Prevailing wage rates · Massachusetts · Wage determination
Prevailing wage rates: Worcester County, Massachusetts
Heavy construction · MA20260002 modification 1, published May 18, 2026
The short answer
This sheet sets 111 classifications for heavy work in Worcester County, Massachusetts. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $44.83 an hour (line construction: groundman a.) to $113.58 (diver). Your contract may lock an earlier modification.
Scope
Heavy and Marine Construction Projects
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0006-005 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024 | ||||
INSULATOR/ASBESTOS WORKER…Full textINSULATOR/ASBESTOS WORKER (INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATING, AND FINISHES ALL TYPES OF MECHANICAL SYSTEMS) | $49.10 | $36.63 | $85.73 | Agreement |
| BOIL0029-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $50.62 | $28.82 | $79.44 | Agreement |
| BRMA0001-002 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER, CEMENT MASON…Full textBRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (SPRINGFIELD/PITTSFIELD CHAPTER WORCESTER (WARREN COUNTY)) | $50.81 | $32.27 | $83.08 | Agreement |
| BRMA0001-014 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER, CEMENT MASON…Full textBRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (WORCESTER CHAPTER WORCESTER (AUBURN BARRE, BLACKSTONE, BERLIN, BOLTON, BOYLSTON, THE BROOKFIELDS, CHARLTON, CLINTON, DOUGLAS, DUDLEY, GRAFTON, HARDWICK, HOLDEN, LEICESTER, MENDON, MILLBURY, MILVILLE, NEW BRAINTREE, NORTHBORO, NORTHBRIDGE, OAKHAM, OXFORD, PAXTON, RUTLAND, SHREWBURY, SOUTHBRIDGE, SPENCER, STURBRIDGE, SUTTON, UPTON, UXBRIDGE, WEBSTER, WESTBORO, WEST BOYLSTON, WORCESTER)) | $60.26 | $33.71 | $93.97 | Agreement |
| BRMA0001-015 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER, CEMENT MASON…Full textBRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (LOWELL CHAPTER WORCESTER (HOPEDALE, MILFORD, SOUTHBORO)) | $60.26 | $33.71 | $93.97 | Agreement |
| BRMA0001-023 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER, CEMENT MASON…Full textBRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON (LOWELL CHAPTER WORCESTER (ASHBURHANM, ATHOL, FITCHBURG, GARDNER, HARVARD, HUBBARDSTON, LANCASTER, LEOMINSTER, LUNENBURG, PETERSHAM, PHILLIPSTON, PRINCETON, ROYALSTON, STERLING, TEMPLETON, WESTMINSTER, WINCHENDON)) | $60.26 | $33.71 | $93.97 | Agreement |
| BRMA0003-001 · Bricklayers agreement, August 1, 2024 | ||||
| TERRAZZO FINISHER | $63.44 | $37.33 | $100.77 | Agreement |
| MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 | $102.03 | Agreement |
| MARBLE & TILE FINISHER | $49.32 | $35.26 | $84.58 | Agreement |
| CARP0056-004 · Carpenters agreement, August 1, 2024 | ||||
| DIVER TENDER | $61.70 | $35.47 | $97.17 | Agreement |
| DIVER | $78.11 | $35.47 | $113.58 | Agreement |
| CARP0056-008 · Carpenters agreement, August 1, 2024 | ||||
| PILEDRIVERMAN | $49.19 | $35.47 | $84.66 | Agreement |
| CARP0336-002 · Carpenters agreement, September 1, 2025 | ||||
| CARPENTER/LATHER (WORCESTER (EXCEPT GILBERTVILLE, HARWICK, WARREN, WEST BROOKFIELD)) | $50.10 | $31.45 | $81.55 | Agreement |
| CARP0336-007 · Carpenters agreement, September 1, 2025 | ||||
| CARPENTER/LATHER (WORCESTER (GILBERTVILLE, HARDWICK, WARREN, WEST BROOKFIELD)) | $50.10 | $31.45 | $81.55 | Agreement |
| CARP1121-004 · Carpenters agreement, April 21, 2025 | ||||
| MILLWRIGHT | $43.42 | $33.00 | $76.42 | Agreement |
| ELEC0096-002 · Electrical Workers (IBEW) agreement, September 7, 2025 | ||||
| ELECTRICIAN (WORCESTER (WARREN)) | $48.16 | $36.20 | $84.36 | Agreement |
| ELEC0104-001 · Electrical Workers (IBEW) agreement, September 1, 2024 | ||||
| LINE CONSTRUCTION: LINEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 | Agreement |
| LINE CONSTRUCTION: GROUNDMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $32.13 | $12.70 | $44.83 | Agreement |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $49.65 | $26.72 | $76.37 | Agreement |
| LINE CONSTRUCTION: CABLEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 | Agreement |
| ELEV0041-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $66.41 | $38.44 | $104.85 | Agreement |
| ENGI0004-003 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; BULLDOZER; TRACTOR; MECHANIC - MAINTENANCE; YORK RAKE; MULCHING MACHINE; PAVING SCREED MACHINE;STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING MACHINE; GROUT PUMP; PORTABLE STEAM BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; ASPHALT PAVER; LOCOMOTIVES OR MACHINES USED IN PLACE THEREOF; TAMPER (SELF PROPELLED OR TRACTOR-DRAW); CAL TRACKS; BALLAST REGULATOR;RAIL ANCHOR MACHINE; SWITCH TAMPER; TIRE TRUCK (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $57.18 | $33.70 | $90.88 | Agreement |
POWER EQUIPMENT OPERATORS : GROUP 4…Full textPOWER EQUIPMENT OPERATORS : GROUP 4 ASSITANT ENGINEER (FIREMAN) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $46.52 | $33.70 | $80.22 | Agreement |
POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 1…Full textPOWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 1 POWER SHOVEL; CRANE; TRUCK CRANE; DERRICK; PILE DRIVER; TRENCHING MACHINE; MECHANICAL HOIST PAVEMENT BREAKER; CEMENT CONCRETE PAVER; DRAGLINE; HOISTING ENGINE; THREE DRUM MACHINE; PUMPCRETE MACHINE; LOADERS; SHOVEL DOZER; FRONT END LOADER; MUCKING MACHINE; SHAFT HOIST; STEAM ENGINE; BACKHOE; GRADALL; CABLE WAY; FORK LIFT; CHERRY PICKER; BORING MACHINE; ROTARY DRILL; POST HOLE HAMMER; PORT HOLE DIGGER; ASPHALT PLANT ON JOB SITE; CONCRETE BATCHING AND/OR MIXING PLANT ON JOB SITE; CRUSHER PLANT ON JOB SITE; PAVING CONCRETE MIXER; TIMBER JACK (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $57.83 | $33.70 | $91.53 | Agreement |
POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 6…Full textPOWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $30.85 | $33.70 | $64.55 | Agreement |
POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 5…Full textPOWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $25.02 | $33.70 | $58.72 | Agreement |
POWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 3…Full textPOWER EQUIPMENT OPERATORS (BUIDING, HEAVY & MARINE): GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINES (1-3 GROUPED); GENERATOR; SIGHTING PLANT; HEATERS (POWER DRIVEN, 1- 5); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR STEAM, CONVEYOR, WELLPOINT SYSTEM (OPERATING) (WORCESTER (EXCEPT ATHOL, BARRE, BROOKFIELD, EAST BROOKFIELD, HARDWICK, NEW BRAINTREE, NORTH BROOKFIELD, OAKHAM, PETERSHAM, PHILLIPSTON, ROYALSTON, STRUTBRIDGE, TEMPLETON, WARREN, WEST BROOKFIELD, WINCHENDON)) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.18 OVER 185 FT. +3.84 OVER 210 FT. +5.39 OVER 250 FT. +8.16 OVER 295 FT. +11.29 OVER 350 FT. +13.14 | $37.02 | $33.70 | $70.72 | Agreement |
| ENGI0098-005 · Operating Engineers agreement, December 1, 2024 | ||||
POWER EQUIPMENT OPERATORS: GROUP 15…Full textPOWER EQUIPMENT OPERATORS: GROUP 15 BOOM LENGTHS OVER 350 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.38 | $31.04 | $83.42 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 14…Full textPOWER EQUIPMENT OPERATORS: GROUP 14 BOOM LENGTHS OVER 300 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.88 | $31.04 | $81.92 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 13…Full textPOWER EQUIPMENT OPERATORS: GROUP 13 BOOM LENGTHS OVER 250 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.88 | $31.04 | $80.92 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 12…Full textPOWER EQUIPMENT OPERATORS: GROUP 12 BOOM LENGTHS OVER 200 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.88 | $31.04 | $79.92 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 11…Full textPOWER EQUIPMENT OPERATORS: GROUP 11 BOOM LENGTHS OVER 150 FEET INCLUDING JIB HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $47.38 | $31.04 | $78.42 | Agreement |
| POWER EQUIPMENT OPERATORS: GROUP 10 MASTER MECHANIC HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $46.38 | $31.04 | $77.42 | Agreement |
| POWER EQUIPMENT OPERATORS: GROUP 9 OILER HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.37 | $31.04 | $75.41 | Agreement |
| POWER EQUIPMENT OPERATORS: GROUP 8 TRUCK CRANE CREWS HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.06 | $31.04 | $75.10 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 7…Full textPOWER EQUIPMENT OPERATORS: GROUP 7 COMPRESSORS UP TO 315 CU FT; SMALL MIXERS WITH SKIP; PUMPS UP TO 4 INCHES; POWER HEATERS; OILER; A-FRAME TRUCKS; FORKLIFTS-UP TO 7 FT. LIFT AND UP TO 3 TON CAPACITY; HYDRO BROOM; STUD WELDER. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $54.38 | $31.04 | $85.42 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 6…Full textPOWER EQUIPMENT OPERATORS: GROUP 6 COMPRESSOR (ONE OR TWO) 315 CU FT TO 900 CU FT; PUMPS 4 INCHES TO 16 INCHES (TOTAL DISCHARGE). HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.06 | $31.04 | $67.10 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 5…Full textPOWER EQUIPMENT OPERATORS: GROUP 5 HOISTS; CONVEYORS; POWER PAVEMENT BREAKERS; SELF-POWERED CONCRETE PAVEMENT FINISHING MACHINES; TWO BAG MIXERS WITH SKIP; MCCARTHY AND SIMILAR DRILLS; BATCH PLANTS (NOT SELF LOADING); BULK CEMENT PLANTS; SELF-PROPELLED MATERIAL SPREADERS; THREE OR MORE 10 KW LIGHT PLANTS; 30 KW OR MORE GENERATORS; POWER BROOM. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $38.00 | $31.04 | $69.04 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 4…Full textPOWER EQUIPMENT OPERATORS: GROUP 4 ASPHALT ROLLERS; SELF-POWERED ROLLERS AND COMPACTORS; TRACTOR WITHOUT BLADE DRAWING SHEEPSFOOT ROLLER; RUBBER TIRE ROLLER; VIBRATORY ROLLER OR OTHER TYPE OF COMPACTORS INCLUDING MACHINES FOR PULVERIZING AND AERATING SOIL; YORK RAKE. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.12 | $31.04 | $70.16 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 3…Full textPOWER EQUIPMENT OPERATORS: GROUP 3 COMBINATION BACKHOE/LOADER UP TO 3/4 CU YD; SCRAPERS UP TO 21 CU YD (STRUCK LOAD, SELF PROPELLED OR TRACTOR DRAWN); TIREMAN; FRONT END LOADERS UP TO 4 YDS; WELL DRILLERS; ENGINEER OR FIREMAN ON HIGH PRESSURE BOILER; SELF-LOADING BATCH PLANT; WELL POINT OPERATORS ELECTRIC PUMPS USED IN WELL POINT SYSTEM; PUMPS, 16 INCHES AND OVER (TOTAL DISCHARGE); COMPRESSOR, ONE OR TWO 900 CU FT AND OVER; POWERED GREASE TRUCK; TUNNEL LOCOMOTIVES AND DINGYS; GROUT PUMPS; HYDRAULIC JACKS; BOOM TRUCK; HYDRAULIC CRANES- UP TO 10 TON. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.35 | $31.04 | $73.39 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 ROTARY DRILL WITH MOUNTED COMPRESSOR; COMPRESSOR HOUSE (3 TO 6 COMPRESSORS); ROCK AND EARTH BORING MACHINES (EXCLUDING MCCARTHY AND SIMILAR DRILLS); FRONT END LOADERS 4 CU YDS TO 5 1/2 CU YDS); FORKLIFTS-7 FT LIFT AND OVER 3 TON CAPACITY; SCRAPER 21 YDS AND OVER (STRUCK LOAD); SONIC HAMMER CONSOLE; RECLAIMERS ROAD PLANER/MILLING MACHINE; CAL TRACKS; BALLAST REGULATORS; RAIL ANCHOR MACHINES; SWITCH TAMPERS, ASPHALT PAVERS; MECHANIC; WELDER AND TRANSFER MACHINE. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.57 | $31.04 | $73.61 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1 SHOVELS; CRAWLERS AND TRUCK CRANES INCLUDING ALL TOWER; SELF-PROPELLED HYDRAULIC CRANES 10 TONS AND OVER; DRAGLINES; CLAM SHELLS; CABLEWAYS; SHAFT HOISTS; MUCKING MACHINES DERRICKS; BACKHOES; BULLDOZERS; GRADALLS; ELEVATING GRADERS; PILE DRIVERS; CONCRETE PAVERS; TRENCHING MACHINES; FRONT END LOADERS- 5 1/2 CU YDS AND OVER; DUAL DRUM PAVER; AUTOMATIC GRADER-EXCAVATOR(C.M.I. OR EQUAL); SCRAPERS TOWING PAN OR WAGON; TANDEM DOZERS OR PUSH CATS(2 UNITS IN TANDEM); SHOTCRETE MACHINE; TUNNEL BORING MACHINE; COMBINATION BACKHOE/LOADER 3/4 CU YD HOE OR OVER; JET ENGINE DRYER; TREE SHREDDER; POST HOLE DIGGER; POST HOLE HAMMER; POST EXTRACTOR; TRUCK MOUNTED CONCRETE PUMP WITH BOOM; ROTO-MILL; GRADER; HORIZONTAL DRILLING MACHINE; JOHN HENRY ROCK DRILL AND SIMILAR EQUIPMENT. HAZARDOUS WASTE PREMIUM $2.00 FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.88 | $31.04 | $73.92 | Agreement |
| IRON0007-012 · Ironworkers agreement, September 16, 2025 | ||||
| IRONWORKER | $57.57 | $37.67 | $95.24 | Agreement |
| LABO0022-001 · Laborers agreement, December 2, 2024 | ||||
LABORERS:, HEAVY CONSTRUCTION: GROUP 6…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 6 ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS | $40.95 | $29.70 | $70.65 | Agreement |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 5 FLAGGER | $39.70 | $29.70 | $69.40 | Agreement |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 4 BLASTER; POWDERMAN | $39.95 | $29.70 | $69.65 | Agreement |
LABORERS:, HEAVY CONSTRUCTION: GROUP 3…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $39.70 | $29.70 | $69.40 | Agreement |
LABORERS:, HEAVY CONSTRUCTION: GROUP 2…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR, JACK HAMMER OPERATOR, PAVEMENT BREAKER, CARBIDE CORE DRILLING MACHINE, CHAIN SAW OPERATOR, BARCO TYPE JUMPING TAMPERS, CONCRETE PUMP, MOTORIZED MORTAR MIXER, RIDE-ON-MOTORIZED BUGGY | $39.20 | $29.70 | $68.90 | Agreement |
LABORERS:, HEAVY CONSTRUCTION: GROUP 1…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS | $38.95 | $29.70 | $68.65 | Agreement |
| LABO0022-013 · Laborers agreement, December 1, 2024 | ||||
LABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6…Full textLABORERS:(TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR), GROUP 6 HAZARDOUS WASTE WORK WITHIN THE ""HOT"" ZONE. (A PREMIUM OF TWO DOLLARS $2.00 PER HOUR OVER THE BASIC WAGE RATE. FOOTNOTE: FOR LABORERS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, PATRIOT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, AND CHRISTMAS DAY $ 58.43 29.70 LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 | $70.88 | Agreement |
| LABORERS: LABORERS; TOP MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $46.20 | $29.70 | $75.90 | Agreement |
| LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 | $70.88 | Agreement |
| LABORERS: LABORER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $46.20 | $29.70 | $75.90 | Agreement |
| LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $47.48 | $29.70 | $77.18 | Agreement |
| LABORERS: GROUP 5 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $52.50 | $29.70 | $82.20 | Agreement |
| LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 5 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 4 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 4 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 3 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 3 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 2 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 2 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $53.41 | $29.70 | $83.11 | Agreement |
| LABORERS: GROUP 2 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $58.43 | $29.70 | $88.13 | Agreement |
| LABORERS: GROUP 2 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $42.93 | $29.70 | $72.63 | Agreement |
| LABORERS: GROUP 1 (ROCK SHAFT, CONCRETE LINING OF SAME AND TUNNEL IN FREE AIR) | $47.95 | $29.70 | $77.65 | Agreement |
| LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $45.48 | $29.70 | $75.18 | Agreement |
| LABORERS: GROUP 1 (CLEANING CONCRETE AND CAULKING TUNNEL (Both New & Existing)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $42.93 | $29.70 | $72.63 | Agreement |
| LABORERS: GROUP 1 ((TUNNELS, CAISSON & CYLINDER WORK IN COMPRESSED AIR)) | $47.95 | $29.70 | $77.65 | Agreement |
| LABORERS: GROUP 1 ((FREE AIR OPERATION): SHIELD DRIVEN AND LINER PLATE IN FREE AIR)) | $50.50 | $29.70 | $80.20 | Agreement |
| LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.58 | $29.70 | $72.28 | Agreement |
| LABORERS: DRILLER ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $50.20 | $29.70 | $79.90 | Agreement |
| LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.33 | $29.70 | $72.03 | Agreement |
| LABORERS: BOTTOM MAN ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $47.35 | $29.70 | $77.05 | Agreement |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $41.18 | $29.70 | $70.88 | Agreement |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.33 | $29.70 | $72.03 | Agreement |
| ((OPEN AIR CASSONS, UNDERPINNING AND TEST BORING INDUSTRIES):) | $42.58 | $29.70 | $72.28 | Agreement |
| LABO1421-003 · Laborers agreement, December 2, 2024 | ||||
| LABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE | $46.25 | $29.70 | $75.95 | Agreement |
| LABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS | $45.35 | $29.70 | $75.05 | Agreement |
| LABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY) | $42.25 | $29.70 | $71.95 | Agreement |
LABORERS:, WRECKING: GROUP 3…Full textLABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS | $47.25 | $29.70 | $76.95 | Agreement |
| LABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS | $47.00 | $29.70 | $76.70 | Agreement |
| LABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER | $46.25 | $29.70 | $75.95 | Agreement |
| PAIN0035-006 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| PAINTER: SPRAY, SANDBLAST (REPAINT) | $45.72 | $36.00 | $81.72 | Agreement |
| PAINTER: SPRAY, SANDBLAST (NEW CONSTRUCTION) | $47.66 | $36.00 | $83.66 | Agreement |
| PAINTER: BRUSH, TAPER (REPAINT) | $44.32 | $36.00 | $80.32 | Agreement |
| PAINTER: BRUSH, TAPER (NEW CONSTRUCTION) | $46.26 | $36.00 | $82.26 | Agreement |
| PAINTER: BRIDGE (REPAINT) | $44.32 | $36.00 | $80.32 | Agreement |
| PAINTER: BRIDGE (NEW CONSTRUCTION) | $56.76 | $36.00 | $92.76 | Agreement |
| PAIN0035-021 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| GLAZIER | $46.26 | $36.00 | $82.26 | Agreement |
| PLUM0004-002 · Plumbers and Pipefitters agreement, September 1, 2025 | ||||
| PLUMBERS AND PIPEFITTERS (WORCESTER (EXCEPT HOPEDALE AND SOUTHBORO)) | $55.00 | $31.57 | $86.57 | Agreement |
| PLUM0012-002 · Plumbers and Pipefitters agreement, March 2, 2025 | ||||
| PLUMBER (WORCESTER (HOPEDALE AND SOUTHBORO)) | $69.84 | $36.43 | $106.27 | Agreement |
| ROOF0033-001 · Roofers agreement, August 1, 2025 | ||||
ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING…Full textROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | $53.53 | $35.69 | $89.22 | Agreement |
| SFMA0669-002 · SFMA, April 1, 2025 | ||||
| SPRINKLER FITTER | $53.25 | $29.75 | $83.00 | SFMA |
| SHEE0017-004 · Sheet Metal Workers agreement, April 1, 2025 | ||||
Group definitions, zones and premiums for SHEE0017-004SHEET METAL WORKER (WORCESTER (HARVARD, LANCASTER)).$ 60.00 48.78 | ||||
| SHEE0063-002 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER (WORCESTER (EXCEPT HARVARD & LANCASTER)) | $43.48 | $36.46 | $79.94 | Agreement |
| TEAM0379-003 · Teamsters agreement, June 1, 2025 | ||||
TRUCK DRIVERS: GROUP 7…Full textTRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.82 | $37.35 | $79.17 | Agreement |
TRUCK DRIVERS: GROUP 6…Full textTRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.53 | $37.35 | $78.88 | Agreement |
TRUCK DRIVERS: GROUP 5…Full textTRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.24 | $37.35 | $78.59 | Agreement |
TRUCK DRIVERS: GROUP 4…Full textTRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.14 | $37.35 | $78.49 | Agreement |
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.02 | $37.35 | $78.37 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.95 | $37.35 | $78.30 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, & CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.78 | $37.35 | $78.13 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MA20260002?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator