CertifiedHours

Prevailing wage rates · Kentucky · Wage determination

Prevailing wage rates: Franklin County, Kentucky

Building construction · KY20260023 modification 1, published May 18, 2026

The short answer

This sheet sets 37 classifications for building work in Franklin County, Kentucky. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $23.32 an hour (truck driver: dump truck) to $72.29 (boilermaker). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 1, but none of its modifications has changed a rate.

Latest change

May 18, 2026 · modification 1

3 classifications added

Classifications added or removed
  • Added: IRONWORKER: ORNAMENTAL $36.21 + $26.42
  • Added: LABORER: POWER TOOL OPERATOR $26.73 + $16.72
  • Added: OPERATOR: BULLDOZER $40.05 + $19.10

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0051-001 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR$30.00$20.89$50.89Agreement, 2025
BOIL0040-001 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.85$28.44$72.29Agreement, 2025
CARP1076-001 · Carpenters agreement, June 1, 2025
MILLWRIGHT$35.54$29.13$64.67Agreement, 2025
CARP1650-003 · Carpenters agreement, June 1, 2025
CARPENTER (ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION ONLY)

$37.04$26.57$63.61Agreement, 2025
ENGI0181-084 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR (OILER)$34.99$19.60$54.59Agreement, 2025
ENGI0181-085 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: CRANE CRANES WITH BOOM 150 FEET & OVER, INCLUDING JIB, SHALL RECEIVE $.75 ABOVE THE WAGE RATE. ALL CRANES WITH PILING LEADS WILL RECEIVE $.50 ABOVE THE WAGE, REGARDLESS OF BOOM LENGTH

$41.98$19.60$61.58Agreement, 2025
ENGI0181-086 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: FORKLIFT$41.98$19.60$61.58Agreement, 2025
IRON0070-004 · Ironworkers agreement, June 1, 2025
IRONWORKER, STRUCTURAL$36.17$25.80$61.97Agreement, 2025
IRON0782-015 · Ironworkers agreement, August 1, 2025
IRONWORKER, REINFORCING$35.63$26.49$62.12Agreement, 2025
LABO0189-025 · Laborers agreement, June 1, 2025
LABORER (CARPENTER TENDER, GRADE CHECKER)$28.13$17.38$45.51Agreement, 2025
LABO0189-027 · Laborers agreement, June 1, 2025
LABORER (PIPELAYER, TAMPER - HAND HELD)$28.53$17.38$45.91Agreement, 2025
LABO0189-031 · Laborers agreement, June 1, 2025
LABORER (GROUTING)$28.73$17.38$46.11Agreement, 2025
PAIN1072-006 · Painters and Allied Trades agreement, December 1, 2024
PAINTER (DRYWALL FINISHING/TAPING AND SPRAY ONLY)$34.29$23.95$58.24Agreement, 2024
PLUM0452-021 · Plumbers and Pipefitters agreement, November 1, 2024
PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION)$41.00$21.66$62.66Agreement, 2024
SFKY0669-002 · SFKY, April 1, 2025
SPRINKLER FITTER$44.15$26.08$70.23SFKY
SHEE0110-006 · Sheet Metal Workers agreement, June 1, 2025
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$40.32$25.66$65.98Agreement, 2025
SUKY2015-005 · Survey of contractors in KY, June 2, 2015
TRUCK DRIVER: DUMP TRUCK$17.07$6.25$23.32Survey, 2015
TILE SETTER$25.77$6.10$31.87Survey, 2015
TILE FINISHER$17.67$7.45$25.12Survey, 2015
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$27.74$13.20$40.94Survey, 2015
ROOFER$22.31$7.41$29.72Survey, 2015
PLUMBER$30.36$13.62$43.98Survey, 2015
PAINTER (BRUSH AND ROLLER)$21.28$11.14$32.42Survey, 2015
OPERATOR: GRADER/BLADE$24.33$13.00$37.33Survey, 2015
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$24.64$13.00$37.64Survey, 2015
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$24.55$10.61$35.16Survey, 2015
LABORER: MASON TENDER - CEMENT/CONCRETE$23.17$10.05$33.22Survey, 2015
LABORER: MASON TENDER - BRICK$22.36$10.76$33.12Survey, 2015
LABORER: COMMON OR GENERAL$20.67$7.65$28.32Survey, 2015
ELECTRICIAN$29.53$12.94$42.47Survey, 2015
CEMENT MASON/CONCRETE FINISHER$20.92$10.90$31.82Survey, 2015
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION

$22.53$10.25$32.78Survey, 2015
CARPENTER (FORM WORK ONLY)$19.97$9.54$29.51Survey, 2015
BRICKLAYER$23.53$11.62$35.15Survey, 2015
UAVGKY0010 · Union average, January 1, 2025
IRONWORKER: ORNAMENTAL$36.21$26.42$62.63Union average
UAVGKY0012 · Union average, January 1, 2025
LABORER: POWER TOOL OPERATOR$26.73$16.72$43.45Union average
UAVGKY0013 · Union average, January 1, 2025
OPERATOR: BULLDOZER$40.05$19.10$59.15Union average

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on KY20260023?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and KY20260023 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 37 classifications in 20 rate groups
  • 15 from agreements, 1 from surveys
  • Counties: Franklin