
| IRONWORKER - FENCE ERECTOR | $48.25 | $21.11 | $69.36 | +$9.42 (+15.7%) | SAMD |
| IRONWORKER - ORNAMENTAL | $39.30 | $27.14 | $66.44 | +$10.89 (+19.6%) | SAMD |
| IRONWORKER - REINFORCING | $30.18 | $24.09 | $54.27 | +$1.50 (+2.8%) | SAMD |
| IRONWORKER - STRUCTURAL | $37.60 | $27.13 | $64.73 | +$2.94 (+4.8%) | SAMD |
| LABORER - AIR TOOL OPERATOR | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - ASPHALT PAVER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - ASPHALT RAKER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - BLASTER - DYNAMITE | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - BURNER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - COMMON | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - CONCRETE PUDDLER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - CONCRETE SURFACER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - CONCRETE TENDER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - CONCRETE VIBRATOR | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - DENSITY GAUGE | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - FIREPROOFER - MIXER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - FLAGGER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - GRADE CHECKER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - HAND ROLLER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - HAZARDOUS MATERIAL HANDLER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - JACKHAMMER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - LANDSCAPING | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - LAYOUT | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - LUTEMAN | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - MASON TENDER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - MORTAR MIXER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - PIPELAYER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - PLASTERER - HANDLER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| LABORER - SCAFFOLD BUILDER | $26.75 | $5.61 | $32.36 | −$1.08 (−3.2%) | SAMD |
| LABORER - TAMPER | $27.32 | $7.21 | $34.53 | +$0.11 (+0.3%) | SAMD |
| Mechanical Systems Service Tech- HVAC Systems | $47.78 | $25.93 | $73.71 | +$2.60 (+3.7%) | SAMD |
| Mechanical Systems Service Tech- Refrigeration Systems | $55.00 | $25.30 | $80.30 | +$3.45 (+4.5%) | SAMD |
| MILLWRIGHT | $39.50 | $17.52 | $57.02 | +$1.20 (+2.1%) | SAMD |
| PAINTER | $29.16 | $12.01 | $41.17 | — | SAMD |
| PAINTER-INDUSTRIAL | $36.37 | $16.21 | $52.58 | +$1.75 (+3.4%) | SAMD |
| PILEDRIVER | $37.74 | $17.64 | $55.38 | +$2.00 (+3.7%) | SAMD |
| PLASTERER - MIXER | $20.00 | $2.24 | $22.24 | — | SAMD |
| PLUMBER | $47.78 | $25.93 | $73.71 | +$2.60 (+3.7%) | SAMD |
| POWER EQUIPMENT OPERATOR - BACKHOE | $35.18 | $15.12 | $50.30 | +$3.75 (+8.1%) | SAMD |
| POWER EQUIPMENT OPERATOR - BROOM / SWEEPER | $33.23 | $15.12 | $48.35 | +$2.70 (+5.9%) | SAMD |
| POWER EQUIPMENT OPERATOR - BULLDOZER | $35.18 | $15.12 | $50.30 | +$1.50 (+3.1%) | SAMD |
| POWER EQUIPMENT OPERATOR - CONCRETE PUMP | $35.18 | $15.12 | $50.30 | +$5.95 (+13.4%) | SAMD |
| POWER EQUIPMENT OPERATOR - CRANE | $42.00 | $19.10 | $61.10 | +$2.00 (+3.4%) | SAMD |
| POWER EQUIPMENT OPERATOR - CRANE - TOWER | $42.00 | $19.10 | $61.10 | +$2.00 (+3.4%) | SAMD |
| POWER EQUIPMENT OPERATOR - DRILL - RIG | $35.18 | $15.12 | $50.30 | +$2.99 (+6.3%) | SAMD |
| POWER EQUIPMENT OPERATOR - EXCAVATOR | $35.13 | $11.53 | $46.66 | −$2.14 (−4.4%) | SAMD |
| POWER EQUIPMENT OPERATOR - FORKLIFT | $35.18 | $15.12 | $50.30 | +$6.90 (+15.9%) | SAMD |
| POWER EQUIPMENT OPERATOR - LOADER | $35.18 | $15.12 | $50.30 | +$1.50 (+3.1%) | SAMD |
| POWER EQUIPMENT OPERATOR - MECHANIC | $37.24 | $15.12 | $52.36 | +$1.50 (+2.9%) | SAMD |
| POWER EQUIPMENT OPERATOR - ROLLER - EARTH | $29.60 | $15.12 | $44.72 | +$1.50 (+3.5%) | SAMD |
| POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat) | $33.23 | $15.12 | $48.35 | +$3.80 (+8.5%) | SAMD |
| POWER EQUIPMENT OPERATOR-VACUUM TRUCK | $38.60 | $15.75 | $54.35 | +$2.00 (+3.8%) | SAMD |
| RESILIENT FLOOR | $35.10 | $15.33 | $50.43 | +$1.45 (+3.0%) | SAMD |
| ROOFER/WATERPROOFER | $34.76 | $14.91 | $49.67 | −$17.45 (−26.0%) | SAMD |
| SHEETMETAL WORKER (including metal roofing) | $50.92 | $24.61 | $75.53 | +$3.17 (+4.4%) | SAMD |
| STEAMFITTER/PIPEFITTER | $47.78 | $25.93 | $73.71 | +$2.60 (+3.7%) | SAMD |
| STONE MASON | $45.65 | $21.51 | $67.16 | +$1.64 (+2.5%) | SAMD |
| TILE & TERRAZZO FINISHER | $28.85 | $12.85 | $41.70 | +$1.02 (+2.5%) | SAMD |
| TILE & TERRAZZO MECHANIC | $34.34 | $14.50 | $48.84 | +$1.19 (+2.5%) | SAMD |
| TRUCK DRIVER - DUMP | $26.25 | $7.60 | $33.85 | +$14.29 (+73.1%) | SAMD |
| TRUCK DRIVER - FLATBED | $26.25 | $7.60 | $33.85 | +$5.28 (+18.5%) | SAMD |
| TRUCK DRIVER - LOWBOY | $31.50 | $9.19 | $40.69 | +$0.50 (+1.2%) | SAMD |
| SAMD2025-002 · SAMD, March 10, 2026 | |||||
| POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT | $33.10 | $14.05 | $47.15 | +$1.50 (+3.3%) | SAMD |
| SPRINKLERFITTER | $45.85 | $28.23 | $74.08 | — | SAMD |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | June 4, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MD20260117?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and MD20260117 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 78 classifications in 2 rate groups
- 0 from agreements, 0 from surveys
- Counties: Harford