Prevailing wage rates · Massachusetts · Wage determination
Prevailing wage rates: Barnstable, Bristol, Dukes and 5 more counties, Massachusetts
Building construction · MA20260001 modification 1, published May 18, 2026
The short answer
This sheet sets 110 classifications for building work in Barnstable, Bristol, Dukes and 5 more counties, Massachusetts. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $44.83 an hour (line construction: groundman a.) to $112.81 (sprinkler fitter (bristol). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0006-001 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024 | ||||
INSULATOR/ASBESTOS WORKER…Full textINSULATOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE) | $55.45 | $36.63 | $92.08 | Agreement |
INSULATOR/ASBESTOS WORKER…Full textINSULATOR/ASBESTOS WORKER (ZONE A) ZONE A- BARNSTABLE COUNTY (BREWSTER, CHATHAM, DENNIS, EASTHAM, HARWICH, ORLEANS, PROVINCETOWN, TRURO, WELLFLEET, YARMOUTH) BRISTOL COUNTY (EASTON), MIDDLESEX COUNTY, AND NORFOLK COUNTY (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH) | $55.45 | $36.63 | $92.08 | Agreement |
| ASBE0006-002 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT (BARNSTABLE (BREWSTER, CHATHAM, DENNIS, EASTHAM, HARWICH, ORLEANS, PROVINCETOWN, TRURO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA | $55.45 | $36.63 | $92.08 | Agreement |
| ASBE0006-010 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024 | ||||
INSULATOR/ASBESTOS WORKER…Full textINSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS | $55.45 | $36.63 | $92.08 | Agreement |
| BOIL0029-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $50.62 | $28.82 | $79.44 | Agreement |
| BRMA0001-008 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER, CEMENT MASON…Full textBRICKLAYER, CEMENT MASON, PLASTERER (FOXBORO CHAPTER BRISTOL (ATTLEBORO, BERKLEY, DIGHTON, MANSFIELD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, TAUNTON) AND NORFOLK (BELLINGHAM, CANTON, DEDHAM, FOXBORO, FRANKLIN, NORFOLK, NORWOOD, PLAINVILLE, SHARON, WALPOLE, WESTRWOOD, WRENTHAM) COUNTIES) | $60.26 | $33.71 | $93.97 | Agreement |
| BRMA0001-009 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER AND PLASTERER…Full textBRICKLAYER AND PLASTERER (LOWELL CHAPTER MIDDLESEX (ACTON, ASBY, AYER, BEDFORD, BILLERICA, BOXBORO, CARLISLE, CHEMSFORD, DRACUT, DUNSTBLE, FT. DENVENS, GROTON, LITTLETON, LOWELL, NORTH ACTON, PEPPERELL, SHIRLEY, SOUTH ACTON, TEWKSBURY, TOWNSEND, TYNGSBORO, WEST ACTON, WESTFORD, WILMINGTON)) | $60.26 | $33.71 | $93.97 | Agreement |
| BRMA0001-010 · Bricklayers agreement, August 1, 2023 | ||||
BRICKLAYER (LOWELL CHAPTER MIDDLESEX…Full textBRICKLAYER (LOWELL CHAPTER MIDDLESEX (ASHLAND, FRAMINGHAM, HOLLISTON, HOPKINTON, HUDSON, MAYNARD, NATICK, SHERBVORN, STOW); AND NORFOLK (MEDFIELD, MEDWAY,MILLIS)) | $60.26 | $33.71 | $93.97 | Agreement |
| BRMA0003-001 · Bricklayers agreement, August 1, 2024 | ||||
| TERRAZZO FINISHER | $63.44 | $37.33 | $100.77 | Agreement |
| MARBLE, TILE & TERRAZZO WORKERS | $64.52 | $37.51 | $102.03 | Agreement |
| MARBLE & TILE FINISHER | $49.32 | $35.26 | $84.58 | Agreement |
| BRMA0003-003 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER (BOSTON CHAPTER MIDDLESEX…Full textBRICKLAYER (BOSTON CHAPTER MIDDLESEX (ARLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, SOMERVILLE); NORFOLK (BROOKLINE, MILTON); AND SUFFOLK) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-006 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER, CEMENT MASON AND PLASTERER…Full textBRICKLAYER, CEMENT MASON AND PLASTERER (LYNN CHAPTER ESSEX (AMESBURY, ANDOVER, BEVERLY, BOXFORD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSEWICH, LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEN, MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALISBURY, SALEM, SAUGUS, SWAMPSCOTT, TOPSFIELD WAKEFIELD, WENHAM, WEST NEWBURY); AND MIDDLESEX (READING, NORTH READING, WAKEFIELD)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-007 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER AND PLASTERER…Full textBRICKLAYER AND PLASTERER (WALTHAM CHAPTER MIDDLESEX (BELMONT, BURLINGTON, CONCORD, LEXINGTON, LINCOLN, STONEHAM, SUDBURY, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-008 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER, CEMENT MASON AND PLASTERER…Full textBRICKLAYER, CEMENT MASON AND PLASTERER (NEWTON CHAPTER MIDDLESEX (NEWTON) AND NORFOLK (DOVER, NEEDHAM, WELLESLEY)) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-009 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER, CEMENT MASON AND PLASTERER…Full textBRICKLAYER, CEMENT MASON AND PLASTERER (NEW BEDFORD BARNSTABLE; BRISTOL (ACUSHNET, DARMOUTH, FARHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD, SOMERSET, SWANSEA, WESTPORT); DUKES; AND NANTUCKET COUNTIES) | $64.50 | $37.54 | $102.04 | Agreement |
| BRMA0003-010 · Bricklayers agreement, August 1, 2024 | ||||
BRICKLAYER, CEMENT MASON AND PLASTERER…Full textBRICKLAYER, CEMENT MASON AND PLASTERER (QUINCY CHAPTER NORFOLK COUNTY (AVON, BRAINTREE, COHASSET, HOLBROOK, QUINCY, RANDOLPH, SOUGHTON, WEYMOUTH)) | $64.50 | $37.54 | $102.04 | Agreement |
| CARP0056-011 · Carpenters agreement, August 1, 2024 | ||||
PILEDRIVERMAN (SUFFOLK…Full textPILEDRIVERMAN (SUFFOLK (ALL OF COUNTY); AND THOSE AREAS OF BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES SITUATED INSIDE BOSTON BELTWAY (I-495) AND NORTH OF CAPE COD CANAL. ALL OF DUKES AND NANTUCKET COUNTIES) | $55.79 | $35.47 | $91.26 | Agreement |
| CARP0056-012 · Carpenters agreement, August 1, 2024 | ||||
PILEDRIVERMAN (THE AREAS OF BARNSTABLE…Full textPILEDRIVERMAN (THE AREAS OF BARNSTABLE, BRISTOL, AND NORFOLK COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495) AND SOUTH OF CAPE COD CANAL) | $55.79 | $35.47 | $91.26 | Agreement |
| CARP0056-013 · Carpenters agreement, August 1, 2024 | ||||
PILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY…Full textPILEDRIVERMAN (THOSE AREAS OF ESSEX AND MIDDLESEX COUNTIES SITUATED OUTSIDE BOSTON BELTWAY (I-495)) | $49.19 | $35.47 | $84.66 | Agreement |
| CARP0327-001 · Carpenters agreement, September 1, 2025 | ||||
CARPENTER (MIDDLESEX…Full textCARPENTER (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE, DEDHAM, MILTON); AND SUFFOLK) | $61.19 | $31.55 | $92.74 | Agreement |
| CARP0339-001 · Carpenters agreement, September 1, 2025 | ||||
CARPENTER (BRISTOL…Full textCARPENTER (BRISTOL (ATTLEBOROUGH, NORTH ATTLEBOROUGH); ESSEX; MIDDLESEX (EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); AND NORFOLK (BELLINGHAM, CANTON, FOXBORO, FRANKLIN, MEDFIELD, MEDWAY, MILLIS, NEEDHAM, NORFOLK, NORWOOD, PLAINVILLE, SHARON, WALPOLE, WELLESLEY, WESTWOOD, WRENTHAM)) | $50.10 | $31.45 | $81.55 | Agreement |
| CARP0346-003 · Carpenters agreement, September 1, 2025 | ||||
| CARPENTER (NORFOLK COUNTY (BRAINTREE, COHASSETT, SCITUATE, WEYMOUTH, QUINCY)) | $50.10 | $31.45 | $81.55 | Agreement |
| CARP0624-005 · Carpenters agreement, September 1, 2017 | ||||
| CARPENTER (DUKES; NANTUCKET) | $46.43 | $28.35 | $74.78 | Agreement |
| CARP0624-007 · Carpenters agreement, September 1, 2017 | ||||
CARPENTER (BARNSTABLE…Full textCARPENTER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO & NORTH ATTLEBORO); AND NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON) COUNTIES) | $39.28 | $27.90 | $67.18 | Agreement |
| CARP1121-001 · Carpenters agreement, April 21, 2025 | ||||
| MILLWRIGHT (SUFFOLK COUNTY) | $50.47 | $33.50 | $83.97 | Agreement |
