Prevailing wage rates · Massachusetts · Wage determination
Prevailing wage rates: Barnstable, Bristol, Dukes and 6 more counties, Massachusetts
Heavy construction · MA20260008 modification 1, published May 18, 2026
The short answer
This sheet sets 120 classifications for heavy work in Barnstable, Bristol, Dukes and 6 more counties, Massachusetts. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $44.83 an hour (line construction: groundman a.) to $113.58 (diver). Your contract may lock an earlier modification.
Scope
Heavy and Marine Construction Projects
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0029-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $50.62 | $28.82 | $79.44 | Agreement |
| BRMA0001-011 · Bricklayers agreement, February 1, 2023 | ||||
BRICKLAYER/CEMENT MASON…Full textBRICKLAYER/CEMENT MASON (FOXBORO CHAPTER BRISTOL (ATTLEBORO, BERKLEY, DIGHTON, MANSFIELD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, TAUNTON); NORFOLK, (BELLINGHAM, CANTON, DEDHAM, FOXBORO, FRANKLIN, NORFOLK, NORWOOD, PLAINVILLE, SHARON, WALPOLE, WESTRWOOD, WRENTHAM); AND PLYMOUTH (LAKEVILLE)) | $60.35 | $34.40 | $94.75 | Agreement |
| BRMA0001-012 · Bricklayers agreement, February 1, 2023 | ||||
BRICKLAYER (LOWELL CHAPTER MIDDLESEX…Full textBRICKLAYER (LOWELL CHAPTER MIDDLESEX (ACTON, ASHBY, AYER, BEDFORD, BILLERICA, BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTABALE, FT DEVENS, GROTON, LITTLETON, LOWELL, NORTH ACTON, PEPPERELL, SHIRLEY, SOUTH ACTON, TEWKSBURY, TOWNSEND, TYNGSBORO, WEST ACTON, WESTFORD, WILMINGTON)) | $58.21 | $33.71 | $91.92 | Agreement |
| BRMA0001-013 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER (LOWELL CHAPTER MIDDLESEX…Full textBRICKLAYER (LOWELL CHAPTER MIDDLESEX (ASHLAND, FRAMINGHAM, HOLLISTON, HOPKINTON, HUDSON, MAYNARD, NATICK, SHERBVORN, STOW); AND NORFOLK (MEDFIELD, MEDWAY, MILLIS)) | $62.40 | $34.40 | $96.80 | Agreement |
| BRMA0003-001 · Bricklayers agreement, August 1, 2024 | ||||
| TERRAZZO FINISHER | $63.44 | $37.33 | $100.77 | Agreement |
| MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 | $102.03 | Agreement |
| MARBLE & TILE FINISHER | $49.32 | $35.26 | $84.58 | Agreement |
| BRMA0003-003 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER (BOSTON CHAPTER MIDDLESEX…Full textBRICKLAYER (BOSTON CHAPTER MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, SOMERVILLE); NORFOLK (BROOKLINE, MILTON); AND SUFFOLK) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-011 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER/CEMENT MASON…Full textBRICKLAYER/CEMENT MASON (LYNN CHAPTER ESSEX (AMESBURY, ANDOVER, BEVERLY, BOXFORD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEN, MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALISBURY, SALEM, SAUGUS, SWAMPSCOTT, TOPSFIELD, WAKEFIELD, WENHAM, WEST NEWBURY); AND MIDDLESEX (NORTH READING, READING, WAKEFIELD)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-012 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER (WALTHAM CHAPTER - MIDDLESEX…Full textBRICKLAYER (WALTHAM CHAPTER - MIDDLESEX (BELMONT, BURLINGTON, CONCORD, LEXINGTON, LINCOLN, STONEHAM, SUDBURY, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-014 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER/CEMENT MASON…Full textBRICKLAYER/CEMENT MASON (QUINCY CHAPTER PLYMOUTH COUNTY (ABINGTON, BRIDGEWATER, BROCKTON, CARVER, DUXBURY, EAST BRIDGEWATER, HALIFAX, HANOVER, HANSON, HINGHAM, HULL, KINGSTON, MARSHFIELD, MIDDLEBORO, NORWELL, PEMBROKE, PLYMOUTH, ROCKLAND, SCITUATE, WEST BRIDGEWATER, WHITMAN)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-025 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER/CEMENT MASON…Full textBRICKLAYER/CEMENT MASON (NEW BEDFORD CHAPTER BARNSTABLE; BRISTOL (ACUSHNET, DARMOUTH, FAIRHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD, SOMERSET, SWANSEA, WESTPORT); DUKES; NANTUCKET; PLYMOUTH (MARION, MATTAPOISETT, ROCHESTER, WAREHAM)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-033 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER, PLASTERER…Full textBRICKLAYER, PLASTERER (NEWTON CHAPTER MIDDLESEX (NEWTON); NORFOLK (DOVER, NEEDHAM, WELLESLEY)) | $64.50 | $37.54 | $102.04 | Agreement |
| CARP0056-001 · Carpenters agreement, August 1, 2024 | ||||
PILEDRIVERMAN (ALL OF SUFFOLK COUNTY…Full textPILEDRIVERMAN (ALL OF SUFFOLK COUNTY; AND THOSE AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, AND PLYMOUTH COUNTIES SITUATED INSIDE BOSTON BELTWAY (I-495) AND NORTH OF CAPE COD CANAL. ALL OF DUKES AND NANTUCKET COUNTIES) | $55.79 | $35.47 | $91.26 | Agreement |
| CARP0056-002 · Carpenters agreement, August 1, 2024 | ||||
Group definitions, zones and premiums for CARP0056-002PILEDRIVERMAN (THE AREAS OF BARNSTABLE, BRISTOL, PLYMOUTH, AND NORFOLK COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495) AND SOUTH OF CAPE COD CANAL).$ 51.97 35.47 | ||||
| CARP0056-003 · Carpenters agreement, August 1, 2024 | ||||
PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY…Full textPILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495)) | $49.19 | $35.47 | $84.66 | Agreement |
| CARP0056-004 · Carpenters agreement, August 1, 2024 | ||||
| DIVER TENDER | $61.70 | $35.47 | $97.17 | Agreement |
| DIVER | $78.11 | $35.47 | $113.58 | Agreement |
| CARP0327-002 · Carpenters agreement, September 1, 2025 | ||||
CARPENTER (MIDDLESEX…Full textCARPENTER (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE, DEDHAM, MILTON); AND SUFFOLK COUNTIES) | $61.19 | $31.55 | $92.74 | Agreement |
| CARP0339-002 · Carpenters agreement, September 1, 2025 | ||||
CARPENTER (BRISTOL…Full textCARPENTER (BRISTOL (ATTLEBOROUGH, NORTH ATTLEBOROUGH); ESSEX; MIDDLESEX (EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); AND NORFOLK (BELLINGHAM, BRAINTREE, CANTON, COHASSETT, FOXBORO, FRANKLIN, MEDFIELD, MEDWAY, MILLIS, NEEDHAM, NORFOLK, NORWOOD, PLAINVILLE, QUINCY, SHARON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH, WRENTHAM) COUNTIES) | $50.10 | $31.45 | $81.55 | Agreement |
| CARP0346-001 · Carpenters agreement, September 1, 2025 | ||||
CARPENTER (NORFOLK…Full textCARPENTER (NORFOLK (BRAINTREE, QUINCY, COHASSET, WEYMOUTH, ETC.) PLYMOUTH (DUXBURY, HANOVER, HULL, HINGHAM, MARSHFIELD, NORWELL, PEMBROKE ROCKLAND, SCITUATE)) | $50.10 | $31.45 | $81.55 | Agreement |
| CARP0624-002 · Carpenters agreement, September 1, 2017 | ||||
| CARPENTER (DUKES; NANTUCKET) | $46.43 | $28.35 | $74.78 | Agreement |
| CARP0624-006 · Carpenters agreement, September 1, 2017 | ||||
CARPENTER (BARNSTABLE…Full textCARPENTER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO & NORTH ATTLEBORO); NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON); PLYMOUTH (BRIDGEWATER, KINGSTON, LAKEVILLE, MIDDLEBORO, PLYMOUTH, S. HANOVER, WHITMAN)) | $39.28 | $27.90 | $67.18 | Agreement |
| CARP1121-001 · Carpenters agreement, April 21, 2025 | ||||
| MILLWRIGHT (SUFFOLK COUNTY) | $50.47 | $33.50 | $83.97 | Agreement |
| CARP1121-005 · Carpenters agreement, April 21, 2025 | ||||
MILLWRIGHT (BARNSTABLE…Full textMILLWRIGHT (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET, NORFOLK AND PLYMOUTH COUNTIES) | $45.03 | $33.25 | $78.28 | Agreement |
| ELEC0096-001 · Electrical Workers (IBEW) agreement, September 7, 2025 | ||||
TELEDATA SYSTEM INSTALLER…Full textTELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND)) | $36.12 | $34.51 | $70.63 | Agreement |
ELECTRICIAN (MIDDLESEX…Full textELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND)) | $48.16 | $36.20 | $84.36 | Agreement |
| ELEC0099-001 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| TELEDATA SYSTEM INSTALLER (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK)) | $42.09 | $19.71 | $61.80 | Agreement |
| ELECTRICIAN (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK)) | $56.11 | $24.74 | $80.85 | Agreement |
| ELEC0103-002 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (ESSEX…Full textELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD, GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE, MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY); MIDDLESEX (BEDFORD, BILLERICA, BOXBORO, BURLINGTON, CARLISLE, CHELMSFORD, DRACUT, DUNSTABLE LITTLETON, LOWELL, NORTH READING, TEWKSBURY, TYNGSBORO, WESTFORD, WILMINGTON)) | $66.17 | $37.08 | $103.25 | Agreement |
| ELEC0103-004 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (ESSEX…Full textELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX, GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER, MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM, TOPSFIELD, WENHAM)) | $66.17 | $37.08 | $103.25 | Agreement |
| ELEC0103-005 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (ESSEX…Full textELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, READING, SHERBORN, SOMERVILLE, STONEHAM, SUDBURY, WAKEFIELD, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, FRANKLOIN, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWO | $66.17 | $37.08 | $103.25 | Agreement |
| ELEC0104-001 · Electrical Workers (IBEW) agreement, September 1, 2024 | ||||
| LINE CONSTRUCTION: LINEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 | Agreement |
| LINE CONSTRUCTION: GROUNDMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $32.13 | $12.70 | $44.83 | Agreement |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $49.65 | $26.72 | $76.37 | Agreement |
| LINE CONSTRUCTION: CABLEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 | Agreement |
| ELEC0223-002 · Electrical Workers (IBEW) agreement, September 1, 2024 | ||||
ELECTRICIAN (BARNSTABLE…Full textELECTRICIAN (BARNSTABLE, BRISTOL (EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET; PLYMOUTH (EXCEPT HINGHAM AND HULL TWPS); NORFOLK (AVON, HALBROOK, RANDOLPH, SLOUGHTON)) | $50.02 | $31.05 | $81.07 | Agreement |
| ENGI0004-009 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATORS: GROUP 6…Full textPOWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $30.85 | $33.70 | $64.55 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 5…Full textPOWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $25.02 | $33.70 | $58.72 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 4…Full textPOWER EQUIPMENT OPERATORS: GROUP 4 ASSITANT ENGINEER (FIREMAN) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $46.52 | $33.70 | $80.22 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 3…Full textPOWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINES (1-3 GROUPED); GENERATOR; SIGHTING PLANT; HEATERS (POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR STEAM, CONVEYOR, WELLPOINT SYSTEM (OPERATING) HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $37.02 | $33.70 | $70.72 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; BULLDOZER; TRACTOR; MECHANIC - MAINTENANCE; YORK RAKE; MULCHING MACHINE; PAVING SCREED MACHINE;STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING MACHINE; GROUT PUMP; PORTABLE STEAM BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; ASPHALT PAVER; LOCOMOTIVES OR MACHINES USED IN PLACE THEREOF; TAMPER (SELF PROPELLED OR TRACTOR-DRAW); CAL TRACKS; BALLAST REGULATOR;RAIL ANCHOR MACHINE; SWITCH TAMPER; TIRE TRUCK HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.18 | $33.70 | $90.88 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1 POWER SHOVEL; CRANE; TRUCK CRANE; DERRICK; PILE DRIVER; TRENCHING MACHINE; MECHANICAL HOIST PAVEMENT BREAKER; CEMENT CONCRETE PAVER; DRAGLINE; HOISTING ENGINE; THREE DRUM MACHINE; PUMPCRETE MACHINE; LOADERS; SHOVEL DOZER; FRONT END LOADER; MUCKING MACHINE; SHAFT HOIST; STEAM ENGINE; BACKHOE; GRADALL; CABLE WAY; FORK LIFT; CHERRY PICKER; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; POST HOLE DIGGER; ASPHALT PLANT ON JOB SITE; CONCRETE BATCHING AND/OR MIXING PLANT ON JOB SITE; CRUSHER PLANT ON JOB SITE; PAVING CONCRETE MIXER; TIMBER JACK HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON,S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY | $57.83 | $33.70 | $91.53 | Agreement |
| IRON0007-001 · Ironworkers agreement, September 16, 2025 | ||||
| IRONWORKER: (AREA 2) | $53.46 | $37.67 | $91.13 | Agreement |
| IRONWORKER: (AREA 1) | $57.87 | $37.67 | $95.54 | Agreement |
| IRON0007-010 · Ironworkers agreement, September 16, 2025 | ||||
IRONWORKER (MIDDLESEX…Full textIRONWORKER (MIDDLESEX (ASHBY, ASHLAND, AYER, BOXBORO, HOLLISTON, HOPKINTON, HUDSON, MARLBORO, SHIRLEY, STOW, TOWNSEND); NORFOLK (MEDWAY)) | $57.57 | $37.67 | $95.24 | Agreement |
| IRON0037-002 · Ironworkers agreement, September 16, 2025 | ||||
IRONWORKER (BARNSTABLE…Full textIRONWORKER (BARNSTABLE; BRISTOL (ACUSHNET, ATTLEBORO, BERKLEY, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER, FREETOWN, MANSFIELD, NEW BEDFORD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, SOMERSET, SWANSEA, TAUNTON, WESTPORT); DUKES; NANTUCKET; NORFOLK (BILLINGHAM, FRANKLIN, PLAINVILLE, WRENTHAM); PLYMOUTH (LAKEVILLE, MARION, MATTAPOISETT, MIDDLEBORO, ROCHESTER, WAREHAM)) | $43.03 | $33.53 | $76.56 | Agreement |
| LABO0022-006 · Laborers agreement, December 1, 2024 | ||||
LABORERS: GROUP 6…Full textLABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.20 | $29.70 | $75.90 | Agreement |
LABORERS: GROUP 5…Full textLABORERS: GROUP 5- FLAGGER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $27.01 | $29.70 | $56.71 | Agreement |
LABORERS: GROUP 4…Full textLABORERS: GROUP 4- BLASTER; POWDERMAN (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.20 | $29.70 | $75.90 | Agreement |
LABORERS: GROUP 3…Full textLABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.20 | $29.70 | $75.90 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.20 | $29.70 | $75.90 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.20 | $29.70 | $75.90 | Agreement |
| LABO0022-012 · Laborers agreement, December 1, 2024 | ||||
LABORERS: GROUP 6…Full textLABORERS: GROUP 6- ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 5…Full textLABORERS: GROUP 5- FLAGGER (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON)) | $27.01 | $29.70 | $56.71 | Agreement |
LABORERS: GROUP 4…Full textLABORERS: GROUP 4- BLASTER; POWDERMAN (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 3…Full textLABORERS: GROUP 3- AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER; HYDRAULIC & SIMILAR SELF POWERE DRILLS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2- ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILLPERATOR (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1- LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM, AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
| LABO0022-013 · Laborers agreement, December 1, 2024 | ||||
LABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6…Full textLABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6 HAZARDOUS WASTE WORK WITHIN THE ""HOT"" ZONE. (A PREMIUM OF TWO DOLLARS $2.00 PER HOUR OVER THE BASIC WAGE RATE. FOOTNOTE: FOR LABORERS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, PATRIOT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $ 58.43 29.70 LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 | $70.88 | Agreement |
| LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $46.20 | $29.70 | $75.90 | Agreement |
| LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 | $70.88 | Agreement |
| LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $46.20 | $29.70 | $75.90 | Agreement |
| LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $47.48 | $29.70 | $77.18 | Agreement |
| LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $52.50 | $29.70 | $82.20 | Agreement |
| LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $42.93 | $29.70 | $72.63 | Agreement |
| LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $47.95 | $29.70 | $77.65 | Agreement |
| LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $42.93 | $29.70 | $72.63 | Agreement |
| LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $47.95 | $29.70 | $77.65 | Agreement |
| LABORERS: GROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.58 | $29.70 | $72.28 | Agreement |
| LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $50.20 | $29.70 | $79.90 | Agreement |
| LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.33 | $29.70 | $72.03 | Agreement |
| LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $47.35 | $29.70 | $77.05 | Agreement |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 | $70.88 | Agreement |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.33 | $29.70 | $72.03 | Agreement |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.58 | $29.70 | $72.28 | Agreement |
| LABO1421-001 · Laborers agreement, December 2, 2024 | ||||
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 | $75.95 | Agreement |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 | $75.05 | Agreement |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 | $71.95 | Agreement |
LABORERS:, WRECKING: GROUP 3…Full textLABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 | $76.95 | Agreement |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 | $76.70 | Agreement |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 | $75.95 | Agreement |
| PAIN0035-001 · Painters and Allied Trades agreement, July 1, 2024 | ||||
PAINTER BRIDGE (BARNSTABLE BRISTOL…Full textPAINTER BRIDGE (BARNSTABLE BRISTOL; DUKES; ESSEX; NANTUCKET; PLYMOUTH (Remainder of NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES)) | $56.76 | $36.00 | $92.76 | Agreement |
| PAIN0035-015 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| PAINTER SPAY NEW CONSTRUCTION: SANDBLAST | $47.66 | $36.00 | $83.66 | Agreement |
| PAINTER REPAINT: SPRAY, SANDBLAST | $45.72 | $36.00 | $81.72 | Agreement |
| PAINTER BRUSH, TAPER (Repaint) | $44.32 | $36.00 | $80.32 | Agreement |
| PAINTER BRUSH, TAPER (NEw Construction) | $46.26 | $36.00 | $82.26 | Agreement |
PAINTER BRIDGE (MIDDLESEX…Full textPAINTER BRIDGE (MIDDLESEX (Cambridge, Everett, Malden, Medford, Sommerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline)) | $56.76 | $36.00 | $92.76 | Agreement |
| PLAS0534-001 · Plasterers and Cement Masons agreement, July 1, 2024 | ||||
| CEMENT MASON/CONCRETE FINISHER (ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY) | $49.19 | $40.86 | $90.05 | Agreement |
| PLUM0004-001 · Plumbers and Pipefitters agreement, September 1, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (MIDDLESEX (ASHBY, AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND)) | $55.00 | $31.57 | $86.57 | Agreement |
| PLUM0012-001 · Plumbers and Pipefitters agreement, March 2, 2025 | ||||
PLUMBER (ESSEX (AMES…Full textPLUMBER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, TOPSFIEILD, WENHAM, WEST NEWBURY)) | $69.84 | $36.43 | $106.27 | Agreement |
| PLUM0012-003 · Plumbers and Pipefitters agreement, March 2, 2025 | ||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEN, MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, TOPSFIELD, WENHAM, WEST NEWBURY)) | $69.84 | $36.43 | $106.27 | Agreement |
| PLUM0012-006 · Plumbers and Pipefitters agreement, March 2, 2025 | ||||
PLUMBER (ESSEX (LYNN…Full textPLUMBER (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, ASHLAND, AYER - EXCEPT W. OF GREENVILLE BRANCH OF BOSTON & MAINE RR, BEDFORD, BELMONT, BILLERICA, BOXBORO, BURLINGTON, CAMBRIDGE, CARLISLE, CHELMSFORD, CONCORD, DRACUT, DUNSTABLE, EVERETT, FRAMINGHAM, HUDSON, HOLLISTON, HOPKINTON, LEXINGTON, LINCOLN, LITTLETON, LOWELL, MALDEN, MARLBORO, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, NORTH READING, PEPPERELL, READING, SHERBORN, SOMERVILLE, STONEHAM, S | $69.84 | $36.43 | $106.27 | Agreement |
| PLUM0051-005 · Plumbers and Pipefitters agreement, August 26, 2024 | ||||
Group definitions, zones and premiums for PLUM0051-005PLUMBERS AND PIPEFITTERS (BARNSTABLE; BRISTOL; DUKES; NANTUCKET; NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON) PLYMOUTH(REMAINDER OF COUNTY)).$ 52.49 33.60 | ||||
| PLUM0537-001 · Plumbers and Pipefitters agreement, March 1, 2025 | ||||
PIPEFITTER (MIDDLESEX…Full textPIPEFITTER (MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, WAKEFIELD, WINCHESTER AND WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON CASHASSET, DEDHAM, FOXBORO, FRANKLIN, MILLIS, MILTON, SHARON, WALPOLE, WESTWOOD, AND WRENTHAN); PLYMOUTH (HINGHAM, HULL, SCITUATE); ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE,LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, MET | $66.58 | $39.22 | $105.80 | Agreement |
| TEAM0379-001 · Teamsters agreement, June 1, 2025 | ||||
TRUCK DRIVERS: GROUP 7…Full textTRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.82 | $37.35 | $79.17 | Agreement |
TRUCK DRIVERS: GROUP 6…Full textTRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.53 | $37.35 | $78.88 | Agreement |
TRUCK DRIVERS: GROUP 5…Full textTRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.24 | $37.35 | $78.59 | Agreement |
TRUCK DRIVERS: GROUP 4…Full textTRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.14 | $37.35 | $78.49 | Agreement |
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.02 | $37.35 | $78.37 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.95 | $37.35 | $78.30 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.78 | $37.35 | $78.13 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MA20260008?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator