The short answer

This sheet sets 69 classifications for heavy, highway work in Prince George's County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $20.00 an hour (truck driver - flatbed) to $82.56 (electrician). Your contract may lock an earlier modification.

Scope

Excludes Dredging

What changed this year

First published January 2, 2026, this sheet is now on modification 3, and its rates have changed in 2 modifications. Of the 51 rates we can follow line by line from the first publication to today, 46 are higher and 5 are lower.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

September 28, 2026 · modification 3

Classification names reworded; 17 rates raised among the 68 lines we could match

  • Laborer: 17 rates raised by $13.53 an hour

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (17)
ClassificationWasNowChange
LABORER - ASPHALT RAKERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - COMMONNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - CONCRETE PUDDLERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - CONCRETE TENDERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - CONCRETE VIBRATORNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - DENSITY GAUGENew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - FIREPROOFER - MIXERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - FLAGGERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - GRADE CHECKERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - HAND ROLLERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - JACKHAMMERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - LANDSCAPINGNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - LAYOUTNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - LUTEMANNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - MORTAR MIXERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - PLASTERER - HANDLERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)
LABORER - TAMPERNew source: SAMD2025-002 replaced by SAMD2025-001$25.25 + $0.00$29.58 + $9.20+$13.53 (+53.6%)

Earlier modifications

  • June 4, 2026 · modification 229 rates raised, 22 rates lowered; 17 classifications added, 7 classifications removed
    • Laborer: 9 raised and 17 lowered, by between $1.03 and $9.35 an hour
    • Power equipment operator: 13 raised and 2 lowered, by between $1.50 and $20.81 an hour
    • Truck driver: 1 raised and 2 lowered, by between $7.15 and $15.25 an hour
    • Carpenter: 2 rates raised by $1.59 an hour
    • Bricklayer: 1 rate lowered by $28.28 an hour
    • Ironworker: 1 rate raised by $4.30 an hour
    • Painter: 1 rate raised by $1.75 an hour
    • Stone mason: 1 rate raised by $1.64 an hour
    • and 1 more trade
    Every line that changed (51)
    ClassificationWasNowChange
    BRICKLAYERNew source: SAMD2024-017 replaced by SAMD2025-001$37.50 + $14.78$24.00 + $0.00−$28.28 (−54.1%)
    CARPENTERNew source: SAMD2024-017 replaced by SAMD2025-001$34.41 + $14.49$35.89 + $14.60+$1.59 (+3.3%)
    CARPENTER - SHORING SCAFFOLD BUILDERNew source: SAMD2024-017 replaced by SAMD2025-001$34.41 + $14.49$35.89 + $14.60+$1.59 (+3.3%)
    IRONWORKER - STRUCTURALNew source: SAMD2024-017 replaced by SAMD2025-001$36.24 + $25.90$39.30 + $27.14+$4.30 (+6.9%)
    LABORER - AIR TOOL OPERATORNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - ASPHALT PAVERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - BLASTER - DYNAMITENew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - BURNERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - CONCRETE SURFACERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - HAZARDOUS MATERIAL HANDLERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - MASON TENDERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - PIPELAYERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    LABORER - SCAFFOLD BUILDERNew source: SAMD2024-017 replaced by SAMD2025-001$30.61 + $8.82$31.26 + $9.20+$1.03 (+2.6%)
    PAINTER - BRIDGENew source: SAMD2024-017 replaced by SAMD2025-001$44.18 + $16.08$45.00 + $17.01+$1.75 (+2.9%)
    POWER EQUIPMENT OPERATOR - BACKHOENew source: SAMD2024-017 replaced by SAMD2025-001$33.00 + $13.55$38.00 + $10.42+$1.87 (+4.0%)
    POWER EQUIPMENT OPERATOR - BROOM / SWEEPERNew source: SAMD2024-017 replaced by SAMD2025-001$24.88 + $7.00$28.95 + $6.63+$3.70 (+11.6%)
    POWER EQUIPMENT OPERATOR - BULLDOZERNew source: SAMD2024-017 replaced by SAMD2025-001$33.00 + $13.55$34.00 + $14.05+$1.50 (+3.2%)
    POWER EQUIPMENT OPERATOR - CRANENew source: SAMD2024-017 replaced by SAMD2025-001$28.10 + $7.00$45.49 + $10.42+$20.81 (+59.3%)
    POWER EQUIPMENT OPERATOR - DRILL - RIGNew source: SAMD2024-017 replaced by SAMD2025-001$33.00 + $13.55$34.00 + $14.05+$1.50 (+3.2%)
    POWER EQUIPMENT OPERATOR - EXCAVATORNew source: SAMD2024-017 replaced by SAMD2025-001$31.25 + $7.00$34.00 + $6.73+$2.48 (+6.5%)
    POWER EQUIPMENT OPERATOR - FORKLIFTNew source: SAMD2024-017 replaced by SAMD2025-001$30.04 + $13.55$31.04 + $14.05+$1.50 (+3.4%)
    POWER EQUIPMENT OPERATOR - LOADERNew source: SAMD2024-017 replaced by SAMD2025-001$25.62 + $7.00$29.00 + $0.00−$3.62 (−11.1%)
    POWER EQUIPMENT OPERATOR - MECHANICNew source: SAMD2024-017 replaced by SAMD2025-001$26.85 + $7.00$35.60 + $10.42+$12.17 (+36.0%)
    POWER EQUIPMENT OPERATOR - MILLING MACHINENew source: SAMD2024-017 replaced by SAMD2025-001$22.79 + $7.00$32.89 + $4.57+$7.67 (+25.7%)
    POWER EQUIPMENT OPERATOR - PAVERNew source: SAMD2024-017 replaced by SAMD2025-001$26.33 + $7.00$32.23 + $6.53+$5.43 (+16.3%)
    POWER EQUIPMENT OPERATOR - ROLLER - ASPHALTNew source: SAMD2024-017 replaced by SAMD2025-001$25.37 + $7.00$28.95 + $7.16+$3.74 (+11.6%)
    POWER EQUIPMENT OPERATOR - ROLLER - EARTHNew source: SAMD2024-017 replaced by SAMD2025-001$24.50 + $7.00$28.95 + $10.42+$7.87 (+25.0%)
    POWER EQUIPMENT OPERATOR - SCREEDNew source: SAMD2024-017 replaced by SAMD2025-001$25.70 + $7.00$29.23 + $16.48+$13.01 (+39.8%)
    POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)New source: SAMD2024-017 replaced by SAMD2025-001$30.04 + $13.55$25.00 + $0.00−$18.59 (−42.6%)
    STONE MASONNew source: SAMD2024-017 replaced by SAMD2025-001$44.30 + $21.22$45.65 + $21.51+$1.64 (+2.5%)
    TILE & TERRAZZO FINISHERNew source: SAMD2024-017 replaced by SAMD2025-001$28.09 + $12.59$28.85 + $12.85+$1.02 (+2.5%)
    TRUCK DRIVER - DUMPNew source: SAMD2024-017 replaced by SAMD2025-001$22.15 + $7.00$22.00 + $0.00−$7.15 (−24.5%)
    TRUCK DRIVER - FLATBEDNew source: SAMD2024-017 replaced by SAMD2025-001$22.36 + $7.84$20.00 + $0.00−$10.20 (−33.8%)
    TRUCK DRIVER - TACK/TAR TRUCKNew source: SAMD2024-017 replaced by SAMD2025-001$24.30 + $7.00$32.64 + $13.91+$15.25 (+48.7%)
    LABORER - ASPHALT RAKERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - COMMONNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - CONCRETE PUDDLERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - CONCRETE TENDERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - CONCRETE VIBRATORNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - DENSITY GAUGENew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - FIREPROOFER - MIXERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - FLAGGERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - GRADE CHECKERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - HAND ROLLERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - JACKHAMMERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - LANDSCAPINGNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - LAYOUTNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - LUTEMANNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - MORTAR MIXERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - PLASTERER - HANDLERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    LABORER - TAMPERNew source: SAMD2024-017 replaced by SAMD2025-002$25.78 + $8.82$25.25 + $0.00−$9.35 (−27.0%)
    Classifications added or removed
    • Added: CARPET LAYER $35.10 + $15.33
    • Added: CEMENT MASON $24.00 + $0.00
    • Added: ELECTRICIAN $59.50 + $23.06
    • Added: MILLWRIGHT $29.00 + $0.00
    • Added: PILEDRIVER $37.74 + $14.73
    • Added: PLUMBER $51.25 + $23.10
    • Added: POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR $33.25 + $1.32
    • Added: POWER EQUIPMENT OPERATOR - BOOM TRUCK $36.72 + $10.42
    • Added: POWER EQUIPMENT OPERATOR - GRADALL $38.44 + $5.61
    • Added: POWER EQUIPMENT OPERATOR- TRANSFER MACHINE OPERATOR $28.46 + $14.76
    • Added: POWER EQUIPMENT OPERATOR-VACUUM TRUCK $38.60 + $15.75
    • Added: RESILIENT FLOOR $35.10 + $15.33
    • Added: SPRINKLERFITTER $42.32 + $26.05
    • Added: TRUCK DRIVER - LOWBOY $24.75 + $2.00
    • Added: LINEWORKER/UNDERGROUND MECHANIC $31.51 + $9.75
    • Added: UNDERGROUND CABLE SPLICER $26.94 + $3.48
    • Added: UNDERGROUND GAS MECHANIC $31.65 + $9.17
    • Removed: TRUCK DRIVER (WATER)
    • Removed: TRUCK DRIVER (TRACTOR TRAILER)
    • Removed: TRUCK DRIVER (DUMP - ARTICULATING)
    • Removed: TILE & TERRAZZO MECHANIC
    • Removed: SPRINKLER FITTER
    • Removed: POWER EQUIPMENT OPERATOR (GUARD RAIL POST DRIVER)
    • Removed: POWER EQUIPMENT OPERATOR (CONCRETE PUMP)
  • May 18, 2026 · modification 1No rate changed (wording or notes only)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 3 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
SAMD2025-001 · SAMD, December 11, 2025
BRICKLAYER$24.00$0.00$24.00−$28.28 (−54.1%)SAMD
CARPENTER$35.89$14.60$50.49+$1.59 (+3.3%)SAMD
CARPENTER - SHORING SCAFFOLD BUILDER$35.89$14.60$50.49+$1.59 (+3.3%)SAMD
CARPET LAYER$35.10$15.33$50.43—SAMD
CEMENT MASON$24.00$0.00$24.00—SAMD
ELECTRICIAN$59.50$23.06$82.56—SAMD
IRONWORKER - STRUCTURAL$39.30$27.14$66.44+$4.30 (+6.9%)SAMD
LABORER - AIR TOOL OPERATOR$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - ASPHALT PAVER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - ASPHALT RAKER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - BLASTER - DYNAMITE$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - BURNER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - COMMON$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - CONCRETE PUDDLER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - CONCRETE SURFACER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - CONCRETE TENDER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - CONCRETE VIBRATOR$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - DENSITY GAUGE$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - FIREPROOFER - MIXER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - FLAGGER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - GRADE CHECKER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - HAND ROLLER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - HAZARDOUS MATERIAL HANDLER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - JACKHAMMER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - LANDSCAPING$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - LAYOUT$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - LUTEMAN$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - MASON TENDER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - MORTAR MIXER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - PIPELAYER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - PLASTERER - HANDLER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LABORER - SCAFFOLD BUILDER$31.26$9.20$40.46+$1.03 (+2.6%)SAMD
LABORER - TAMPER$29.58$9.20$38.78+$4.18 (+12.1%)SAMD
LINEWORKER/UNDERGROUND MECHANIC$31.51$9.75$41.26—SAMD
MILLWRIGHT$29.00$0.00$29.00—SAMD
PAINTER - BRIDGE$45.00$17.01$62.01+$1.75 (+2.9%)SAMD
PAINTER - INDUSTRIAL$32.88$14.33$47.21—SAMD
PILEDRIVER$37.74$14.73$52.47—SAMD
PLUMBER$51.25$23.10$74.35—SAMD
POWER EQUIPMENT OPERATOR - ASPHALT DISTRIBUTOR$33.25$1.32$34.57—SAMD
POWER EQUIPMENT OPERATOR - BACKHOE$38.00$10.42$48.42+$1.87 (+4.0%)SAMD
POWER EQUIPMENT OPERATOR - BOOM TRUCK$36.72$10.42$47.14—SAMD
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER$28.95$6.63$35.58+$3.70 (+11.6%)SAMD
POWER EQUIPMENT OPERATOR - BULLDOZER$34.00$14.05$48.05+$1.50 (+3.2%)SAMD
POWER EQUIPMENT OPERATOR - CRANE$45.49$10.42$55.91+$20.81 (+59.3%)SAMD
POWER EQUIPMENT OPERATOR - DRILL - RIG$34.00$14.05$48.05+$1.50 (+3.2%)SAMD
POWER EQUIPMENT OPERATOR - EXCAVATOR$34.00$6.73$40.73+$2.48 (+6.5%)SAMD
POWER EQUIPMENT OPERATOR - FORKLIFT$31.04$14.05$45.09+$1.50 (+3.4%)SAMD
POWER EQUIPMENT OPERATOR - GRADALL$38.44$5.61$44.05—SAMD
POWER EQUIPMENT OPERATOR - LOADER$29.00$0.00$29.00−$3.62 (−11.1%)SAMD
POWER EQUIPMENT OPERATOR - MECHANIC$35.60$10.42$46.02+$12.17 (+36.0%)SAMD
POWER EQUIPMENT OPERATOR - MILLING MACHINE$32.89$4.57$37.46+$7.67 (+25.7%)SAMD
POWER EQUIPMENT OPERATOR - PAVER$32.23$6.53$38.76+$5.43 (+16.3%)SAMD
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT$28.95$7.16$36.11+$3.74 (+11.6%)SAMD
POWER EQUIPMENT OPERATOR - ROLLER - EARTH$28.95$10.42$39.37+$7.87 (+25.0%)SAMD
POWER EQUIPMENT OPERATOR - SCREED$29.23$16.48$45.71+$13.01 (+39.8%)SAMD
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)$25.00$0.00$25.00−$18.59 (−42.6%)SAMD
POWER EQUIPMENT OPERATOR- TRANSFER MACHINE OPERATOR$28.46$14.76$43.22—SAMD
POWER EQUIPMENT OPERATOR-VACUUM TRUCK$38.60$15.75$54.35—SAMD
RESILIENT FLOOR$35.10$15.33$50.43—SAMD
SPRINKLERFITTER$42.32$26.05$68.37—SAMD
STONE MASON$45.65$21.51$67.16+$1.64 (+2.5%)SAMD
TILE & TERRAZZO FINISHER$28.85$12.85$41.70+$1.02 (+2.5%)SAMD
TRUCK DRIVER - DUMP$22.00$0.00$22.00−$7.15 (−24.5%)SAMD
TRUCK DRIVER - FLATBED$20.00$0.00$20.00−$10.20 (−33.8%)SAMD
TRUCK DRIVER - LOWBOY$24.75$2.00$26.75—SAMD
TRUCK DRIVER - TACK/TAR TRUCK$32.64$13.91$46.55+$15.25 (+48.7%)SAMD
UNDERGROUND CABLE SPLICER$26.94$3.48$30.42—SAMD
UNDERGROUND GAS MECHANIC$31.65$9.17$40.82—SAMD

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2June 4, 2026
Modification 3September 28, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MD20260044?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 3 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and MD20260044 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 69 classifications in 1 rate groups
  • 0 from agreements, 0 from surveys
  • Counties: Prince George's