| CARP1121-003 · Carpenters agreement, April 21, 2025 | ||||
| MILLWRIGHT (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET AND NORFOLK COUNTIES) | $45.03 | $33.25 | $78.28 | Agreement |
| CARP2168-001 · Carpenters agreement, September 1, 2025 | ||||
FLOOR LAYER: CARPET…Full textFLOOR LAYER: CARPET (MIDDLESEX (BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); NORFOLK (BROOKLINE, DEDHAM, MILTON); AND SUFFOLK) | $57.49 | $31.75 | $89.24 | Agreement |
| CARP2168-004 · Carpenters agreement, September 1, 2025 | ||||
FLOOR LAYER: CARPET…Full textFLOOR LAYER: CARPET (BRISTOL; ESSEX; MIDDLESEX (EXCEPT BELMONT, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, SOMERVILLE); REMAINDER OF NORFOLK COUNTY) | $57.49 | $31.75 | $89.24 | Agreement |
| CARP2168-005 · Carpenters agreement, September 1, 2025 | ||||
| FLOOR LAYER: CARPET (BARNSTABALE; DUKES; AND NANTUCKET) | $49.18 | $31.75 | $80.93 | Agreement |
| ELEC0096-001 · Electrical Workers (IBEW) agreement, September 7, 2025 | ||||
TELEDATA SYSTEM INSTALLER…Full textTELEDATA SYSTEM INSTALLER (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND)) | $36.12 | $34.51 | $70.63 | Agreement |
ELECTRICIAN (MIDDLESEX…Full textELECTRICIAN (MIDDLESEX (ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND)) | $48.16 | $36.20 | $84.36 | Agreement |
| ELEC0099-001 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| TELEDATA SYSTEM INSTALLER (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK)) | $42.09 | $19.71 | $61.80 | Agreement |
| ELECTRICIAN (BRISTOL (ATTLEBORO, NORTH ATTLEBORO, SEEKONK)) | $56.11 | $24.74 | $80.85 | Agreement |
| ELEC0103-001 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
Group definitions, zones and premiums for ELEC0103-001TELEDATA SYSTEM INSTALLER (ESSEX; MIDDLESEX (EXCLUDING ASHBY, ASHLAND, AYER, FT. DEVENS, GROTON, HOPKINTON, HUDSON, MARLBORO, PEPPERELL, SHIRLEY, STOW, TOWNSEND); NORFOLK (EXCLUDING AVON, HOLBROOK, PLAINVILLE, RANDOLPH, STOUGHTON) SUFFOLK).$ 52.94 34.74 | ||||
| ELEC0103-002 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (ESSEX…Full textELECTRICIAN (ESSEX (AMESBURY, ANDOVER, BOXFORD, GEORGETOWN, GROVELAND, HAVERHILL, LAWRENCE, MERRIMAC, METHUEN, NEWBURY, NEWBURYPORT, NORTH ANDOVER, ROWLEY, SALISBURY, WEST NEWBURY); MIDDLESEX (BEDFORD, BILLERICA, BOXBORO, BURLINGTON, CARLISLE, CHELMSFORD, DRACUT, DUNSTABLE LITTLETON, LOWELL, NORTH READING, TEWKSBURY, TYNGSBORO, WESTFORD, WILMINGTON)) | $66.17 | $37.08 | $103.25 | Agreement |
| ELEC0103-004 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (ESSEX…Full textELECTRICIAN (ESSEX (BEVERLY, DANVERS, ESSEX, GLOUCESTER, HAMILTON, IPSWICH, MANCHESTER, MARBLEHEAD, MIDDLETON, PEABODY, ROCKPORT, SALEM, TOPSFIELD, WENHAM)) | $66.17 | $37.08 | $103.25 | Agreement |
| ELEC0103-005 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
ELECTRICIAN (ESSEX…Full textELECTRICIAN (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, BELMONT, CAMBRIDGE, CONCORD, EVERETT, FRAMINGHAM, HOLLISTON, LEXINGTON, LINCOLN, MALDEN, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, READING, SHERBORN, SOMERVILLE, STONEHAM, SUDBURY, WAKEFIELD, WALTHAM, WATERTOWN, WAYLAND, WESTON, WINCHESTER, WOBURN); NORFOLK (BELLINGHAM, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, FRANKLOIN, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWO | $66.17 | $37.08 | $103.25 | Agreement |
| ELEC0104-001 · Electrical Workers (IBEW) agreement, September 1, 2024 | ||||
| LINE CONSTRUCTION: LINEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 | Agreement |
| LINE CONSTRUCTION: GROUNDMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $32.13 | $12.70 | $44.83 | Agreement |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $49.65 | $26.72 | $76.37 | Agreement |
| LINE CONSTRUCTION: CABLEMAN A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY AND COLUMBUS DAY, PROVIDED THE EMPLOYEE HAS BEEN EMPLOYED 5 WORKING DAYS PRIOR TO ANY ONE OF THE LISTED HOLIDAYS | $58.41 | $30.19 | $88.60 | Agreement |
| ELEC0223-005 · Electrical Workers (IBEW) agreement, September 1, 2024 | ||||
ELECTRICIAN (BARNSTABLE…Full textELECTRICIAN (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET AND NORFOLK (AVON, HALBROOK, PLAINVILLE, RANDOLPH, STOUGHTON)) | $50.02 | $31.05 | $81.07 | Agreement |
| ELEC0223-006 · Electrical Workers (IBEW) agreement, September 1, 2024 | ||||
TELEDATA SYSTEM INSTALLER…Full textTELEDATA SYSTEM INSTALLER (BARNSTABLE; BRISTOL (EXCEPT ATTLEBORO, NORTH ATTLEBORO, SEEKONK); DUKES; NANTUCKET AND NORFOLK (AVON, HALBROOK, PLAINVILLE, RANDOLPH, STOUGHTON)) | $42.52 | $28.47 | $70.99 | Agreement |
| ELEV0004-001 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTE: FOR ELEVATOR MECHANICS: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $74.17 | $38.44 | $112.61 | Agreement |
| ENGI0004-001 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATORS: GROUP 6…Full textPOWER EQUIPMENT OPERATORS: GROUP 6 OILER (ON TRUCK CRANES AND GRADALLS) STANT ENGINEER (ON TRUCK CRANE AND GRADALL) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.28 OVER 185 FT. +4.05 OVER 210 FT. +5.67 OVER 250 FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $30.85 | $33.70 | $64.55 | Agreement |
| POWER EQUIPMENT OPERATORS: GROUP 5 OILER (OTHER THAN TRUCK CRANES AND GRADALLS) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.28 OVER 185 FT. +4.05 OVER 210 FT. +5.67 OVER 250 FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $25.02 | $33.70 | $58.72 | Agreement |
| POWER EQUIPMENT OPERATORS: GROUP 4 ASSISTANT ENGINEER (FIREMAN) FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.28 OVER 185 FT. +4.05 OVER 210 FT. +5.67 OVER 250 FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $46.52 | $33.70 | $80.22 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 3…Full textPOWER EQUIPMENT OPERATORS: GROUP 3 PUMPS (1-3 GROUPED); COMPRESSOR; WELDING MACHINE (1-3 GROUPED); GENERATOR; CONCRETE VIBRATOR; HEATER (POWER DRIVEN 1- 5); WELL POINT SYSTEM (OPERATING); SYPHON-PULSOMETER; CONCRETE MIXER; VALVES CONTROLLING PERMANENT PLANT AIR OR STEAM; CONVEYOR; JACKSON TYPE TAMPER; SINGLE DIAPHRAGM PUMP; LIGHTING PLANT FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.28 OVER 185 FT. +4.05 OVER 210 FT. +5.67 OVER 250 FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $37.02 | $33.70 | $70.72 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 2…Full textPOWER EQUIPMENT OPERATORS: GROUP 2 SONIC OR VIBRATORY HAMMER; GRADER; SCRAPER; TANDEM SCRAPER; CONCRETE PUMP; BULLDOZER; TRACTOR; YORK RAKE; MULCHING MACHINE; PORTABLE STEAM BOILER; PORTABLE STEAM GENERATOR; ROLLER; SPREADER; TAMPER (SELF PROPELLED OR TRACTOR DRAWN); ASPHALT PAVER; MECHANIC - MAINTENANCE; PAVING SCREED MACHINE; STATIONARY STEAM BOILER; PAVING CONCRETE FINISHING MACHINE; CAL TRUCK; BALLAST REGULATOR; SWITCH TAMPER; RAIL ANCHOR MACHINE; TIRE TRUCK FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.28 OVER 185 FT. +4.05 OVER 210 FT. +5.67 OVER 250 FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $57.18 | $33.70 | $90.88 | Agreement |
POWER EQUIPMENT OPERATORS: GROUP 1…Full textPOWER EQUIPMENT OPERATORS: GROUP 1 CRANE; SHOVEL; TRUCK CRANE; CHERRY PICKER; DRAGLINE; TRENCH HOE; BACKHOE; THREE DRUM MACHINE; DERRICK; PILE DRIVER; ELEVATOR TOWER; HOIST; GRADALL; SHOVEL DOZER; FRONT END LOADER; FORK LIFT; SUGER; BORING MACHINE; ROTARYU DRILL; POST HOLE HAMMER; POST HOLE DIGGER; PUMPCRETE MACHINE; ASPHALT PLANT (ON SITE); CONCRETE BATCHING AND/OR MIXING PLANT (ON SITE); CRUSHER PLANT (ON SITE); PAVING CONCRETE MIXER; TIMBER JACK FOOTNOTE: FOR POWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY HOURLY PREMIUM FOR BOOM LENGTHS (INCLUDING JIB): OVER 150 FT. +2.28 OVER 185 FT. +4.05 OVER 210 FT. +5.67 OVER 250 FT. +8.59 OVER 295 FT. +11.86 OVER 350 FT. +13.82 | $57.83 | $33.70 | $91.53 | Agreement |
| IRON0007-006 · Ironworkers agreement, September 16, 2025 | ||||
| IRONWORKERS:: (AREA 2) | $53.46 | $37.67 | $91.13 | Agreement |
| IRONWORKERS:: (AREA 1) | $57.87 | $37.67 | $95.54 | Agreement |
| IRON0007-010 · Ironworkers agreement, September 16, 2025 | ||||
IRONWORKER (MIDDLESEX…Full textIRONWORKER (MIDDLESEX (ASHBY, ASHLAND, AYER, BOXBORO, HOLLISTON, HOPKINTON, HUDSON, MARLBORO, SHIRLEY, STOW, TOWNSEND); NORFOLK (MEDWAY)) | $57.57 | $37.67 | $95.24 | Agreement |
| IRON0037-005 · Ironworkers agreement, September 16, 2025 | ||||
IRONWORKER (BARNSTABLE…Full textIRONWORKER (BARNSTABLE; BRISTOL (ACUSHNET, ATTLEBORO, BERKLEY, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER, FREETOWN, MANSFIELD, NEW BEDFORD, NORTH ATTLEBORO, NORTON, RAYNHAM, REHOBOTH, SEEKONK, SOMERSET, SWANSEA, TAUNTON, WESTPORT); DUKES; NANTUCKET; NORFOLK (BILLINGHAM, FRANKLIN, PLAINVILLE, WRENTHAM)) | $43.03 | $33.53 | $76.56 | Agreement |
| LABO0022-001 · Laborers agreement, December 2, 2024 | ||||
LABORERS:, HEAVY CONSTRUCTION: GROUP 6…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 6 ASBESTOS ABATEMENT; TOXIC AND HAZARDOUS WASTE LABORERS | $40.95 | $29.70 | $70.65 | Agreement |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 5 FLAGGER | $39.70 | $29.70 | $69.40 | Agreement |
| LABORERS:, HEAVY CONSTRUCTION: GROUP 4 BLASTER; POWDERMAN | $39.95 | $29.70 | $69.65 | Agreement |
LABORERS:, HEAVY CONSTRUCTION: GROUP 3…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 3 AIR TRACK OPERATOR; BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF POWERED DRILLS | $39.70 | $29.70 | $69.40 | Agreement |
LABORERS:, HEAVY CONSTRUCTION: GROUP 2…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 2 ASPHALT RAKER; FENCE AND GUARD RAIL ERECTOR; LASER BEAM OPERATOR; MASON TENDER; PIPELAYER; PNEUMATIC DRILL OPERATOR; PNEUMATIC TOOL OPERATOR; WAGON DRILL OPERATOR, JACK HAMMER OPERATOR, PAVEMENT BREAKER, CARBIDE CORE DRILLING MACHINE, CHAIN SAW OPERATOR, BARCO TYPE JUMPING TAMPERS, CONCRETE PUMP, MOTORIZED MORTAR MIXER, RIDE-ON-MOTORIZED BUGGY | $39.20 | $29.70 | $68.90 | Agreement |
LABORERS:, HEAVY CONSTRUCTION: GROUP 1…Full textLABORERS:, HEAVY CONSTRUCTION: GROUP 1 LABORERS; CARPENTER TENDERS; CEMENT FINISHER TENDERS, PLASTERER TENDERS | $38.95 | $29.70 | $68.65 | Agreement |
| LABO0022-004 · Laborers agreement, December 1, 2024 | ||||
| PLASTERER TENDER | $38.95 | $29.70 | $68.65 | Agreement |
| LABO0022-005 · Laborers agreement, December 1, 2024 | ||||
PLASTERER TENDER (SUFFOLK COUNTY…Full textPLASTERER TENDER (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER ISLAND, NUT ISLAND); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
PLASTERER TENDER (BARNSTABLE…Full textPLASTERER TENDER (BARNSTABLE, BRISTOL, DUKES, ESSEX, NANTUCKET, MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE DEDHAM AND MILTON) COUNTIES) | $38.95 | $29.70 | $68.65 | Agreement |
| LABO0022-009 · Laborers agreement, December 1, 2024 | ||||
LABORERS: GROUP 7…Full textLABORERS: GROUP 7 - FLAGGERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $27.01 | $29.70 | $56.71 | Agreement |
LABORERS: GROUP 6…Full textLABORERS: GROUP 6- ASBESTOS REMOVAL LABORERS/HAZ-MAT LABORERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 5…Full textLABORERS: GROUP 5- PRE-CAST FLOOR AND ROOF PLANK ERECTOR (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 4…Full textLABORERS: GROUP 4- BLASTER; POWDERMAN (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 3…Full textLABORERS: GROUP 3- AIR TRACK, BLOCK PAVER; RAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2 - JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHALT RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERATOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR2 (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1- LABORERS; CARPENTER TENDERS (SUFFOLK COUNTY (BOSTON, CHELSEA, REVERE, WINTHROP, DEER & NUT ISLANDS); MIDDLESEX COUNTY (ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKEFIELD, WINCHESTER, WINTHROP, AND WOBURN ONLY); NORFOLK COUNTY (BROOKLINE, DEDHAM, AND MILTON ONLY)) | $46.10 | $29.70 | $75.80 | Agreement |
| LABO0022-010 · Laborers agreement, December 1, 2024 | ||||
LABORERS: GROUP 6…Full textLABORERS: GROUP 6- ASBESTOS REMOVAL LABORERS/HAZ-MAT LABORERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND MILTON)) | $46.10 | $29.70 | $75.80 | Agreement |
LABORERS: GROUP 5…Full textLABORERS: GROUP 5- PRE-CAST FLOOR AND ROOF PLANK ERECTOR (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 4…Full textLABORERS: GROUP 4- BLASTER; POWDERMAN (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 3…Full textLABORERS: GROUP 3- AIR TRACK, BLOCK PAVER; HAMMER; CURB SETTER, HYDRAULIC AND SIMILAR SELF-POWERED DRILLS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 2…Full textLABORERS: GROUP 2- JACKHAMMER OPERATOR; PAVEMENT BREAKER; ASPHALT RAKER CARBIDE CORE DRILLING MACHINE; CHAIN SAW OPERATOR; PIPELAYER; BARCO TYPE JUMPING TAMPERS; LASER BEAM; CONCRETE PUMP; MASON TENDER; MOTORIZED MORTAR MIXER; RIDE-ON MOTORIZED BUGGY; FENCE AND BEAM RAIL ERECTOR (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
LABORERS: GROUP 1…Full textLABORERS: GROUP 1- LABORERS; CARPENTER TENDERS (COUNTIES OF BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (WITH THE EXCEPTION OF ARLINGTON, BELMONT, BURLINGTON, CAMBRIDGE, EVERETT, MALDEN, MEDFORD, MELROSE, READING, SOMERVILLE, STONEHAM, WAKFIELD, WINCHESTER, WINTHROP AND WOBURN); NORFOLK (WITH THE EXCEPTION OF BROOKLINE, DEDHAM AND MILTON)) | $38.95 | $29.70 | $68.65 | Agreement |
| LABO1421-004 · Laborers agreement, December 2, 2024 | ||||
LABORERS:, WRECKING: GROUP 6…Full textLABORERS:, WRECKING: GROUP 6 ASBESTOS, LEAD PAINT, TOXIC AND HAZARDOUS WASTE. (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES) | $46.25 | $29.70 | $75.95 | Agreement |
LABORERS:, WRECKING: GROUP 5…Full textLABORERS:, WRECKING: GROUP 5 YARDMAN, BURNERS, SAWYERS. (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES) | $45.35 | $29.70 | $75.05 | Agreement |
LABORERS:, WRECKING: GROUP 4…Full textLABORERS:, WRECKING: GROUP 4 YARDMAN (SALVAGE YARD ONLY). (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES) | $42.25 | $29.70 | $71.95 | Agreement |
LABORERS:, WRECKING: GROUP 3…Full textLABORERS:, WRECKING: GROUP 3 SMALL BACKHOES, LOADERS ON TRACKS, BOBCAT TYPE LOADERS, HYDRAULIC ""BROCK"" TYPE HAMMER OPERATORS, CONCRETE CUTTING SAWS. (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES) | $47.25 | $29.70 | $76.95 | Agreement |
LABORERS:, WRECKING: GROUP 2…Full textLABORERS:, WRECKING: GROUP 2 BURNERS, JACKHAMMERS. (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES) | $47.00 | $29.70 | $76.70 | Agreement |
LABORERS:, WRECKING: GROUP 1…Full textLABORERS:, WRECKING: GROUP 1 ADZEMAN, WRECKING LABORER. (BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES) | $46.25 | $29.70 | $75.95 | Agreement |
| PAIN0011-007 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| GLAZIER (BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES) FOOTNOTE: A. PAID HOLIDAY: LABOR DAY (PROVIDED EMPLOYEE HAS WORKED ANY PART OF THE WEEK PRIOR TO LABOR DAY AND ANY PART OF THE WEEK AFTER LABOR DAY) | $43.13 | $21.00 | $64.13 | Agreement |
| PAIN0035-004 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| PAINTER SPRAY, SANDBLAST (REPAINT:) | $45.72 | $36.00 | $81.72 | Agreement |
| PAINTER SPRAY, SANDBLAST (NEW CONSTRUCTION:) | $47.66 | $36.00 | $83.66 | Agreement |
| PAINTER BRUSH, TAPER (REPAINT:) | $44.32 | $36.00 | $80.32 | Agreement |
| PAINTER BRUSH, TAPER (NEW CONSTRUCTION:) | $46.26 | $36.00 | $82.26 | Agreement |
| PAIN0035-013 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| PAINTER SPRAY, SANDBLAST (REPAINT:) | $45.72 | $36.00 | $81.72 | Agreement |
| PAINTER SPRAY, SANDBLAST (NEW CONSTRUCTION:) | $47.66 | $36.00 | $83.66 | Agreement |
| PAINTER BRUSH, TAPER (REPAINT:) | $44.32 | $36.00 | $80.32 | Agreement |
| PAINTER BRUSH, TAPER (NEW CONSTRUCTION:) | $46.26 | $36.00 | $82.26 | Agreement |
| PAIN0035-020 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| GLAZIER (ESSEX; MIDDLESEX; NORFOLK; SUFFOLK) | $46.26 | $36.00 | $82.26 | Agreement |
| PLAS0534-001 · Plasterers and Cement Masons agreement, July 1, 2024 | ||||
| CEMENT MASON/CONCRETE FINISHER (ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY) | $49.19 | $40.86 | $90.05 | Agreement |
| PLAS0534-004 · Plasterers and Cement Masons agreement, July 1, 2024 | ||||
Group definitions, zones and premiums for PLAS0534-004PLASTERER (MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES).$ 49.19 40.86 | ||||
| PLUM0004-001 · Plumbers and Pipefitters agreement, September 1, 2025 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (MIDDLESEX (ASHBY, AYER-WEST OF GREENVILLE BRANCH OF BOSTON AND MAINE RAILROAD, FT. DEVENS, GROTON, SHIRLEY, TOWNSEND)) | $55.00 | $31.57 | $86.57 | Agreement |
| PLUM0012-005 · Plumbers and Pipefitters agreement, March 2, 2025 | ||||
PLUMBER (ESSEX (AMES…Full textPLUMBER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, MIDDLETON, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, TOPSFIELD, WENHAM, WEST NEWBURY)) | $69.84 | $36.43 | $106.27 | Agreement |
| PLUM0012-007 · Plumbers and Pipefitters agreement, March 2, 2025 | ||||
PLUMBER (ESSEX (LYNN…Full textPLUMBER (ESSEX (LYNN, LYNNFIELD, NAHANT, SAUGUS, AND SWAMPSCOTT); MIDDLESEX (ACTON, ARLINGTON, ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT, BILLERICA, BOXBORO, BURLINGTON, CAMBRIDGE, CARLISE, CHELMSFORD, CONCORD, DRACUT, DUNSTABLE, EVERETT, FRAMINGHAM, HUDSON, HOLLIISTON, HOPKINTON, LEXINGTON, LINCOLN, LITTLETON, LOWELL, MALDEN, MARLBORO, MAYNARD, MEDFORD, MELROSE, NATICK, NEWTON, NORTH READING, PEPPERELL, READING, SHERBORN, SOMERVILLE, STON | $69.84 | $36.43 | $106.27 | Agreement |
| PLUM0051-004 · Plumbers and Pipefitters agreement, August 26, 2024 | ||||
PLUMBERS AND PIPEFITTERS…Full textPLUMBERS AND PIPEFITTERS (BARNSTABLE; BRISTOL; DUKES; NANTUCKET; AND NORFOLK (AVON, HOLBROOK, RANDOLPH, STOUGHTON) COUNTIES) | $52.49 | $33.60 | $86.09 | Agreement |
| PLUM0537-005 · Plumbers and Pipefitters agreement, March 1, 2025 | ||||
PIPEFITTER (ESSEX (AMES…Full textPIPEFITTER (ESSEX (AMES, ANDOVER, BEVERLY, BOXFORD, BYFIELD, DANVERS, ESSEX, GEORGETOWN, GLOUCESTER, GROVELAND, HAMILTON, HAVERHILL, IPSWICH, LAWRENCE, LYNN, LYNNFIELD, MANCHESTER, MARBLEHEAD, MERRIMAC, METHUEM, MIDDLETON, NAHANT, NEWBURY, NEWBURYPORT, NORTH ANDOVER, PEABODY, ROCKPORT, ROWLEY, SALEM, SALISBURY, SAUGUS, SWAMPSCOTT,TOPSFIELD, WENHAM, WEST NEWBURY); MIDDLESEX (ACTON, ARLINGTON, ASHFORD, AYER-EXCEPT WEST OF GREENVILLE BRANCH OF BOSTON & MAINE RAIL ROAD, BEDFORD, BELMONT, BILLER | $66.58 | $39.22 | $105.80 | Agreement |
| ROOF0033-001 · Roofers agreement, August 1, 2025 | ||||
ROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING…Full textROOFERS: (ALL TEAR-OFF AND/OR REMOVAL OF ANY TYPES OF ROOFING AND ALL SPUDDING, SWEEPING, VACUUMING AND/OR CLEANUP OF ANY AND ALL AREAS OF ANY TYPE WHERE A ROOF IS TO BE RELAID) | $53.53 | $35.69 | $89.22 | Agreement |
| SFMA0550-001 · SFMA, October 1, 2025 | ||||
SPRINKLER FITTER (BRISTOL…Full textSPRINKLER FITTER (BRISTOL (PORTION WITHIN 35 MILE RADIUS FROM BOSTON CITY HALL; MIDDLESEX (EXCEPT ASHBY, TOWNSEND, AND PORTIONS OF PEPPERELL AND SHIRLEY BEYOND 35 MILE RADIUS FROM BOSTON CITY HALL); NORFOLK; PLYMOUTH (PORTION WITHIN 35 MILE RADIUS OF BOSTON CITY HALL); SUFFOLK) A. PAID HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS BEEN IN THE EMPLOYMENT OF A CONTRACTOR 20 WORKING DAYS PRIOR TO ANY SUCH PAID HOLIDAY | $72.05 | $40.76 | $112.81 | SFMA |
| SFMA0550-002 · SFMA, October 1, 2025 | ||||
| SPRINKLER FITTER (BRISTOL (SEEKONK, SWANSEA, AND SOMERSET)) A. PAID HOLIDAYS: MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS BEEN IN THE EMPLOYMENT OF A CONTRACTOR 20 WORKING DAYS PRIOR TO ANY SUCH PAID HOLIDAY | $64.85 | $40.76 | $105.61 | SFMA |
| SFMA0669-001 · SFMA, April 1, 2025 | ||||
SPRINKLER FITTER (BARNSTABLE…Full textSPRINKLER FITTER (BARNSTABLE; BRISTOL (BEYOND 35 MILE RADIUS OF BOSTON CITY HALL); DUKES; MIDDLESEX (ASHBY, TOWNSEND, PORTIONS OF PEPPERELL AND SHIRLEY BEYOND 35 MILE RADIUS OF BOSTON CITY HALL); NANTUCKET; PLYMOUTH (BEYOND 35 MILE RADIUS OF BOSTON CITY HALL)) | $53.25 | $29.75 | $83.00 | SFMA |
| SHEE0017-003 · Sheet Metal Workers agreement, April 1, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER (ESSEX; MIDDLESEX; NORFOLK; PLYMOUTH (EXCEPT EXCEPT MARION, MATTAPOISETT, ROCHESTER, WAREHAM); SUFFOLK) | $60.00 | $48.78 | $108.78 | Agreement |
| SHEE0017-007 · Sheet Metal Workers agreement, October 1, 2025 | ||||
Group definitions, zones and premiums for SHEE0017-007SHEET METAL WORKER (BARNSTABLE; BRISTOL (ACUSHNET, ASSONET, DARTMOUTH, DIGHTON, FAIRHAVEN, FALL RIVER, FREETOWN, NEW BEDFORD, REHOBOTH, SEEEKONK, SOMERSET, SWANSEA, WESTPORT); DUKES; AND NANTUCKET).$ 43.60 38.49 | ||||
| TEAM0379-001 · Teamsters agreement, June 1, 2025 | ||||
TRUCK DRIVERS: GROUP 7…Full textTRUCK DRIVERS: GROUP 7 TRAILERS FOR EARTH MOVING EQUIPMENT (DOUBLE HOOKUP) POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.82 | $37.35 | $79.17 | Agreement |
TRUCK DRIVERS: GROUP 6…Full textTRUCK DRIVERS: GROUP 6 SPECIALIZED EARTH MOVING EQUIPMENT OVER 35 TONS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.53 | $37.35 | $78.88 | Agreement |
TRUCK DRIVERS: GROUP 5…Full textTRUCK DRIVERS: GROUP 5 SPECIALIZED EARTH MOVING EQUIPMENT UNDER 35 TONS OTHER THAN CONVENTIONAL TYPE TRUCKS; LOW BED; VACHUAL; MECHANICS, PAVING RESTORATION EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.24 | $37.35 | $78.59 | Agreement |
TRUCK DRIVERS: GROUP 4…Full textTRUCK DRIVERS: GROUP 4 FOUR AND FIVE AXLE EQUIPMENT POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.14 | $37.35 | $78.49 | Agreement |
TRUCK DRIVERS: GROUP 3…Full textTRUCK DRIVERS: GROUP 3 THREE AXLE EQUIPMENT AND TIREMAN POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $41.02 | $37.35 | $78.37 | Agreement |
TRUCK DRIVERS: GROUP 2…Full textTRUCK DRIVERS: GROUP 2 TWO AXLE EQUIPMENT; & FORKLIFT OPERATOR POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.95 | $37.35 | $78.30 | Agreement |
TRUCK DRIVERS: GROUP 1…Full textTRUCK DRIVERS: GROUP 1 STATION WAGONS; PANEL TRUCKS; AND PICKUP TRUCKS POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY B. PAID VACATION: EMPLOYEES WITH 4 MONTHS TO 1 YEAR OF SERVICE RECEIVE 1/2 DAY'S PAY PER MONTH; 1 WEEK VACATION FOR 1 - 5 YEARS OF SERVICE; 2 WEEKS VACATION FOR 5 - 10 YEARS OF SERVICE; AND 3 WEEKS VACATION FOR MORE THAN 10 YEARS OF SERVICE | $40.78 | $37.35 | $78.13 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on MA20260001?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator