Prevailing wage rates · Kentucky · Wage determination
Prevailing wage rates: McLean County, Kentucky
Heavy construction · KY20260074 modification 1, published May 18, 2026
The short answer
This sheet sets 18 classifications for heavy work in McLean County, Kentucky. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $22.89 an hour (truck driver: dump truck) to $61.97 (ironworker: ornamental and reinforcing). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| CARP0064-007 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (FORM WORK ONLY) | $33.89 | $24.06 | $57.95 | Agreement |
| ELEC1701-001 · Electrical Workers (IBEW) agreement, July 1, 2024 | ||||
| ELECTRICIAN | $37.10 | $20.03 | $57.13 | Agreement |
| ENGI0181-047 · Operating Engineers agreement, July 1, 2025 | ||||
POWER EQUIPMENT OPERATOR GROUP 4…Full textPOWER EQUIPMENT OPERATOR GROUP 4 PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.37 | $19.60 | $57.97 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 3…Full textPOWER EQUIPMENT OPERATOR GROUP 3 ARTICULATING TRUCK OPERATOR OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $39.14 | $19.60 | $58.74 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 2…Full textPOWER EQUIPMENT OPERATOR GROUP 2 BOBCAT/SKID STEER/SKID LOADER; COMPRESSOR; CONCRETE PUMP OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $38.69 | $19.60 | $58.29 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 1…Full textPOWER EQUIPMENT OPERATOR GROUP 1 BULLDOZER; CRANE; DRILL; LOADER; MECHANIC; PUMPCRETE OPERATORS ON CRANES WITH BOOMS 150 FEET AND OVER (INCLUDING JIB) SHALL RECEIVE $1.00 ABOVE GROUP 1 RATE; 250 FEET AND OVER INCLUDING JIB SHALL RECEIVE $1.50 ABOVE CLASS 1 RATE. COMBINATION RATE: ALL CRANE OPERATORS OPERATING CRANES, WHERE THE LENGTH OF THE BOOM IN COMBINATION WITH THE LENGTH OF THE PILING LEADS EQUAL OR EXCEEDS 150 FEET, SHALL RECEIVE $1.00 ABOVE THE GROUP 1 RATE. EMPLOYEES ASSIGNED TO WORK BELOW GROUND LEVEL ARE TO BE PAID 10% ABOVE BASIC WAGE RATE. THIS DOES NOT APPLY TO OPEN CUT WORK | $41.55 | $19.60 | $61.15 | Agreement |
| IRON0070-001 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: ORNAMENTAL AND REINFORCING | $36.17 | $25.80 | $61.97 | Agreement |
| LABO0265-015 · Laborers agreement, May 1, 2024 | ||||
| LABORER: FLAGGER | $35.52 | $14.45 | $49.97 | Agreement |
| LABO0561-012 · Laborers agreement, July 1, 2025 | ||||
| LABORER: CONCRETE FINISHING | $29.45 | $18.77 | $48.22 | Agreement |
| LABO1392-002 · Laborers agreement, July 1, 2025 | ||||
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND), JACK HAMMER & PIPELAYER | $29.19 | $17.59 | $46.78 | Agreement |
| LABORER: COMMON OR GENERAL, CONCRETE WORKER, GRADE CHECKER & GROUTING | $28.94 | $17.59 | $46.53 | Agreement |
| SUKY2011-030 · Survey of contractors in KY, June 25, 2014 | ||||
| TRUCK DRIVER: DUMP TRUCK | $16.69 | $6.20 | $22.89 | Survey |
| OPERATOR: TRENCHER | $26.34 | $12.58 | $38.92 | Survey |
| OPERATOR: ROLLER | $20.21 | $13.00 | $33.21 | Survey |
| OPERATOR: OILER | $24.34 | $13.00 | $37.34 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $29.81 | $13.00 | $42.81 | Survey |
| IRONWORKER, STRUCTURAL | $25.46 | $17.49 | $42.95 | Survey |
| UAVGKY0005 · Union average, January 1, 2025 | ||||
| OPERATOR: FORKLIFT | $40.05 | $19.10 | $59.15 | Union average |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on KY20260074?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.