CertifiedHours

Prevailing wage rates · Maryland · Wage determination

Prevailing wage rates: Worcester County, Maryland

Heavy, Highway construction · MD20260080 modification 2, published June 4, 2026

The short answer

This sheet sets 42 classifications for heavy, highway work in Worcester County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $21.28 an hour (power equipment operator - paver) to $61.10 (power equipment operator - crane). Your contract may lock an earlier modification.

Scope

Excludes Dredging

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification. Of the 30 rates we can follow line by line from the first publication to today, 27 are higher and 3 are lower.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

June 4, 2026 · modification 2

27 rates raised, 3 rates lowered; 12 classifications added, 7 classifications removed

  • Laborer: 17 rates raised by $7.44 an hour
  • Power equipment operator: 8 raised and 3 lowered, by between $2.00 and $24.27 an hour
  • Power equipment operator-vacuum truck: 1 rate raised by $2.00 an hour
  • Truck driver: 1 rate raised by $1.30 an hour
Every line that changed (30)
ClassificationWasNowChange
LABORER - ASPHALT RAKERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - COMMONNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - CONCRETE PUDDLERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - CONCRETE TENDERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - CONCRETE VIBRATORNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - DENSITY GAUGENew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - FIREPROOFER - MIXERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - FLAGGERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - GRADE CHECKERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - HAND ROLLERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - JACKHAMMERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - LANDSCAPINGNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - LAYOUTNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - LUTEMANNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - MORTAR MIXERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - PLASTERER - HANDLERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
LABORER - TAMPERNew source: SAMD2024-024 replaced by SAMD2025-001$20.12 + $1.75$24.58 + $4.73+$7.44 (+34.0%)
POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTORNew source: SAMD2024-024 replaced by SAMD2025-001$26.00 + $7.75$29.55 + $8.55+$4.35 (+12.9%)
POWER EQUIPMENT OPERATOR - CRANENew source: SAMD2024-024 replaced by SAMD2025-001$41.00 + $18.10$42.00 + $19.10+$2.00 (+3.4%)
POWER EQUIPMENT OPERATOR - EXCAVATORNew source: SAMD2024-024 replaced by SAMD2025-001$22.43 + $2.59$34.00 + $14.05+$23.03 (+92.0%)
POWER EQUIPMENT OPERATOR - GRADALLNew source: SAMD2024-024 replaced by SAMD2025-001$28.00 + $4.47$29.00 + $6.43+$2.96 (+9.1%)
POWER EQUIPMENT OPERATOR - LOADERNew source: SAMD2024-024 replaced by SAMD2025-001$20.95 + $2.83$34.00 + $14.05+$24.27 (+102.1%)
POWER EQUIPMENT OPERATOR - MILLING MACHINENew source: SAMD2024-024 replaced by SAMD2025-001$27.03 + $7.04$21.50 + $1.68−$10.89 (−32.0%)
POWER EQUIPMENT OPERATOR - PAVERNew source: SAMD2024-024 replaced by SAMD2025-001$23.75 + $5.17$20.00 + $1.28−$7.64 (−26.4%)
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALTNew source: SAMD2024-024 replaced by SAMD2025-001$24.44 + $4.09$28.00 + $3.44+$2.91 (+10.2%)
POWER EQUIPMENT OPERATOR - ROLLER - EARTHNew source: SAMD2024-024 replaced by SAMD2025-001$21.00 + $0.98$26.00 + $2.25+$6.27 (+28.5%)
POWER EQUIPMENT OPERATOR - SCREEDNew source: SAMD2024-024 replaced by SAMD2025-001$29.00 + $7.52$26.00 + $7.16−$3.36 (−9.2%)
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)New source: SAMD2024-024 replaced by SAMD2025-001$18.00 + $0.67$26.00 + $7.09+$14.42 (+77.2%)
POWER EQUIPMENT OPERATOR-VACUUM TRUCKNew source: SAMD2024-024 replaced by SAMD2025-001$37.50 + $14.85$38.60 + $15.75+$2.00 (+3.8%)
TRUCK DRIVER - DUMPNew source: SAMD2024-024 replaced by SAMD2025-001$23.75 + $4.43$25.01 + $4.47+$1.30 (+4.6%)
Classifications added or removed
  • Added: LABORER - AIR TOOL OPERATOR $31.57 + $8.81
  • Added: LABORER - ASPHALT PAVER $31.57 + $8.81
  • Added: LABORER - BLASTER - DYNAMITE $31.57 + $8.81
  • Added: LABORER - BURNER $31.57 + $8.81
  • Added: LABORER - CONCRETE SURFACER $31.57 + $8.81
  • Added: LABORER - HAZARDOUS MATERIAL HANDLER $31.57 + $8.81
  • Added: LABORER - MASON TENDER $31.57 + $8.81
  • Added: LABORER - PIPELAYER $31.57 + $8.81
  • Added: LABORER - SCAFFOLD BUILDER $31.57 + $8.81
  • Added: POWER EQUIPMENT OPERATOR - DRILL - RIG $34.00 + $14.05
  • Added: POWER EQUIPMENT OPERATOR - FORKLIFT $31.04 + $14.05
  • Added: POWER EQUIPMENT OPERATOR - MECHANIC $35.00 + $14.05
  • Removed: TRUCK DRIVER (WATER)
  • Removed: TRUCK DRIVER (TACK/TAR)
  • Removed: TRUCK DRIVER (LOWBOY)
  • Removed: TRUCK DRIVER (DUMP - ARTICULATING)
  • Removed: POWER EQUIPMENT OPERATOR: BACKHOE
  • Removed: POWER EQUIPMENT OPERATOR (BULLDOZER)
  • Removed: CARPENTER

Earlier modifications

  • May 18, 2026 · modification 1No rate changed (wording or notes only)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
SAMD2025-001 · SAMD, December 11, 2025
LABORER - AIR TOOL OPERATOR$31.57$8.81$40.38—SAMD
LABORER - ASPHALT PAVER$31.57$8.81$40.38—SAMD
LABORER - ASPHALT RAKER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - BLASTER - DYNAMITE$31.57$8.81$40.38—SAMD
LABORER - BURNER$31.57$8.81$40.38—SAMD
LABORER - COMMON$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - CONCRETE PUDDLER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - CONCRETE SURFACER$31.57$8.81$40.38—SAMD
LABORER - CONCRETE TENDER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - CONCRETE VIBRATOR$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - DENSITY GAUGE$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - FIREPROOFER - MIXER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - FLAGGER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - GRADE CHECKER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - HAND ROLLER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - HAZARDOUS MATERIAL HANDLER$31.57$8.81$40.38—SAMD
LABORER - JACKHAMMER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - LANDSCAPING$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - LAYOUT$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - LUTEMAN$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - MASON TENDER$31.57$8.81$40.38—SAMD
LABORER - MORTAR MIXER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - PIPELAYER$31.57$8.81$40.38—SAMD
LABORER - PLASTERER - HANDLER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
LABORER - SCAFFOLD BUILDER$31.57$8.81$40.38—SAMD
LABORER - TAMPER$24.58$4.73$29.31+$7.44 (+34.0%)SAMD
POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR$29.55$8.55$38.10+$4.35 (+12.9%)SAMD
POWER EQUIPMENT OPERATOR - CRANE$42.00$19.10$61.10+$2.00 (+3.4%)SAMD
POWER EQUIPMENT OPERATOR - DRILL - RIG$34.00$14.05$48.05—SAMD
POWER EQUIPMENT OPERATOR - EXCAVATOR$34.00$14.05$48.05+$23.03 (+92.0%)SAMD
POWER EQUIPMENT OPERATOR - FORKLIFT$31.04$14.05$45.09—SAMD
POWER EQUIPMENT OPERATOR - GRADALL$29.00$6.43$35.43+$2.96 (+9.1%)SAMD
POWER EQUIPMENT OPERATOR - LOADER$34.00$14.05$48.05+$24.27 (+102.1%)SAMD
POWER EQUIPMENT OPERATOR - MECHANIC$35.00$14.05$49.05—SAMD
POWER EQUIPMENT OPERATOR - MILLING MACHINE$21.50$1.68$23.18−$10.89 (−32.0%)SAMD
POWER EQUIPMENT OPERATOR - PAVER$20.00$1.28$21.28−$7.64 (−26.4%)SAMD
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT$28.00$3.44$31.44+$2.91 (+10.2%)SAMD
POWER EQUIPMENT OPERATOR - ROLLER - EARTH$26.00$2.25$28.25+$6.27 (+28.5%)SAMD
POWER EQUIPMENT OPERATOR - SCREED$26.00$7.16$33.16−$3.36 (−9.2%)SAMD
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)$26.00$7.09$33.09+$14.42 (+77.2%)SAMD
POWER EQUIPMENT OPERATOR-VACUUM TRUCK$38.60$15.75$54.35+$2.00 (+3.8%)SAMD
TRUCK DRIVER - DUMP$25.01$4.47$29.48+$1.30 (+4.6%)SAMD

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2June 4, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MD20260080?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MD20260080 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 42 classifications in 1 rate groups
  • 0 from agreements, 0 from surveys
  • Counties: Worcester