CertifiedHours

Prevailing wage rates · Maryland · Wage determination

Prevailing wage rates: Charles County, Maryland

Heavy, Highway construction · MD20260036 modification 2, published June 4, 2026

The short answer

This sheet sets 32 classifications for heavy, highway work in Charles County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $26.05 an hour (power equipment operator - roller - asphalt) to $75.53 (sheetmetal worker (including metal roofing)). Your contract may lock an earlier modification.

Scope

Excludes Dredging

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SAMD2025-001 · SAMD, December 11, 2025
LABORER - ASPHALT RAKER$23.85$3.63$27.48SAMD
LABORER - COMMON$23.85$3.63$27.48SAMD
LABORER - CONCRETE PUDDLER$23.85$3.63$27.48SAMD
LABORER - CONCRETE TENDER$23.85$3.63$27.48SAMD
LABORER - CONCRETE VIBRATOR$23.85$3.63$27.48SAMD
LABORER - DENSITY GAUGE$23.85$3.63$27.48SAMD
LABORER - FIREPROOFER - MIXER$23.85$3.63$27.48SAMD
LABORER - FLAGGER$23.85$3.63$27.48SAMD
LABORER - GRADE CHECKER$23.85$3.63$27.48SAMD
LABORER - HAND ROLLER$23.85$3.63$27.48SAMD
LABORER - JACKHAMMER$23.85$3.63$27.48SAMD
LABORER - LANDSCAPING$23.85$3.63$27.48SAMD
LABORER - LAYOUT$23.85$3.63$27.48SAMD
LABORER - LUTEMAN$23.85$3.63$27.48SAMD
LABORER - MORTAR MIXER$23.85$3.63$27.48SAMD
LABORER - PLASTERER - HANDLER$23.85$3.63$27.48SAMD
LABORER - TAMPER$23.85$3.63$27.48SAMD
POWER EQUIPMENT OPERATOR - CRANE$42.00$19.10$61.10SAMD
POWER EQUIPMENT OPERATOR - MILLING MACHINE$27.00$4.77$31.77SAMD
POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT$21.45$4.60$26.05SAMD
POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat)$27.85$8.28$36.13SAMD
SHEETMETAL WORKER (including metal roofing)$50.92$24.61$75.53SAMD
TRUCK DRIVER - DUMP$30.45$4.16$34.61SAMD
SAMD2025-002 · SAMD, March 10, 2026
LABORER - AIR TOOL OPERATOR$25.08$5.27$30.35SAMD
LABORER - ASPHALT PAVER$25.08$5.27$30.35SAMD
LABORER - BLASTER - DYNAMITE$25.08$5.27$30.35SAMD
LABORER - BURNER$25.08$5.27$30.35SAMD
LABORER - CONCRETE SURFACER$25.08$5.27$30.35SAMD
LABORER - HAZARDOUS MATERIAL HANDLER$25.08$5.27$30.35SAMD
LABORER - MASON TENDER$25.08$5.27$30.35SAMD
LABORER - PIPELAYER$25.08$5.27$30.35SAMD
LABORER - SCAFFOLD BUILDER$25.08$5.27$30.35SAMD

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2June 4, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MD20260036?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Charles County, Maryland (Heavy, Highway) · MD20260036 Mod 2 · CertifiedHours