Heavy construction · KS20260159 modification 1, published May 18, 2026

The short answer

This sheet sets 17 classifications for heavy work in Sedgwick County, Kansas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $18.91 an hour (laborer: pipelayer) to $80.12 (line construction: lineman). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification.

Latest change

May 18, 2026 · modification 1

1 fringe formula changed

  • Line construction: 1 fringe formula changed
Every line that changed (1)
ClassificationWasNowChange
LINE CONSTRUCTION: LINEMAN$53.68 + 29.5%+10.60$53.68 + $26.44changed

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
ELEC0271-006 · Electrical Workers (IBEW) agreement, May 31, 2025
ELECTRICIAN$40.64$18.29$58.93no changeAgreement, 2025
ELEC0304-001 · Electrical Workers (IBEW) agreement, June 29, 2025
LINE CONSTRUCTION: LINEMAN$53.68$26.44$80.12changedAgreement, 2025
ENGI0101-048 · Operating Engineers agreement, April 1, 2024
POWER EQUIPMENT OPERATOR: GRADER/BLADE$39.57$21.69$61.26no changeAgreement, 2024
POWER EQUIPMENT OPERATOR: FORKLIFT$39.57$21.69$61.26no changeAgreement, 2024
POWER EQUIPMENT OPERATOR: BULLDOZER$39.57$21.69$61.26no changeAgreement, 2024
IRON0010-002 · Ironworkers agreement, April 1, 2025
IRONWORKER$39.00$34.25$73.25no changeAgreement, 2025
PLAS0518-003 · Plasterers and Cement Masons agreement, April 1, 2025
CEMENT MASON/CONCRETE FINISHER$39.06$18.71$57.77no changeAgreement, 2025
SUKS2022-012 · Survey of contractors in KS, September 15, 2022
TRUCK DRIVER: DUMP TRUCK$24.95$9.62$34.57no changeSurvey, 2022
OPERATOR: ROLLER$31.50$16.88$48.38no changeSurvey, 2022
OPERATOR: LOADER$20.14$3.64$23.78no changeSurvey, 2022
OPERATOR: CRANE$29.82$6.41$36.23no changeSurvey, 2022
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$24.45$8.52$32.97no changeSurvey, 2022
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$22.92$6.20$29.12no changeSurvey, 2022
LABORER: PIPELAYER$16.03$2.88$18.91no changeSurvey, 2022
LABORER: COMMON OR GENERAL$15.84$3.59$19.43no changeSurvey, 2022
CARPENTER, EXCLUDES FORM WORK$24.15$6.18$30.33no changeSurvey, 2022
CARPENTER (FORM WORK ONLY)$19.22$3.07$22.29no changeSurvey, 2022

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on KS20260159?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and KS20260159 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 17 classifications in 6 rate groups
  • 5 from agreements, 1 from surveys
  • Counties: Sedgwick