CertifiedHours

Prevailing wage rates · Maryland · Wage determination

Prevailing wage rates: Howard County, Maryland

Heavy, Highway construction · MD20260041 modification 2, published June 4, 2026

The short answer

This sheet sets 64 classifications for heavy, highway work in Howard County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $21.00 an hour (truck driver - flatbed) to $67.16 (stone mason). Your contract may lock an earlier modification.

Scope

Excludes Dredging

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SAMD2025-001 · SAMD, December 11, 2025
BRICKLAYER$38.80$15.57$54.37SAMD
CARPENTER$35.89$14.60$50.49SAMD
CARPENTER - SHORING SCAFFOLD BUILDER$35.89$14.60$50.49SAMD
CEMENT MASON$24.00$0.00$24.00SAMD
ELECTRICIAN$36.84$19.62$56.46SAMD
IRONWORKER - STRUCTURAL$38.00$23.96$61.96SAMD
MILLWRIGHT$39.50$17.52$57.02SAMD
PAINTER - BRIDGE$45.00$17.01$62.01SAMD
PILEDRIVER$37.74$14.73$52.47SAMD
POWER EQUIPMENT OPERATOR - BACKHOE$34.00$14.05$48.05SAMD
POWER EQUIPMENT OPERATOR - BROOM / SWEEPER$31.04$14.05$45.09SAMD
POWER EQUIPMENT OPERATOR - BULLDOZER$34.00$14.05$48.05SAMD
POWER EQUIPMENT OPERATOR - CONCRETE PUMP$34.00$14.05$48.05SAMD
POWER EQUIPMENT OPERATOR - CRANE$42.00$19.10$61.10SAMD
POWER EQUIPMENT OPERATOR - DRILL - RIG$34.00$14.05$48.05SAMD
POWER EQUIPMENT OPERATOR - EXCAVATOR$34.00$14.05$48.05SAMD
POWER EQUIPMENT OPERATOR - FORKLIFT$31.04$14.05$45.09SAMD
POWER EQUIPMENT OPERATOR - GRADALL$35.00$14.05$49.05SAMD
POWER EQUIPMENT OPERATOR - GRADER$35.00$14.05$49.05SAMD
POWER EQUIPMENT OPERATOR - LOADER$34.00$14.05$48.05SAMD
POWER EQUIPMENT OPERATOR - MECHANIC$35.00$14.05$49.05SAMD
POWER EQUIPMENT OPERATOR - MILLING MACHINE$28.26$2.15$30.41SAMD
POWER EQUIPMENT OPERATOR - PAVER$21.00$1.46$22.46SAMD
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT$29.63$5.82$35.45SAMD
POWER EQUIPMENT OPERATOR - ROLLER - EARTH$31.04$14.05$45.09SAMD
POWER EQUIPMENT OPERATOR - SCREED$29.23$16.48$45.71SAMD
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)$31.04$14.05$45.09SAMD
POWER EQUIPMENT OPERATOR-VACUUM TRUCK$38.60$15.75$54.35SAMD
STONE MASON$45.65$21.51$67.16SAMD
TILE & TERRAZZO FINISHER$28.85$12.85$41.70SAMD
TRUCK DRIVER - DUMP$29.15$5.20$34.35SAMD
TRUCK DRIVER - FLATBED$21.00$0.00$21.00SAMD
TRUCK DRIVER - LOWBOY$24.75$2.00$26.75SAMD
TRUCK DRIVER - TACK/TAR TRUCK$32.64$13.91$46.55SAMD
TRUCK DRIVER - WATER$25.00$0.00$25.00SAMD
SAMD2025-002 · SAMD, March 10, 2026
LABORER - AIR TOOL OPERATOR$28.92$7.30$36.22SAMD
LABORER - ASPHALT PAVER$28.92$7.30$36.22SAMD
LABORER - ASPHALT RAKER$34.32$9.10$43.42SAMD
LABORER - BLASTER - DYNAMITE$28.92$7.30$36.22SAMD
LABORER - BURNER$28.92$7.30$36.22SAMD
LABORER - COMMON$34.32$9.10$43.42SAMD
LABORER - CONCRETE PUDDLER$34.32$9.10$43.42SAMD
LABORER - CONCRETE SURFACER$28.92$7.30$36.22SAMD
LABORER - CONCRETE TENDER$34.32$9.10$43.42SAMD
LABORER - CONCRETE VIBRATOR$34.32$9.10$43.42SAMD
LABORER - DENSITY GAUGE$34.32$9.10$43.42SAMD
LABORER - FIREPROOFER - MIXER$34.32$9.10$43.42SAMD
LABORER - FLAGGER$34.32$9.10$43.42SAMD
LABORER - GRADE CHECKER$34.32$9.10$43.42SAMD
LABORER - HAND ROLLER$34.32$9.10$43.42SAMD
LABORER - HAZARDOUS MATERIAL HANDLER$28.92$7.30$36.22SAMD
LABORER - JACKHAMMER$34.32$9.10$43.42SAMD
LABORER - LANDSCAPING$34.32$9.10$43.42SAMD
LABORER - LAYOUT$34.32$9.10$43.42SAMD
LABORER - LUTEMAN$34.32$9.10$43.42SAMD
LABORER - MASON TENDER$28.92$7.30$36.22SAMD
LABORER - MORTAR MIXER$34.32$9.10$43.42SAMD
LABORER - PIPELAYER$28.92$7.30$36.22SAMD
LABORER - PLASTERER - HANDLER$34.32$9.10$43.42SAMD
LABORER - SCAFFOLD BUILDER$28.92$7.30$36.22SAMD
LABORER - TAMPER$34.32$9.10$43.42SAMD
LINEWORKER/UNDERGROUND MECHANIC$29.81$5.22$35.03SAMD
UNDERGROUND CABLE SPLICER$34.00$15.00$49.00SAMD
UNDERGROUND GAS MECHANIC$28.79$6.62$35.41SAMD

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2June 4, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MD20260041?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Howard County, Maryland (Heavy, Highway) · MD20260041 Mod 2 · CertifiedHours