CertifiedHours

Prevailing wage rates · Massachusetts · Wage determination

Prevailing wage rates: Franklin County, Massachusetts

Highway construction · MA20260007 modification 1, published May 18, 2026

The short answer

This sheet sets 11 classifications for highway work in Franklin County, Massachusetts. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $38.85 an hour (painter: spray (linestriping)) to $77.42 (power equipment operators: crane a.). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0336-015 · Carpenters agreement, September 1, 2025
CARPENTER$43.33$27.82$71.15Agreement
ENGI0098-006 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATORS: CRANE A.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$46.38$31.04$77.42Agreement
POWER EQUIPMENT OPERATORS: (4) ROLLER A.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$39.12$31.04$70.16Agreement
POWER EQUIPMENT OPERATORS: (1) LOADER A.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$42.88$31.04$73.92Agreement
POWER EQUIPMENT OPERATORS: (1) BACKHOE/EXCAVATOR/TRACKHOE A.

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$42.88$31.04$73.92Agreement
IRON0007-025 · Ironworkers agreement, September 16, 2025
IRONWORKER (REINFORCING AND STRUCTURAL)$41.89$33.90$75.79Agreement
LABO0596-002 · Laborers agreement, June 1, 2025
LABORER: COMMON OR GENERAL$35.00$26.91$61.91Agreement
LABORER (LANDSCAPE)$35.00$26.91$61.91Agreement
LABORER (GUARDRAIL INSTALLATION)$33.99$26.91$60.90Agreement
LABORER (ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR)$38.95$26.91$65.86Agreement
SUMA2014-003 · Survey of contractors in MA, January 11, 2017
PAINTER: SPRAY (LINESTRIPING)$38.85$0.00$38.85Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on MA20260007?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator