CertifiedHours

Prevailing wage rates · Kentucky · Wage determination

Prevailing wage rates: Boyd and Greenup Counties, Kentucky

Building construction · KY20260101 modification 2, published May 18, 2026

The short answer

This sheet sets 36 classifications for building work in Boyd and Greenup Counties, Kentucky. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $24.40 an hour (operator: bulldozer) to $72.29 (boilermaker). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0008-011 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR$35.23$23.04$58.27Agreement
BOIL0040-002 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.85$28.44$72.29Agreement
BRKY0007-001 · Bricklayers agreement, June 1, 2024
INDUSTRIAL: BRICKLAYER - REFRACTORY BRICK REPLACEMENT$41.05$21.79$62.84Agreement
BRKY0018-001 · Bricklayers agreement, June 1, 2024
BRICKLAYER$35.00$17.13$52.13Agreement
CARP0472-005 · Carpenters agreement, June 1, 2025
CARPENTER$37.04$26.57$63.61Agreement
ELEC0317-005 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIAN$41.15$29.35$70.50Agreement
ENGI0181-054 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR (DRILL)$40.65$19.60$60.25Agreement
ENGI0181-079 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: LOADER$40.65$19.60$60.25Agreement
ENGI0181-090 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.50 ABOVE THE WAGE RATE

$41.98$19.60$61.58Agreement
ENGI0181-091 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: FORKLIFT$41.98$19.60$61.58Agreement
ENGI0181-093 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR (OILER)$34.99$19.60$54.59Agreement
IRON0044-017 · Ironworkers agreement, June 1, 2025
IRONWORKER: ORNAMENTAL$37.77$23.90$61.67Agreement
LABO1445-002 · Laborers agreement, June 1, 2025
LABORER: POWER TOOL OPERATOR$31.35$23.18$54.53Agreement
LABO1445-003 · Laborers agreement, June 1, 2025
LABORER: MASON TENDER - CEMENT/CONCRETE$31.20$23.18$54.38Agreement
LABO1445-004 · Laborers agreement, June 1, 2025
LABORER: FIRE WATCH$31.20$23.18$54.38Agreement
PAIN1072-002 · Painters and Allied Trades agreement, December 1, 2024
PAINTER: BRUSH AND ROLLER$31.96$23.95$55.91Agreement
PLAS0132-015 · Plasterers and Cement Masons agreement, June 1, 2025
CEMENT MASON/CONCRETE FINISHER$33.60$16.05$49.65Agreement
PLUM0248-002 · Plumbers and Pipefitters agreement, June 1, 2025
PIPEFITTER$42.75$25.76$68.51Agreement
PLUM0452-015 · Plumbers and Pipefitters agreement, November 1, 2024
PLUMBER$41.00$21.66$62.66Agreement
ROOF0042-008 · Roofers agreement, August 1, 2025
ROOFER$34.38$19.94$54.32Agreement
SFKY0669-002 · SFKY, April 1, 2025
SPRINKLER FITTER$44.15$26.08$70.23SFKY
SHEE0024-031 · Sheet Metal Workers agreement, June 1, 2023
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$33.53$26.71$60.24Agreement
SUKY2015-040 · Survey of contractors in KY, June 2, 2015
TRUCK DRIVER: DUMP TRUCK$24.35$14.59$38.94Survey
PAINTER: SPRAY$22.81$11.87$34.68Survey
OPERATOR: ROLLER$23.60$12.65$36.25Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$22.52$4.00$26.52Survey
OPERATOR: BULLDOZER$19.69$4.71$24.40Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$24.66$10.81$35.47Survey
LABORER: PIPELAYER$20.36$9.90$30.26Survey
LABORER: MASON TENDER - BRICK$21.86$9.31$31.17Survey
LABORER: COMMON OR GENERAL$23.27$13.67$36.94Survey
IRONWORKER, STRUCTURAL$25.62$18.01$43.63Survey
IRONWORKER, REINFORCING$28.38$16.89$45.27Survey
UAVGKY0016 · Union average, January 1, 2025
BRICKLAYER: TILE SETTER$35.11$18.26$53.37Union average
BRICKLAYER: TILE FINISHER$35.40$17.66$53.06Union average
UAVGKY0018 · Union average, January 1, 2025
LABORER: CARPENTER TENDER$30.95$21.83$52.78Union average

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on KY20260101?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator