Building construction · KY20260042 modification 1, published May 18, 2026

The short answer

This sheet sets 36 classifications for building work in Barren, Casey, Clinton and 12 more counties, Kentucky. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $23.08 an hour (laborer: common or general) to $95.85 (elevator mechanic). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0046-002 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR$30.24$18.54$48.78Agreement
BOIL0040-001 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.85$28.44$72.29Agreement
CARP1650-010 · Carpenters agreement, June 1, 2024
CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION)

$32.25$18.09$50.34Agreement
ELEC0317-005 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIAN$41.15$29.35$70.50Agreement
ELEV0011-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC

PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE

$57.41$38.44$95.85Agreement
ENGI0181-083 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$41.98$19.60$61.58Agreement
ENGI0181-084 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR (OILER)$34.99$19.60$54.59Agreement
ENGI0181-085 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH

$41.98$19.60$61.58Agreement
ENGI0181-086 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: FORKLIFT$41.98$19.60$61.58Agreement
ENGI0181-092 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: BULLDOZER$41.98$19.60$61.58Agreement
IRON0769-005 · Ironworkers agreement, June 1, 2025
IRONWORKER, REINFORCING ZONE 3 -…
Full text

IRONWORKER, REINFORCING ZONE 3 - (ADD $2.00 PER HOUR TO BASE RATE) 50 MILE RADIUS & OVER OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY

$41.70$29.59$71.29Agreement
IRONWORKER, REINFORCING ZONE 2 -…
Full text

IRONWORKER, REINFORCING ZONE 2 - (ADD $0.40 PER HOUR TO BASE RATE) 10 TO 50 MILE RADIUS OF UNION HALL, 1643 GREENUP AVE, ASHLAND, KY

$40.10$29.59$69.69Agreement
IRONWORKER, REINFORCING (ZONE 1)$39.70$29.59$69.29Agreement
LABO0189-007 · Laborers agreement, June 1, 2025
LABORER: PIPELAYER$28.53$17.38$45.91Agreement
LABO0576-011 · Laborers agreement, July 1, 2025
LABORER: CARPENTER TENDER$26.69$13.32$40.01Agreement
LABO0576-012 · Laborers agreement, July 1, 2025
LABORER: MASON TENDER - CEMENT/CONCRETE$26.89$13.32$40.21Agreement
LABO1392-004 · Laborers agreement, July 1, 2025
LABORER: MASON TENDER - BRICK$28.16$17.55$45.71Agreement
PAIN1072-005 · Painters and Allied Trades agreement, December 1, 2024
PAINTER (SPRAY ONLY)$34.29$23.95$58.24Agreement
PLUM0452-014 · Plumbers and Pipefitters agreement, November 1, 2024
PIPEFITTER$41.00$21.66$62.66Agreement
SFKY0669-001 · SFKY, April 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$44.15$26.08$70.23SFKY
SHEE0110-006 · Sheet Metal Workers agreement, June 1, 2025
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$40.32$25.66$65.98Agreement
SUKY2015-023 · Survey of contractors in KY, June 2, 2015
TRUCK DRIVER: DUMP TRUCK$17.07$6.25$23.32Survey
TILE SETTER$25.77$6.10$31.87Survey
TILE FINISHER$17.67$7.45$25.12Survey
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$25.91$8.06$33.97Survey
ROOFER$22.31$7.41$29.72Survey
PLUMBER$33.41$16.67$50.08Survey
PAINTER (BRUSH AND ROLLER)$18.20$6.43$24.63Survey
OPERATOR: GRADER/BLADE$24.33$13.00$37.33Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$21.11$13.00$34.11Survey
LABORER: COMMON OR GENERAL$16.97$6.11$23.08Survey
IRONWORKER, STRUCTURAL$22.31$15.40$37.71Survey
CEMENT MASON/CONCRETE FINISHER$27.99$0.00$27.99Survey
BRICKLAYER$24.61$11.88$36.49Survey
UAVGKY0007 · Union average, January 1, 2025
IRONWORKER: ORNAMENTAL$36.73$27.05$63.78Union average
UAVGKY0008 · Union average, January 1, 2025
LABORER: POWER TOOL OPERATOR$28.73$19.36$48.09Union average

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on KY20260042?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator