Prevailing wage rates · Kentucky · Wage determination
Prevailing wage rates: Daviess, Hancock and McLean Counties, Kentucky
Building construction · KY20260103 modification 2, published May 18, 2026
The short answer
This sheet sets 38 classifications for building work in Daviess, Hancock and McLean Counties, Kentucky. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $19.08 an hour (laborer: pipelayer) to $72.29 (boilermaker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0040-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $43.85 | $28.44 | $72.29 | Agreement |
| ELEC1701-002 · Electrical Workers (IBEW) agreement, July 1, 2024 | ||||
| ELECTRICIAN | $37.10 | $20.03 | $57.13 | Agreement |
| ENGI0181-053 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE; 250 FEET AND OVER, INCLUDING JIB, SHALL RECEIVE $1.50 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH | $40.65 | $19.60 | $60.25 | Agreement |
| ENGI0181-054 · Operating Engineers agreement, June 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR (DRILL) | $40.65 | $19.60 | $60.25 | Agreement |
| ENGI0181-079 · Operating Engineers agreement, June 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: LOADER | $40.65 | $19.60 | $60.25 | Agreement |
| ENGI0181-080 · Operating Engineers agreement, June 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR: FORKLIFT | $40.65 | $19.60 | $60.25 | Agreement |
| ENGI0181-093 · Operating Engineers agreement, June 1, 2025 | ||||
| POWER EQUIPMENT OPERATOR (OILER) | $34.99 | $19.60 | $54.59 | Agreement |
| IRON0044-017 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: ORNAMENTAL | $37.77 | $23.90 | $61.67 | Agreement |
| LABO0561-009 · Laborers agreement, April 1, 2025 | ||||
| LABORER: MASON TENDER - BRICK | $28.89 | $19.20 | $48.09 | Agreement |
| LABO1392-012 · Laborers agreement, July 1, 2025 | ||||
LABORER: CONCRETE SAW - HAND HELD/WALK BEHIND…Full textLABORER: CONCRETE SAW - HAND HELD/WALK BEHIND, GRADE CHECKER, JACK HAMMER, MASON TENDER - CEMENT/CONCRETE | $28.16 | $17.55 | $45.71 | Agreement |
| LABO1392-013 · Laborers agreement, July 1, 2025 | ||||
| LABORER: CARPENTER TENDER, DEMOLIOTION, FORM STRIPPING | $27.16 | $17.55 | $44.71 | Agreement |
| LABO1445-002 · Laborers agreement, June 1, 2025 | ||||
| LABORER: POWER TOOL OPERATOR | $31.35 | $23.18 | $54.53 | Agreement |
| PAIN0156-004 · Painters and Allied Trades agreement, April 1, 2024 | ||||
| PAINTER: SPRAY FOOTNOTE: A: ALL STRUCTURES OVER 40FT? $0.75/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 75FT? $1.50/ HOUR ABOVE BASE WAGE ALL STRUCTURES OVER 100FT? $2.50/ HOUR ABOVE BASE WAGE | $30.62 | $20.30 | $50.92 | Agreement |
| PAIN1165-027 · Painters and Allied Trades agreement, July 1, 2024 | ||||
| GLAZIER | $32.86 | $19.44 | $52.30 | Agreement |
| PLUM0184-006 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
| PLUMBER | $44.26 | $20.28 | $64.54 | Agreement |
| PLUM0633-003 · Plumbers and Pipefitters agreement, August 1, 2024 | ||||
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $38.41 | $22.26 | $60.67 | Agreement |
| ROOF0106-010 · Roofers agreement, July 1, 2025 | ||||
| ROOFER | $30.97 | $13.91 | $44.88 | Agreement |
| SFKY0669-002 · SFKY, April 1, 2025 | ||||
| SPRINKLER FITTER | $44.15 | $26.08 | $70.23 | SFKY |
| SHEE0020-001 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $40.19 | $27.33 | $67.52 | Agreement |
| SHEE0110-006 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $40.32 | $25.66 | $65.98 | Agreement |
| SUKY2015-042 · Survey of contractors in KY, June 2, 2015 | ||||
| TRUCK DRIVER: DUMP TRUCK | $23.60 | $8.03 | $31.63 | Survey |
| TILE SETTER | $20.96 | $0.00 | $20.96 | Survey |
| TILE FINISHER | $15.42 | $7.24 | $22.66 | Survey |
| PAINTER (BRUSH AND ROLLER) | $18.79 | $5.88 | $24.67 | Survey |
| OPERATOR: ROLLER | $23.60 | $12.65 | $36.25 | Survey |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $22.52 | $4.00 | $26.52 | Survey |
| OPERATOR: BULLDOZER | $24.51 | $12.72 | $37.23 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $27.38 | $9.10 | $36.48 | Survey |
| LABORER: PIPELAYER | $15.00 | $4.08 | $19.08 | Survey |
| LABORER: COMMON OR GENERAL | $18.71 | $7.08 | $25.79 | Survey |
| IRONWORKER, STRUCTURAL | $29.44 | $9.01 | $38.45 | Survey |
| IRONWORKER, REINFORCING | $27.31 | $16.86 | $44.17 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $20.56 | $9.56 | $30.12 | Survey |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | $20.57 | $13.25 | $33.82 | Survey |
| CARPENTER (FORM WORK ONLY) | $24.29 | $8.21 | $32.50 | Survey |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $22.10 | $14.47 | $36.57 | Survey |
| BRICKLAYER | $25.09 | $10.05 | $35.14 | Survey |
| UAVGKY0019 · Union average, January 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $30.94 | $21.99 | $52.93 | Union average |
Modification history
| Modification 1 | January 30, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on KY20260103?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator