Prevailing wage rates · Maryland · Wage determination
Prevailing wage rates: Calvert County, Maryland
Heavy, Highway construction · MD20260032 modification 3, published September 28, 2026
The short answer
This sheet sets 36 classifications for heavy, highway work in Calvert County, Maryland. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $16.46 an hour (laborer - asphalt raker) to $75.53 (sheetmetal worker (including metal roofing)). Your contract may lock an earlier modification.
Scope
Excludes Dredging
What changed this year
First published January 2, 2026, this sheet is now on modification 3, and its rates have changed in 1 modification. Of the 27 rates we can follow line by line from the first publication to today, 1 is higher and 26 are lower.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
September 28, 2026 · modification 3
Classification names reworded; no change among the 32 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Earlier modifications
June 4, 2026 · modification 21 rate raised, 26 rates lowered; 5 classifications added, 8 classifications removed
- Laborer: 26 rates lowered by $3.33 to $6.34 an hour
- Power equipment operator: 1 rate raised by $2.00 an hour
Every line that changed (27)
Classification Was Now Change LABORER - ASPHALT RAKERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - COMMONNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - CONCRETE PUDDLERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - CONCRETE TENDERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - CONCRETE VIBRATORNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - DENSITY GAUGENew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - FIREPROOFER - MIXERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - FLAGGERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - GRADE CHECKERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - HAND ROLLERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - JACKHAMMERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - LANDSCAPINGNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - LAYOUTNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - LUTEMANNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - MORTAR MIXERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - PLASTERER - HANDLERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) LABORER - TAMPERNew source: SAMD2024-005 replaced by SAMD2025-001 $21.88 + $0.92 $16.12 + $0.34 −$6.34 (−27.8%) POWER EQUIPMENT OPERATOR - CRANENew source: SAMD2024-005 replaced by SAMD2025-001 $41.00 + $18.10 $42.00 + $19.10 +$2.00 (+3.4%) LABORER - AIR TOOL OPERATORNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - ASPHALT PAVERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - BLASTER - DYNAMITENew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - BURNERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - CONCRETE SURFACERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - HAZARDOUS MATERIAL HANDLERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - MASON TENDERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - PIPELAYERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) LABORER - SCAFFOLD BUILDERNew source: SAMD2024-005 replaced by SAMD2025-002 $25.19 + $8.49 $25.08 + $5.27 −$3.33 (−9.9%) Classifications added or removed
- Added: POWER EQUIPMENT OPERATOR - MILLING MACHINE $27.00 + $4.77
- Added: POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT $21.45 + $4.60
- Added: POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat) $27.85 + $8.28
- Added: SHEETMETAL WORKER (including metal roofing) $50.92 + $24.61
- Added: TRUCK DRIVER - DUMP $30.45 + $4.16
- Removed: TRUCK DRIVER (TANDEM)
- Removed: TRUCK DRIVER (TACK/TAR TRUCK)
- Removed: TRUCK DRIVER (LOWBOY)
- Removed: POWER EQUIPMENT OPERATOR: EXCAVATOR
- Removed: POWER EQUIPMENT OPERATOR: BACKHOE
- Removed: POWER EQUIPMENT OPERATOR (BOOM TRUCK)
- Removed: MILLWRIGHT
- Removed: INSULATION WORKER
May 18, 2026 · modification 1No rate changed (wording or notes only)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 3 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| SAMD2025-001 · SAMD, December 11, 2025 | |||||
| LABORER - AIR TOOL OPERATOR | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - ASPHALT PAVER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - ASPHALT RAKER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - BLASTER - DYNAMITE | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - BURNER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - COMMON | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - CONCRETE PUDDLER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - CONCRETE SURFACER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - CONCRETE TENDER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - CONCRETE VIBRATOR | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - DENSITY GAUGE | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - FIREPROOFER - MIXER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - FLAGGER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - GRADE CHECKER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - HAND ROLLER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - HAZARDOUS MATERIAL HANDLER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - JACKHAMMER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - LANDSCAPING | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - LAYOUT | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - LUTEMAN | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - MASON TENDER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - MORTAR MIXER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - PIPELAYER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - PLASTERER - HANDLER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| LABORER - SCAFFOLD BUILDER | $25.08 | $5.27 | $30.35 | −$3.33 (−9.9%) | SAMD |
| LABORER - TAMPER | $16.12 | $0.34 | $16.46 | −$6.34 (−27.8%) | SAMD |
| POWER EQUIPMENT OPERATOR - BROOM / SWEEPER | $29.33 | $10.29 | $39.62 | — | SAMD |
| POWER EQUIPMENT OPERATOR - CRANE | $42.00 | $19.10 | $61.10 | +$2.00 (+3.4%) | SAMD |
| POWER EQUIPMENT OPERATOR - MILLING MACHINE | $27.00 | $4.77 | $31.77 | — | SAMD |
| POWER EQUIPMENT OPERATOR - PAVER | $31.52 | $4.77 | $36.29 | — | SAMD |
| POWER EQUIPMENT OPERATOR - ROLLER - ASPHALT | $21.45 | $4.60 | $26.05 | — | SAMD |
| POWER EQUIPMENT OPERATOR - SCREED | $28.96 | $9.79 | $38.75 | — | SAMD |
| POWER EQUIPMENT OPERATOR - SKID STEER (Bobcat) | $27.85 | $8.28 | $36.13 | — | SAMD |
| POWER EQUIPMENT OPERATOR - TRANSFER MACHINE | $33.05 | $14.18 | $47.23 | — | SAMD |
| SHEETMETAL WORKER (including metal roofing) | $50.92 | $24.61 | $75.53 | — | SAMD |
| TRUCK DRIVER - DUMP | $30.45 | $4.16 | $34.61 | — | SAMD |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | June 4, 2026 |
| Modification 3 | September 28, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MD20260032?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 3 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and MD20260032 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 36 classifications in 1 rate groups
- 0 from agreements, 0 from surveys
- Counties: Calvert